NEW RAILWAYS NEW ODISHA a Progressive Journey Since 2014 Mayurbhanj Parliamentary Constituency

NEW RAILWAYS NEW ODISHA a Progressive Journey Since 2014 Mayurbhanj Parliamentary Constituency

Shri Narendra Modi Hon'ble Prime Minister NEW RAILWAYS NEW ODISHA A progressive journey since 2014 Mayurbhanj Parliamentary Constituency MAYURBHANJ RAILWAYS’ DEVELOPMENT IN ODISHA (2014-PRESENT) MAYURBHANJ PARLIAMENTARY CONSTITUENCY A. ASSEMBLY SEGMENTS : Jashipur, Saraskana, Rairangpur, Bangriposi, Udala, Baripada, Morada RAILWAY STATIONS COVERED : Basta, Betnoti, Baripada, N Mayurbhanj Road, Jugpura, Krishna Ch Pura, Thakurtota, Jogal, Badampahar, Kuldiha, Bahalda Road, Aunlajori Junction, Rairanghpur, Gorumahisani, Bangriposi B. WORKS COMPLETED IN LAST FOUR YEARS : B.1. New Lines & Electrication : 90 Kms gauge conversion from Rupsa to Bangriposi at a cost of `183.980 Crore B.2. Improvement of Passenger Amenities Like : Provision of Hand Pump, Benches, Urinals, Latrines, Tube Light with Fittings, LED Fittings, Ceiling Fan, Time Table Display Board at Aunlajori, Chhanua, Birmitrapur, Krishnachandrapur, Jamsole, Baripada, Kuchai, Buramara, Rajaluka, Bangriposi, Bhanjapur Stations at a cost of ` 0.204 Crore. Provision of V.I.P. room and other allied works at Baripada Station at a cost of ` 0.290 Crore. Provision of precast CC grill boundary wall at Betnoti at a cost of ` 0.085 Crore. B.3. Trafc Facilities : Limited Height Subway at LC No. TB66 at a cost of ` 0.950 Crore. B.4. Additional Facilities : Chhanua-Badampahar- Manning of unmanned LC no. TB - 68 73 at Km 33014 - 3311 33509 - 10 at a cost of ` 0.860 Crore. Rairangpur - Development of station as Adarsh Station at a cost of ` 1.060 Crore. Provision of 04 nos hand pump at a cost of ` 0.030 Crore. C. ON-GOING WORKS : C.1. Improvement of Passenger Amenities : Provision of interlocking precast CC blocks at Baripada at a cost of ` 0.080 Crore. Provision of Canopies at Bangriposi at a cost of ` 0.084 Crore. LED tube light provided at Bangriposi Station at a cost of ` 0.005 Crore. Baripada - Extension of Platform to accommodate full rake ` 0.392 Crore. C.2. Trafc Facilities related works like : Full rake loading, Limited Height Subway, Road Under Bridge, Subways at Badampahar, Bahalda Road, Bahalda Road - Badampahar at a cost of `15.8 Crore. C.3. Additional Facilities works like : Diversion of Road, Manning of Unmanned LC, Diversion of Road for Level Crossing, Provision of Emergency siding boom at Interlocked Level Crossing Gates, Interlocking of Level Crossing Gate, Provision of Dual Detection of last vehicle checking device, LED Street Lights at Aunlajori, Gorumahisani, Rairangpur, Kuldiha, Chhanua, Tatanagar-Badampahar, Rourkela-Badampahar, Betnoti and Bhanjapur, Baripada and Bangriposi Stations at a cost of ` 8.106 Crore. 3 Nos. bus stand type shelter Platform Extension work in Rupsa Juction at Baripada work in progress Progress at Baripada.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us