
Ref: 250204/18 City of Perth Monitored Activities Week Ending 3 October 2018 City of Perth Surveillance Centre – 9461 6611 Department of Mines and Petroleum – Schedule of Approved Fireworks http://www.dmp.wa.gov.au/Schedule-of-fireworks-events-3205.aspx Events Farmers Market Date: Weekly on a Saturday Location: Perth City Farm Time: 8:00 to 12:00 Perth Home‐Grown Markets Date: Weekly on a Sunday Location: Murray Street Mall Time: 11:00 to 16:00 T20 Cricket Date: Every Sunday from 8 April 2018 until 25 November 2018 Location: Wellington Square Time: 10:00 – 16:30 Attendees: 50 Contact: Mr S Khan Ph: 0470 543 750 Mercedes College Athletics Training Date: 18 July – 10 September 2018 (Mon, Wed, Fri) Location: Wellington Square Time: 06:30 – 08:00 Attendees: 30 Contact: Ph:08 9461 3333 Family Court Protest Presence WA Date: 16 August ‐ 31 December 2018 (Weekly on a Thursday) Location: Family Law Court Time: 12:00 to 15:00 Attendees: 12‐15 Contact: Don Huggins Ph:0420 795 247 Health & Activity Approvals (9461 1444) Email: [email protected] ‐ 2 ‐ Kings Square Swings and Sounds Date: 15 September‐ 13 October 2018 Location: Kings Square, Market Grounds. Time: 12:00 ‐20:00 daily, with DJ playing at Market Grounds Swings every Saturday from 5pm‐8pm Contact: Brooke Broadman Ph: 0433 832 147 Attendees: Up to 100 a day including passing foot traffic Yoga in the Park Date: 15 September – 13 October 2018 Location: Piazza Site Time: 07:30 – 09:30 Contact: Ms Hope Resta Ph: 08 9461 1513 Attendees: 15 Picnic Tables Date: 16 September‐ 14 October 2018 Location: Stirling Gardens, Yagan Square, Cathedral Square and PCC Time: Installation Contact: Jacqui Zanetti Ph: 9461 1455 Attendees: Passing foot traffic Flower Giveaway (Spring in the City) Date: Friday 21st September (recurring every Friday until 12th October) Location: Murray St Mall & Hay St Mall Time: 07:00‐12:00 Contact: City of Perth Ph: 08 9461 3333 Attendees: Mall traffic Project Numbat Street Appeal Date: Friday 28th September Location: Commbank Site Time: 7:00 – 17:30 Contact: Karen Cavanough Ph: 0414 476 867 Attendees: Mall traffic Falun Gong Meditation Date: 29th September Location: West End and Commbank Site Time: 9:00 – 18:00 Contact: Angelina Gao Ph: 0404 895 930 Attendees: Mall traffic ‐ 3 ‐ Spring School Holiday Week 2 Date: 29th and 30th September Location: Forrest Place Time: 10:00 – 16:00 Contact: Adam Gregory Ph: 9461 3219 Attendees: 500 Awesome Festival Date: 29th September – 12th October 2018 Location: Perth Theatre Trust (Perth Culture Centre) Time: 10:00 – 14:00 Contact: Awesome Arts Australia Ph: 08 9328 9666 West Coast Eagle – Grand Final Welcome Home Date: Sunday 30th September 2018 Location: Langley Park (Mid & West) Time: 14:00 – 16:00 Contact: City of Perth Ph: 08 9461 3333 Attendees: 5,000 – 50,000 Craft at Cathedral Square Date: 30 September until 7 October 2018 Location: Cathedral Square Time: 10:00 – 15:00 Contact: Ms Jacqui Zanetti –Ph 9461 3333 Attendees: 200 Surge Fitness Free 2d Health Scans Date: Monday 1st October 2018 Location: Commbank Site Time: 9:00 – 18:00 Contact: Lyndsey Stokes Ph: 9408 5659 Attendees: Mall traffic ‐ 4 ‐ Works: Corner of Beaufort Street and James Street Mall