Offshore Technology Yearbook

Offshore Technology Yearbook

Offshore Technology Yearbook 2 O19 Generation V: power for generations Since we released our fi rst offshore direct drive turbines, we have been driven to offer our customers the best possible offshore solutions while maintaining low risk. Our SG 10.0-193 DD offshore wind turbine does this by integrating the combined knowledge of almost 30 years of industry experience. With 94 m long blades and a 10 MW capacity, it generates ~30 % more energy per year compared to its predecessor. So that together, we can provide power for generations. www.siemensgamesa.com 2 O19 20 June 2019 03 elcome to reNEWS Offshore Technology are also becoming more capable and the scope of Yearbook 2019, the fourth edition of contracts more advanced as the industry seeks to Wour comprehensive reference for the drive down costs ever further. hardware and assets required to deliver an As the growth of the offshore wind industry offshore wind farm. continues apace, so does OTY. Building on previous The offshore wind industry is undergoing growth OTYs, this 100-page edition includes a section on in every aspect of the sector and that is reflected in crew transfer vessel operators, which play a vital this latest edition of OTY. Turbines and foundations role in servicing the industry. are getting physically larger and so are the vessels As these pages document, CTVs and their used to install and service them. operators are evolving to meet the changing needs The growing geographical spread of the sector of the offshore wind development community. So is leading to new players in the fabrication space too are suppliers of installation vessels, cable-lay springing up and players in other markets entering vessels, turbines and other components. or re-entering the fray. In addition, offshore vessels We hope you enjoy reNEWS OTY 2019. n CURRENT HISTORIC FLOATING TURBINES TURBINES CONCEPTS p04 p18 p44 INSTALLATION CABLE-LAY CTV VESSELS VESSELS OPERATORS p53 p73 p80 CONTENTS FABRICATION INDEX YARDS p91 p98 Images are reproduced An index of offshore courtesy of the wind farms and the relevant manufacturer/ owner-operator unless turbine models deployed otherwise stated. along with a cross- reference to their main Front cover image: OTY2019 listings. Dudgeon offshore wind farm courtesy of Jan Arne Wold & Equinor. SPONSORED BY 2 O19 20 June 2019 04 SPONSORED BY Leading manufacturers stretch existing technology to the limit to meet demand, while testing the uncharted waters of a 12MW-plus future, writes Stephen Dunne he arms race for In addition, Rasmussen out of existing technology was to size the turbine with the biggest and believes new global markets and boosting annual energy the biggest rotor diameter Tmost powerful that feature different production efficiently is always and power output that we next-generation offshore conditions, including extreme a focus.” felt comfortable with…while turbines is the headline- temperatures, earthquakes Jorgensen said incremental still keeping it light enough grabbing act in an ongoing and typhoons, will mean improvements, which MHI for existing installation battle for supremacy, manufacturers need diverse Vestas has made since cranes and suitable for all but manufacturers are portfolios of turbines. the Japanese-Danish outfit type of foundations including increasingly looking at how “When we look 10 years installed its first V164-8.0MW monopiles.” to tailor current platforms ahead the product portfolio units in 2017, are enhancing Senvion is meanwhile for market and site-specific for running a large offshore the business case for continuing work on a 12MW- conditions. manufacturer will be more developers. plus turbine in the ReaLCoE Market leaders MHI complex than it is today,” “There will still be a market consortium, which includes Vestas and Siemens Gamesa he said, pointing out that for 8-10MW turbines, even as EnBW, Jan De Nul, Principle have both in the last year turbines of around 4MW will power output extends beyond Power and others. launched turbines based still be required for nearshore that range. New markets However, Siemens Gamesa on a series of evolutionary sites. bring new site conditions and MHI Vestas are both steps in technology from their The German-Spanish and possible regulatory more cautious about what current platforms, as they company will install its 10.0- restrictions.” comes next. look to offer machines that 193 prototype in Denmark Siemens Gamesa is hit the sweet spot for project in the autumn and is anufacturers continuing work on a so- characteristics. already active in the market of turbines are called 1X platform for its Siemens Gamesa offshore with potential customers. Mmeanwhile continuing next-generation offering, set head of technology Morten Vattenfall has selected the to develop next-generation, to come to market around Pilgaard Rasmussen said turbine for the 760MW 12MW-plus units to satisfy 2025, but Rasmussen said customers want to build Hollande Kust Zuid 1&2 the demands of a developer the business case “upside” for business cases around project off the Dutch coast, community focused on larger hardware is not as clear