FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office Region VIII 1,077 projects 28,555,545,000 Biliran District Engineering Office 76 projects 1,544,350,000 BILIRAN 76 projects 1,544,350,000 OO1: Ensure Safe and Reliable National Road System 13 projects 702,750,000 Asset Preservation - Preventive Maintenance - Secondary Roads 124,200,000 1. P00401404VS 310102100396000 90,748,000 Biliran Circumferential Rd - K1083 +170 - K1084 + 392, K1084 + 914 - K1086 + 1000 P00401404VS-CW1 Preventive Maintenance of Road: Preventive Lane Km 6.656 87,571,820 Central Office / Asphalt Overlay - at Specific Maintenance of Region VIII Locations along Biliran Road: Asphalt Circumferential Rd (S00002BR) Overlay K1083 +170 - K1086 + 1000 P00401404VS-EAO 3,176,180 Central Office / Region VIII 2. P00401405VS 310102100547000 33,452,000 Biliran Circumferential Rd - K1082 + 000 - K1083 + 170 P00401405VS-CW1 Preventive Maintenance of Road: Preventive Lane Km 2.377 32,782,960 Biliran District Asphalt Overlay - at Specific Maintenance of Engineering Office Locations along Biliran Road: Asphalt / Biliran District Circumferential Rd (S00002BR) Overlay Engineering Office K1082 + 000 - K1083 + 170 P00401405VS-EAO 669,040 Biliran District Engineering Office / Biliran District Engineering Office Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved 4,420,000 Roads - Secondary Roads 3. P00400977VS 310105100455000 4,420,000 Biliran Circumferential Rd - K1102 + 000 - K1102 + 205 P00400977VS-CW1 Reconstruction to Concrete Reconstruction to Lane Km 0.410 4,331,600 Biliran District Pavement - along Biliran Concrete Engineering Office Circumferential Rd (S00002BR) Pavement / Biliran District K1102 + 000 - K1102 + 205 Engineering Office P00400977VS-EAO 88,400 Biliran District Engineering Office / Biliran District Engineering Office Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved 50,000,000 Roads - Tertiary Roads 4. P00401515VS 310106100515000 50,000,000 Maripipi Circumferential Rd - K0004 + 585 - K0006 + 600 MYPS: 03/03/2020 02:53:27 pm Page 1 of 322 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office P00401515VS-CW1 Reconstruction to Concrete Reconstruction to Lane Km 4.030 49,000,000 Biliran District Pavement - at Specific Locations Concrete Engineering Office along Maripipi Circumferential Rd Pavement / Biliran District (S00017BR) K0004 + 585 - K0006 + Engineering Office 600 P00401515VS-EAO 1,000,000 Biliran District Engineering Office / Biliran District Engineering Office Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope 177,630,000 Collapse, and Landslide - Secondary Roads 5. P00400909VS 310108100430000 50,000,000 Biliran Circumferential Rd - K1104 + 944 - K1105 + 335 P00400909VS-CW1 Construction of Road Slope Construction of Square 2,910.600 49,000,000 Biliran District Protection Structure - along Biliran Road Slope meters Engineering Office Circumferential Rd (S00010BR) Protection / Biliran District K1104 + 944 - K1105 + 335 Structure Engineering Office P00400909VS-EAO 1,000,000 Biliran District Engineering Office / Biliran District Engineering Office 6. P00401066VS 310108100427000 45,000,000 Biliran Circumferential Rd - K1046 + 300 - K1046 + 1057 P00401066VS-CW1 Construction of Road Slope Construction of Square 2,216.000 44,100,000 Biliran District Protection Structure - along Biliran Road Slope meters Engineering Office Circumferential Rd (S00002BR) Protection / Biliran District K1046 + 300 - K1046 + 1057 Structure Engineering Office P00401066VS-EAO 900,000 Biliran District Engineering Office / Biliran District Engineering Office 7. P00401067VS 310108100428000 45,000,000 Biliran Circumferential Rd - K1060 + 508 - K1061 + 093 P00401067VS-CW1 Construction of Road Slope Construction of Square 2,556.000 44,100,000 Biliran District Protection Structure - along Biliran Road Slope meters Engineering Office Circumferential Rd (S00002BR) Protection / Biliran District K1060 + 508 - K1061 + 093 Structure Engineering Office P00401067VS-EAO 900,000 Biliran District Engineering Office / Biliran District Engineering Office 8. P00401068VS 310108100429000 