2011 Modesto Stormwater Guidance Manual (PDF)

2011 Modesto Stormwater Guidance Manual (PDF)

CITY OF MODESTO STORMWATER MANAGEMENT PROGRAM 2011 Guidance Manual for Development Stormwater Quality Control Measures Prepared for NPDES Permit No. CAS083526; Order R5-2008-0092 This page intentionally left blank. Table of Contents Section 1. Introduction ........................................................................................... 1-1 1.1. Purpose and Goals ......................................................................................... 1-1 1.2. Background ..................................................................................................... 1-1 1.3. 2008 Municipal Stormwater Permit Requirements .......................................... 1-2 1.4. Low Impact Development Strategies ............................................................... 1-2 1.5. Updates to the Guidance Manual: Key Concepts ........................................... 1-4 1.6. Stormwater Quality Requirements vs. Flood Control Requirements ............... 1-5 1.7. Organization of the 2011 Guidance Manual .................................................... 1-6 Section 2. Guidance Manual Overview and Use .................................................... 2-1 2.1. Implementation Schedule ................................................................................ 2-1 2.2. Process to Comply with City Standards .......................................................... 2-1 Step 1: Determine if the Project is Subject to the 2011 Guidance Manual ........... 2-2 Step 2. Conduct Site Assessment ........................................................................ 2-5 Step 3: Apply Site Design Control Measures ....................................................... 2-6 Step 4: Apply Source Control Measures .............................................................. 2-6 Step 5: Calculate Volume Retention Requirement ............................................... 2-7 Step 6: Apply Low Impact Development Control Measures ................................. 2-7 Step 7: Apply Treatment Control Measures ......................................................... 2-9 Step 8: Determine Additional Retention Volume, if necessary ............................. 2-9 Step 9: Submit Project Stormwater Quality Control Measures Plan and Maintenance Plan ................................................................................................. 2-9 Section 3. Site Assessment .................................................................................... 3-1 3.1. Assessing Site Conditions and Other Constraints ........................................... 3-1 Project Location .................................................................................................... 3-1 Site Conditions ...................................................................................................... 3-2 3.2. Pollutants of Concern ...................................................................................... 3-4 Section 4. Site Design Control Measures ............................................................... 4-1 4.1. Introduction ..................................................................................................... 4-1 4.2. Description ...................................................................................................... 4-1 G-1: Site Planning ................................................................................................ 4-2 G-2: Protect and Restore Natural Areas .............................................................. 4-3 G-3: Minimize Land Disturbance .......................................................................... 4-4 G-4: Minimize Impervious Area ............................................................................ 4-6 City of Modesto i May 2011 Stormwater Management Program Section 5. Source Control Measures ...................................................................... 5-1 5.1. Introduction ..................................................................................................... 5-1 5.2. Description ...................................................................................................... 5-1 S-1: Storm Drain Message and Signage .............................................................. 5-3 S-2: Outdoor Material Storage Area ..................................................................... 5-5 S-3: Outdoor Trash Storage and Waste Handling Area ....................................... 5-8 S-4: Outdoor Loading/Unloading Dock Area ...................................................... 5-10 S-5: Outdoor Vehicle/Equipment Repair/Maintenance Area .............................. 5-12 S-6: Outdoor Vehicle/Equipment/Accessory Washing Area ............................... 5-14 S-7: Fuel and Maintenance Area........................................................................ 5-16 S-8: Building Materials ....................................................................................... 5-19 Section 6. Volume Retention Requirement and Water Quality Volume/Water Quality Flow .............................................................................................................. 6-1 6.1. Introduction ..................................................................................................... 6-1 6.2. Volume Retention Requirement ...................................................................... 6-1 C-1: Volume Retention Requirement Calculation ................................................. 6-2 Example Calculation ............................................................................................. 6-2 C-2: Water Quality Flow /Water Quality Volume Calculation ................................ 6-4 Section 7. Low Impact Development Control Measures ......................................... 7-1 7.1. Introduction ..................................................................................................... 7-1 7.2. Description of Low Impact Development Control Measures ............................ 7-2 L-1: Rain Garden .................................................................................................. 7-3 L-2: Rain Barrel/Cistern ........................................................................................ 7-8 L-3: Vegetated Roof ........................................................................................... 7-12 L-4: Interception Trees ....................................................................................... 7-17 L-5: Grassy Channel .......................................................................................... 7-20 L-6: Vegetated Buffer Strips ............................................................................... 7-28 Section 8. Treatment Control Measures ................................................................. 8-1 8.1. Introduction ..................................................................................................... 8-1 8.2. Selection of Treatment Controls ...................................................................... 8-4 Volume Retention Requirement ............................................................................ 8-4 Volume Retention Requirement Waiver ................................................................ 8-4 8.3. Description of Treatment Control Measures .................................................... 8-5 R-1: Infiltration Well .............................................................................................. 8-8 City of Modesto ii May 2011 Stormwater Management Program R-2: Water Quality Infiltration Basin ................................................................... 8-13 R-3: Water Quality Infiltration Trench ................................................................. 8-20 R-4: Bioretention without an Underdrain ............................................................ 8-26 R-5: Dry Well ...................................................................................................... 8-31 R-6: French Drain ............................................................................................... 8-36 R-7: Permeable Pavement without an Underdrain ............................................. 8-37 R-8: Bioretention with an Underdrain ................................................................. 8-43 R-9: Permeable Pavement with an Underdrain .................................................. 8-49 R-10: Stormwater Planter ................................................................................... 8-55 R-11: Tree-Well Filter ......................................................................................... 8-63 R-12: Vegetated Swales .................................................................................... 8-71 R-13: Grassy Swale ........................................................................................... 8-79 R-14: Vegetated Filter Strip ................................................................................ 8-86 C-1: Media Filter ................................................................................................. 8-92 C-2: Constructed Wetland ................................................................................ 8-116 C-3: Extended Detention Basin ........................................................................ 8-126 C-4: Wet Pond.................................................................................................. 8-137 P-1: Proprietary Treatment Control Measures.................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    340 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us