Intersection, Perth Date: 26/09/2017 ‐ 20/12/2019 Time: 0700 ‐ 1730 Type of Works: Footpath closure to remove one of the street signs on Beaufort Street and extend the cross‐over. Contact: Multiplex Constructions Pty Ltd Ph: 0457 763 398 East Perth and Crawley Date: 10/10/2017 ‐ 10/10/2018 Time: 0000 ‐ 2400 Type of Works: Footpath closure for streetlight globe replacements. Contact: Sunrun Services Ph: 0428 030 952 Out of hours noise approval has been given. Various location in West Perth Date: 17/01/2018 ‐ 12/12/2018 Time: 0700 ‐ 1430 Type of Works: Verge closure for garden maintenance to roundabouts and median islands. Contact: City of Perth Ph: 0417 955 314 Thomas Street to Winthrop Avenue between Kings Park Road and Stirling Highway Date: 20/02/2018 ‐ 11/12/2018 Time: 1000 ‐ 1400 Type of Works: Verge closure for garden maintenance to median island. Contact: City of Perth Ph: 0417 955 314 Hay Street and Murray Street Malls, Perth Date: 26/02/2018 ‐ 21/12/2018 Time: 0700 ‐ 1000 Type of Works: Garden bed and planter box maintenance, including watering. Contact: City of Perth Ph: 0418 918 668 William Street between James Street and Francis Street, Northbridge Date: 14/03/2018 ‐ 30/11/2018 Time: 0700 ‐ 1900 Type of Works: Footpath and verge closure for partial demolition of brickwork, concrete basement slab and some basement excavation. Contact: Built Pty Ltd Ph: 0451 054 441 Lot 10 Barrack Square, Elizabeth Quay Date: 15/03/2018 ‐ 01/03/2019 Time: 0000 ‐ 2400 Type of Works: Footpath Closure as part of the workzone permit in Barrack Square. Contact: ProBuild Ph: 0479 095 137 ‐ 5 ‐ Como The Treasury Hotel - Barrack Street, St Georges Terrace and Cathedral Avenue, Perth Date: 31/03/2018 ‐ 30/09/2018 Time: 0500 ‐ 1700 Type of Works: Footpath closure for window cleaning using water fed poles. Contact: Team Window Clean Ph: 0421 330 111 Out of hours noise approval has been given. All parklands within the City boundary Date: 06/04/2018 ‐ 05/04/2019 Time: 0730 ‐ 1900 Type of Works: Use of drone to inspect tree canopies. Contact: City of Perth Ph: 08 9461 3234 2 Park Road, Crawley Date: 09/04/2018 ‐ 16/04/2019 Time: 0700 ‐ 1900 Type of Works: Verge closure to remove kerbing. Contact: EMCO Building Ph: 0450 481 895 City of Perth Library - Greenwall Date: 11/04/2018 ‐ 12/12/2018 Time: 0700 ‐ 0900 Type of Works: Footpath closure to allow use of an EWP within the property boundary to access and maintain the library greenwall. Contact: City of Perth Ph: 08 9461 3333 Riverside Drive - Barrack Street to Plain Street, Perth Date: 26/04/2018 ‐ 15/11/2018 Time: 0930 ‐ 1500 Type of Works: Road lane closure for garden maintenance. Contact: City of Perth Ph: 0418 918 668 Wellington Street, Corner of Barrack Street, Intersection Milligan Street and Corner of Gordon Street, Perth Date: 11/06/2018 ‐ 01/10/2018 Time: 0700 ‐ 1600 Type of Works: Footpath and road lane closure for billboard works. Contact: Advanced Traffic Management Ph: 08 9274 6300 State Theatre Centre of WA - Roe Street East of William Street, Perth Date: 01/07/2018 ‐ 31/12/2018 Time: 0700 ‐ 1900 Type of Works: Footpath closure to allow vehicle access to State Theatre Centre loading docks. Contact: State Theatre