CROSSRAIL PLUMSTEAD SIDINGS ENVIRONMENTAL STATEMENT VOLUME 1 Document Number: C122-OVE-T1-XST-CR148-50004 Submission Ref. GRE/2/9 Document History: Revision: Date: Prepared by: Checked by: Approved by: Reason for Issue: 1.0 23/8/2013 Vic Buljubasic Paul White Rob McCrae Draft ES for Client review 2.0 15/10/2013 Vic Buljubasic Paul White Rob McCrae TWAO Application Document uncontrolled once printed. All controlled documents are saved on the CRL Document System © Crossrail Limited Page 1 of 93 Crossrail Plumstead Sidings Environmental Statement C122-OVE-T1-XST-CR148-50004 Submission Ref. GRE/2/9 Page 2 of 93 Document uncontrolled once printed. All controlled documents are saved on the CRL Document System © Crossrail Limited Crossrail Plumstead Sidings Environmental Statement C122-OVE-T1-XST-CR148-50004 Submission Ref. GRE/2/9 Contents Abbreviations ................................................................................................................ 8 PART I Background ....................................................................................................... 9 1 Background ............................................................................................................. 10 1.1 Overview of the Proposed Development ................................................................ 10 1.2 Crossrail Context ...................................................................................................... 11 1.3 Crossrail Act Deemed Planning Permission .......................................................... 11 1.4 Requirement for a Transport and Works Act Order .............................................. 12 1.5 Requirement for an Environmental Impact Assessment ...................................... 13 1.6 Need for the Development ....................................................................................... 15 1.7 Site Selection and Alternatives ............................................................................... 16 PART II Proposed Development ............................................................................... 18 2 Proposed Development .......................................................................................... 19 2.1 Site Location ............................................................................................................. 19 2.2 Site Description ........................................................................................................ 19 2.3 Site Conditions for TWAO Application ................................................................... 20 2.4 Functional Requirements of the Proposed Development ..................................... 21 2.5 Proposed Site Layout ............................................................................................... 22 2.6 Proposed Construction Works and Programme ................................................... 24 2.7 Operational Use ........................................................................................................ 25 PART III EIA ................................................................................................................. 26 3 Environmental Impact Assessment....................................................................... 27 3.1 Background ............................................................................................................... 27 3.2 Scoping ...................................................................................................................... 28 3.3 Baseline ..................................................................................................................... 29 3.4 Preparation of the Environmental Statement ......................................................... 30 Page 3 of 93 Document uncontrolled once printed. All controlled documents are saved on the CRL Document System © Crossrail Limited Crossrail Plumstead Sidings Environmental Statement C122-OVE-T1-XST-CR148-50004 Submission Ref. GRE/2/9 4 Assessment and Methodology .............................................................................. 30 4.1 Approach and Assumptions .................................................................................... 30 4.2 Baseline Data Collection .......................................................................................... 32 4.3 Consultation .............................................................................................................. 32 4.4 Alternatives ............................................................................................................... 33 4.5 Cumulative Impacts .................................................................................................. 33 4.6 Impacts of the Proposed Development on the Crossrail Project ......................... 35 5 Noise ........................................................................................................................ 37 5.1 Introduction ............................................................................................................... 37 5.2 Review of Proposed Development and Potential Issues ...................................... 37 5.3 Scoping and Consultation ....................................................................................... 37 5.4 Methodology ............................................................................................................. 38 5.5 Assumptions and Limitations ................................................................................. 44 5.6 Baseline ..................................................................................................................... 47 5.7 Assessment ............................................................................................................... 50 5.8 Cumulative Impacts .................................................................................................. 54 5.9 Mitigation Measures ................................................................................................. 56 5.10 Residual Impacts ...................................................................................................... 57 5.11 Assessment Summary Matrix .................................................................................. 58 6 Landscape, Townscape and Visual Amenity ........................................................ 59 6.1 Introduction ............................................................................................................... 59 6.2 Review of Proposed Development and Potential Issues ...................................... 60 6.3 Scoping and Consultation ....................................................................................... 60 6.4 Methodology ............................................................................................................. 61 6.5 Assumptions and Limitations ................................................................................. 65 6.6 Landscape/Townscape Baseline ............................................................................. 65 6.7 Visual Baseline ......................................................................................................... 69 6.8 Assessment of the Likely Significant Impacts ....................................................... 73 6.9 Cumulative Impacts .................................................................................................. 77 6.10 Mitigation Measures ................................................................................................. 78 6.11 Residual Impacts ...................................................................................................... 80 6.12 Assessment Summary Matrix .................................................................................. 80 Page 4 of 93 Document uncontrolled once printed. All controlled documents are saved on the CRL Document System © Crossrail Limited Crossrail Plumstead Sidings Environmental Statement C122-OVE-T1-XST-CR148-50004 Submission Ref. GRE/2/9 7 Lighting .................................................................................................................... 82 7.1 Introduction ............................................................................................................... 82 7.2 Review of Proposed Development and Potential Impacts .................................... 82 7.3 Scoping and Consultation ....................................................................................... 84 7.4 Methodology ............................................................................................................. 85 7.5 Assumptions and Limitations ................................................................................. 88 7.6 Baseline ..................................................................................................................... 89 7.7 Assessment ............................................................................................................... 91 7.8 Cumulative Impacts .................................................................................................. 91 7.9 Mitigation Measures ................................................................................................. 92 7.10 Residual Impacts ...................................................................................................... 92 7.11 Assessment Summary Matrix .................................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    93 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us