North Adelaide Local Area Traffic & Parking Management Plan

North Adelaide Local Area Traffic & Parking Management Plan

North Adelaide Local Area Traffic & Parking Management Plan for the November 2017 InfraPlan (Aust) Pty Ltd. 2017 The information contained in this document produced by InfraPlan (Aust) Pty Ltd is solely for the use of the Client for the purposes for which it has been prepared and InfraPlan (Aust) Pty Ltd undertakes no duty or accepts any responsibility to any third party who may rely on this document. All rights reserved. No sections or elements of this document may be removed from this document, reproduced, electronically stored or transmitted in any form without the written permission of InfraPlan (Aust) Pty Ltd . Project title North Adelaide Local Area Traffic & Parking Management Plan Client Client contact John Hanchett Senior Consultant Traffic Management Design + Strategy City of Adelaide [email protected] Consultant Infraplan (Aust) Pty Ltd Level 3, 66 Wyatt Street | Adelaide SA 5000 | p: +8227 0372 Last saved 7/11/2017 2:08:12 PM Version Control IP17.020_North Adelaide LATPM Plan_Report_R5 Version Notes Author Date Reviewer (suffix) R1 Preliminary Draft for Council Review BR R2 Preliminary Draft for Council Review GG 9/2017 Council R3 Second Draft for Council Review BR 10/2017 Council R4 Supplementary Draft for Council Review BR 31/10/2017 Council R5 Final Issue BR 7/11/2017 PAGE i | Table of Contents Table of Contents .................................................................................................................................... ii 1. EXECUTIVE SUMMARY .................................................................................................................. 4 2. CONTEXT & PREVIOUS CONSULTATION ....................................................................................... 6 3. POLICY, STRATEGY & INVESTIGATIONS ........................................................................................ 9 3.1. Strategic Context: Local Government ................................................................. 9 3.1.1. City of Adelaide 2016-2020 Strategic Plan .......................................................... 9 3.1.2. Adelaide Design Manual: Street Typology .......................................................... 9 3.1.3. Smart Move Transport and Movement Strategy .............................................. 11 3.1.4. Smart Move 2016-2018 Interim Action Plan ..................................................... 12 3.1.5. Adelaide (City) Development Plan: Land Use and Parking Requirements ........ 13 3.2. Strategic Context: State Government ............................................................... 14 3.2.1. The 30 Year Plan for Greater Adelaide .............................................................. 14 3.2.2. Integrated Transport and Land Use Plan, including AdeLINK ........................... 14 3.2.3. AdeLINK Tram Planning ................................................................................. 15 4. TRAFFIC MANAGEMENT INVESTIGATIONS ................................................................................. 16 4.1. Traffic Volumes ................................................................................... 16 4.2. Traffic Speeds & Type ................................................................................... 17 4.3. Bicycle Network ................................................................................... 19 4.4. Buses and Public Transport ............................................................................... 19 4.5. Travel time - Bluetooth Analysis ....................................................................... 20 4.6. ‘Through Traffic’ - Bluetooth Analysis ............................................................... 21 4.7. Crash Data Analysis ................................................................................... 22 5. RECOMMENDATIONS: TRAFFIC ANALYSIS .................................................................................. 26 5.1. Compartmentalise the local areas for detailed LATPM assessment and delivery ................................................................................... 26 5.2. Speed review of ‘gateway routes’, with the view of creating uniformed speed restrictions across Park Lands. .......................................................................... 26 5.3. O’Connell Street Masterplan ............................................................................. 28 5.4. Addressing crashes ................................................................................... 28 5.5. Addressing high speeds: ................................................................................... 29 5.6. Strangways Terrace speed cushions: ................................................................ 29 5.7. Landscaping or beautification of traffic control devices ................................... 29 North Adelaide LATPM Plan | PAGE ii 5.8. Intersection of O’Connell Street/Barton Terrace West/Prospect Road/Main North Road ................................................................................... 30 5.9. Minor Intersection Improvements .................................................................... 30 5.10. Cycling ................................................................................... 30 6. PARKING & PRECINCT ANALYSIS ................................................................................................. 31 6.1. Parking controls and current approach ............................................................ 31 6.2. Defining ‘Parking Precincts’ .............................................................................. 31 6.3. Existing Demographics & Business Data ........................................................... 33 6.4. Supply of on-street parking ............................................................................... 37 6.5. Parking demand and supply scenarios regarding permits ................................ 37 6.6. Business demand for parking ............................................................................ 38 6.7. Supply and Demand by Area ............................................................................. 39 6.8. Analysis & Proposed Action ............................................................................... 39 6.9. Residential Parking Permit Provision ................................................................ 43 7. RECOMMENDED APPROACH TO PARKING ................................................................................. 45 7.1. Approach 1: All residential properties in North Adelaide be provided with on- street parking permits ................................................................................... 45 7.2. Approach 2: Incremental changes (relaxation) to residential parking permit eligibility criteria or Conditions of Use for North Adelaide. .............................. 45 7.3. Additional Requirement: Rebalance parking controls to suit precinct land uses. ................................................................................... 46 7.4. Additional Approaches for consideration: ........................................................ 46 8. PRIORITY OF RECOMMENDATIONS ............................................................................................ 48 9. APPENDICIES ............................................................................................................................... 49 Appendix 1: Development Plan and parking rates .......................................................... 49 Main Street (O’Connell) Zone ................................................................................... 50 Main Street (Melbourne East) Zone ................................................................................ 51 Mixed Use (Melbourne West) Zone ................................................................................. 52 Parking rates ................................................................................... 53 Appendix 2: Crash history ................................................................................... 56 Appendix 3: Street Typology outcomes ........................................................................... 64 PAGE iii | 1. EXECUTIVE SUMMARY This report has been prepared for the City of Adelaide by InfraPlan in response to the ‘North Adelaide Local Area Traffic & Parking Management Plan’ (LATPM) brief. The report outlines the assessments/investigations and recommendations for traffic management (see Chapters 4 and 5) and investigations and recommendations for parking (see Chapters 6 and 7). 1.1. Key traffic management recommendations for North Adelaide 1.1.1. Defining ‘Precincts’ for detailed LATPM assessment and delivery In future, the North Adelaide area could be divided into sub-precincts to deliver a more detailed local area traffic management process and provides the potential to: • undertake detailed local investigations • define local character more accurately • define transport influences/requirements and • assess the transport demand/implications of individual land uses (such as schools, hospitals, off-street car parks etc) • deliver more meaningful and targeted consultation • budget for and deliver action plans for identified ‘precincts’. 1.1.2. Undertake a review of ‘gateway routes’, with the view of creating uniformed speed restrictions across Park Lands Inconsistent speeds across Park Land ‘gateway’ routes warrants a more detailed investigation to implement consistent speed limits, taking into consideration: • Road safety of

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    66 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us