Centre of WA Ph: 0429 365 838 ‐ 6 ‐ Westralia Square - 141 St Georges Terrace, Perth Date: 09/07/2018 ‐ 07/10/2018 Time: 0700 ‐ 1700 Type of Works: Footpath closure for replacing the escalators in Westralia Square. Contact: Howell Builders Ph: 0409 335 144 Kings Park Road, Perth Date: 12/07/2018 ‐ 27/12/2018 Time: 0730 ‐ 1430 Type of Works: Verge closure for garden maintenance to median island. Contact: City of Perth Ph: 0417 955 314 175 Adelaide Terrace and Spring Street, Perth Date: 16/08/2018 ‐ 27/09/2018 Time: 0700 ‐ 1700 Type of Works: Opening existing pits at various locations. Contact: Pathfinder Technology Group Ph: 0408 914 608 Victoria Gardens, East Perth Date: 22/08/2018 ‐ 17/10/2018 Time: 0700 ‐ 1700 Type of Works: Footpath closure for removal and replacement of lights. Contact: Stiles Electrical Services Ph: 08 9300 0696 35 Megalong Street, Nedlands Date: 24/08/2018 ‐ 05/02/2019 Time: 0800 ‐ 1200 Type of Works: Verge closure required for storage of building materials. Contact: Aveling Homes Pty Ltd Ph: 0861 441 000 525 Wellington Street, Perth Date: 25/08/2018 ‐ 30/09/2018 Time: 0400 ‐ 0630 Type of Works: Road lane closure for load out of demolition rubble. Contact: Built Pty Ltd Ph: 0432 605 245 Out of hours noise approval has been given. Forest Place - Forrest Chase Redevelopment Date: 25/08/2018 ‐ 30/11/2018 Time: 0000 ‐ 2400 Type of Works: Footpath closure for demolition works along Forrest Place and install new structure and facade. Contact: Lendlease Ph: 0408 578 435 ‐ 7 ‐ His Majesty's Theatre, King Street, Perth Date: 27/08/2018 ‐ 26/09/2018 Time: 0800 ‐ 1800 Type of Works: Footpath and verge closure for loading and unloading trucks. Contact: His Majesty's Theatre Ph: 0412 115 175 Various locations on Aberdeen Street, Wickham Street and Murray Street Mall, Perth Date: 27/08/2018 ‐ 27/09/2018 Time: 0700 ‐ 1700 Type of Works: Footpath and verge closure for replacement of old leaking existing gas services throughout the CBD. Contact: Civcon Civil and Project Management Ph: 0403 162 939 119 Fairway, Crawley Date: 27/08/2018 ‐ 27/09/2018 Time: 0700 ‐ 2100 Type of Works: Verge closure for storing of materials. Contact: Ventura ID Ph: 08 9241 1601 105 Lord Street, Perth Date: 29/08/2018 ‐ 29/09/2018 Time: 0700 ‐ 1900 Type of Works: Footpath closure for placement of traffic signage. Contact: Multiplex Constructions Pty Ltd Ph: 0457 763 398 Tully Road, East Perth Date: 31/08/2018 ‐ 02/10/2018 Time: 0700 ‐ 1700 Type of Works: Road lane closure for concrete pours and deliveries. Contact: Jaxon Construction Ph: 0428 715 685 Plain Street, East Perth Date: 01/09/2018 ‐ 30/09/2018 Time: 0700 ‐ 1900 Type of Works: Concrete pumping and pre cast panel lifting. Contact: Pindan Constructions Pty Ltd Ph: 0400 998 525 35-37 Bronte Street, East Perth Date: 01/09/2018 ‐ 30/09/2018 Time: 1700 ‐ 1700 Type of Works: Footpath closure for construction works. Contact: Jaxon Construction Pty Ltd Ph: 0417 917 202 ‐ 8 ‐ Telethon Avenue, Perth Date: 01/09/2018 ‐ 30/09/2018 Time: 0700 ‐ 1300 Type of Works: Foothpath, verge and road lane closure for urgent works repairs on façade of HBF building.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages20 Page
-
File Size-