Crisis Planning & Management

Crisis Planning & Management

CRISIS PLANNING AND MANAGEMENT SEPTA SILVERLINER V ISSUE JEFFREY D. KNUEPPEL, PE GENERAL MANAGER CRISIS PLANNING & MANAGEMENT REGIONAL SERVICE PROFILE • 13 Regional Rail lines with over 150 stations • Regional Rail Ridership over 37M annually and has increased 52% since 1998 • 770 trains per day on weekdays (570 per day on weekends) • Total track miles: 474 – 234 SEPTA track miles – 240 Amtrak track miles CRISIS PLANNING & MANAGEMENT OVERVIEW - CHRONOLOGY • June 29th: Inspector notices a problem with a Silverliner V car and removes it from service for further evaluation • June 30th: Silverliner V defect identified at Overbrook Shop • Upon inspection, Vehicle Maintenance personnel found more cracks in several cars which indicated a fleetwide equalizer beam problem • July 1st: Entire 120 car Silverliner V fleet grounded CRISIS PLANNING & MANAGEMENT CONTEXT OF DISCOVERY • Silverliner V’s constitute 30% of Regional Rail fleet • Silverliner V cars are new! • 58% of fleet is 40+ years old! • DNC coming to Philly in 3 weeks • City labor contract expires on 10/31/16!! CRISIS PLANNING & MANAGEMENT EQUALIZER BEAM Equalizer Beam Equalizer ‘Foot’ – welded onto beam Equalizer Seat Equalizer Pad (1/2 inch resilient pad) CRISIS PLANNING & MANAGEMENT WORKING TOGETHER • SEPTA immediately retained LTK Engineers at the start of the Silverliner V issue • Hyundai Rotem, SEPTA, and LTK worked cooperatively on computer modeling, metallurgical evaluation, vehicle instrumentation and developed temporary and then permanent repair schemes CRISIS PLANNING & MANAGEMENT EMERGENCY SCHEDULE CHANGES Weekday Interim Schedule Interim Schedule Interim Schedule Schedule 7/5/2016 7/11/2016 7/18/2016 Number of Trains 788 549 574 577 * Daily Car 297 205 223 233 Requirement (IVs and Vs) (IVs) (IVs and 18 Leased) (IVs and 28 Leased) Silverliner V Fleet: 120 Cars Silverliner IV Fleet: 231 Cars • An Interim Schedule was developed and modified over time • Leased vehicles, additional service added, express service changes and adjustments to meet demand • Shuttle busing on the Cynwyd Line • Normal schedule resumed on October 3, 2016 (one week early!) CRISIS PLANNING & MANAGEMENT “ALPHABET FLEET” LEASED EQUIPMENT • SEPTA leased equipment from Amtrak, MARC and NJT to increase fleet size during the outage • MARC – 30 coach cars @ height • Amtrak – 5 ACS Engines – 5 coach cars • New Jersey Transit – 1 ALP-46 Engine – 8 coach cars CRISIS PLANNING & MANAGEMENT EXPANDED SERVICE ON OTHER MODES • Expanded service on other modes: • All rail transit rush hour time periods were extended • Additional cars added to the Norristown High Speed and Media Sharon Hill Lines • Increased parking options • 2.5% increase in Market Frankford Line and Broad Street Subway ridership from previous week • Supplemental bussing after Labor Day • Suspension of planned construction outages including Trolley Tunnel Blitz CRISIS PLANNING & MANAGEMENT MEDIA COVERAGE • Press transparency and communication with the public and stakeholders was a priority for SEPTA • FRA, FTA, Elected Officials • Regular SEPTA Board updates occurred • Updates provided through regular press conferences • Overbrook Maintenance Facility Inspection Tour – July 14, 2016 • Press tour of PennFab plant in Bensalem – September 1, 2016 CRISIS PLANNING & MANAGEMENT REGIONAL RAIL SERVICE IMPROVEMENT PROGRAM • Development of Regional Rail Service Improvement Program microsite - On Time Performance - Communications - Planning & Schedules - Fleet Upgrades - Safety - Hiring & Training - Rail Trans Realignment - Business Partners - Infrastructure CRISIS PLANNING & MANAGEMENT KEY TAKEAWAYS • Safety must be the foundation for all that you do • Workforce communication, morale and recognition are important • Move quickly and decisively when a crisis arises • Keep EVERYONE informed • Provide the most accurate timelines you can • Keep your word! • Utilize all available resources (consultants, other properties, etc.) • Post-crisis recovery plan important CRISIS PLANNING AND MANAGEMENT SEPTA SILVERLINER V ISSUE JEFFREY D. KNUEPPEL, PE GENERAL MANAGER.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    13 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us