performance reliability due online by 2023. slashing the levelised cost of as in the past. and platform track record, MHI Vestas meanwhile energy in the next decade. “To make a good business and manufacturers are has launched a V174-9.5MW GE Renewable Energy case requires more than responding by looking at turbine, which will feature a was first out of the traps just scaling. It requires new how they can optimise their 174-metre rotor, 10 metres with its 12MW Haliade-X unit technologies that allow for turbine models. larger than on its V164 featuring a 220-metre rotor. smarter designs.” The manufacturer is workhorse. Iberdrola has A prototype will be installed The manufacturer is offering a 10MW turbine chosen the new machine for later this year in the Dutch working on several new with a 193-metre rotor, up its 476MW Baltic Eagle site in port of Rotterdam and while technologies, including from the existing 167-metre the German Baltic Sea with no firm orders are confirmed those that manage loads, to iteration, plus tweaks delivery and installation slated the US company is working counter the technical hurdles including a new nacelle layout for 2022 and 2023. with developers, including associated with the square and upscaled components. MHI Vestas technology Vattenfall, for deployment of cube law, which states that A longer rotor is the key chief project manager Henrik the machine in Europe and when an object grows in size focus at present, driven Baek Jorgensen said one of further afield. its volume increases faster largely by the belief that the company’s key focuses GE has worked closely than its surface area. developers are looking at is leveraging its existing with the supply chain during MHI Vestas’ Jorgensen said increasing revenue in low platform. the design of the turbine to new platforms are “costly” wind periods, particularly “We want to protect the ensure companies are ready and must be considered “very in northern European track record of our platform to handle manufacturing and carefully” but the company is markets. as this is what is making installation of the machine, exploring all options. “That does not mean that new, enhanced turbines said Vincent Schellings, “In addition, the logistics offshore wind is turning into bankable,” he added. “There general manager of product cost – ships, cranes, tools – a low wind business but the may be too much focus in the management in its offshore scales dramatically. So, it is capacity factor will be more media on megawatt rating, wind business. about finding the sweet spot important going forward,” he but for those of us in the He added: “The biggest where the business case is at said. industry maximising value challenge at the beginning its optimum.” n CURRENT TURBINES The V174-9.5 MW® Built on bankable and proven technology, available for markets worldwide. facebook.com/ linkedin.com/ 0+,9HVWDV2ƪVKRUH:LQG FRPSDQ\PKLYHVWDVRƪVKRUHZLQG youtube.com/ twitter.com/ 0+,9HVWDV2ƪVKRUH:LQG MHIVestas PKLYHVWDVRƪVKRUHFRP MVOW_V174 ad for EOD_150 dpi_RGB.indd 1 31-05-2019 10:54:53 SPONSORED BY 2 O19 20 June 2019 06 2-B Energy 2B6 PROJECT DEPLOYMENT VITAL STATISTICS IEC class I Key characteristics Offshore projects Rotor diameter 140.6m Two-bladed downwind turbine designed for a 40-year service life with ‘an integral Under development Power rating 6.0MW plant approach’. The design has two nacelle levels, a passive cooler platform, a Number of blades 2 self-aligning ‘soft yaw’ system, and a lattice-type welded truss tower. The latter ‘open’ Product status Orientation Downwind structure extends from the seabed to the nacelle yaw bearing. Demonstration in operation since 2016 in Operation Pitch-controlled variable speed Eemshaven, the Netherlands Head mass N/A Product notes Specific power 386W/m2 1. 6.2MW configuration with potential 12MW machine under design. Track record Prototype 2015 2. Modular platform design aimed at rapid upscaling in line with market demand. 1 (onshore prototype) Introduction 2007 3. ‘Soft yaw’ capability means the rotor follows wind direction changes automatically Usage Offshore in normal operating mode, and then only requires some nacelle yaw dampening Power electronics Medium voltage motion. In emergency situations, like a combination of extreme weather and/or generation system eliminates full size turbine failure, eight yaw motors are activated for bringing the turbine into a safe transformer at turbine level non-operating position. The extra ninth motor provides system redundancy. Drive train Non-integrated high-speed 4. Power generation at 10kV. geared, four-point gearbox support, 5. Small MV transformer connects the modular converter and other power consumers. three-stage gearbox with side torque supports and a DFIG Aeromaster 5.0 PROJECT DEPLOYMENT VITAL STATISTICS IEC class IIB Key characteristics Offshore projects Rotor diameter 139m Compact high-speed geared Aeromaster 0 Power rating 5.0MW wind turbine design, available with either Number of blades 3 squirrel-cage induction type generator Product status Orientation Upwind or PMG.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    100 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us