37,630,000 Biliran Circumferential Rd - K1075 + 235 - K1075 + 341, K1075 + 610 - K1075 + 807, K1076 + 020 - K1076 + 345 MYPS: 03/03/2020 02:53:27 pm Page 2 of 322 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office P00401068VS-CW1 Construction of Road Slope Construction of Square 2,002.870 36,877,400 Biliran District Protection Structure - at Specific Road Slope meters Engineering Office Locations along Biliran Protection / Biliran District Circumferential Rd (S00002BR) Structure Engineering Office K1075 + 235 - K1076 + 345 P00401068VS-EAO 752,600 Biliran District Engineering Office / Biliran District Engineering Office Network Development - Road Widening - Secondary Roads 160,000,000 9. P00401174VS 310202100644000 42,920,000 Biliran Circumferential Rd - K1016 + 027 - K1018 + 140 P00401174VS-CW1 Road Widening - along Biliran Road Widening Lane Km 3.291 42,061,600 Biliran District Circumferential Rd (S00002BR) Engineering Office K1016 + 027 - K1018 + 140 / Biliran District Engineering Office P00401174VS-EAO 858,400 Biliran District Engineering Office / Biliran District Engineering Office 10. P00401175VS 310202100645000 37,080,000 Biliran Circumferential Rd - K1078 + 751 - K1078 + 851, K1078 + 900 - K1080 + 054 P00401175VS-CW1 Road Widening - at Specific Road Widening Lane Km 2.540 36,338,400 Biliran District Locations along Biliran Engineering Office Circumferential Rd (S00002BR) / Biliran District K1078 + 751 - K1080 + 054 Engineering Office P00401175VS-EAO 741,600 Biliran District Engineering Office / Biliran District Engineering Office 11. P00401176VS 310202100510000 80,000,000 Naval-Caibiran Cross Country Rd - K1041 + 798 - K1044 + 484 P00401176VS-CW1 Road Widening - along Road Widening Lane Km 5.224 77,200,000 Central Office / Naval-Caibiran Cross Country Rd Region VIII (S00012BR) K1041 + 798 - K1044 + 484 P00401176VS-EAO 2,800,000 Central Office / Region VIII Bridge - Replacement of Permanent Weak Bridges 186,500,000 12. P00300197VS 310302100114000 MYOA 100,000,000 Caray-Caray Br. (B00032BR) along Biliran Circumferential Rd MYPS: 03/03/2020 02:53:27 pm Page 3 of 322 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office P00300197VS-CW1 Replacement of Bridge - Replacement of Square 1,706.000 96,500,000 Central Office / Caray-Caray Br. (B00032BR) along Bridge meters Region VIII Biliran Circumferential Rd P00300197VS-EAO 3,500,000 Central Office / Region VIII 13. P00300198VS 310302100151000 MYOA 86,500,000 Catmon Br. (B00031BR) along Biliran Circumferential Rd P00300198VS-CW1 Replacement of Bridge - Catmon Replacement of Square 682.400 83,472,500 Central Office / Br. (B00031BR) along Biliran Bridge meters Region VIII Circumferential Rd P00300198VS-EAO 3,027,500 Central Office / Region VIII OO2: Protect Lives and Properties Against Major Floods 8 projects 160,000,000 Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems 160,000,000 14. P00420498VS 320101105203000 20,000,000 Construction of Amambahag Flood Control along Biliran Circumferential Road, Culaba, Biliran P00420498VS-CW1 Construction of Flood Mitigation Construction of Lineal 236.000 19,600,000 Biliran District Structure - Construction of Flood Mitigation meters Engineering Office Amambahag Flood Control along Structure / Biliran District Biliran Circumferential Road, Engineering Office Culaba, Biliran P00420498VS-EAO 400,000 Biliran District Engineering Office / Biliran District Engineering Office 15. P00420499VS 320101103793000 20,000,000 Construction of Bagongbong Flood Control along Biliran Circumferential Road, Almeria, Biliran P00420499VS-CW1 Construction of Flood Mitigation Construction of Lineal 270.000 19,600,000 Biliran District Structure - Construction of Flood Mitigation meters Engineering Office Bagongbong Flood Control along Structure / Biliran District Biliran Circumferential Road, Engineering Office Almeria, Biliran P00420499VS-EAO 400,000 Biliran District Engineering Office / Biliran District Engineering Office 16. P00420500VS 320101105204000 10,000,000 Construction of Cabadiangan Flood Control along Naval-Caibiran Cross Country Road, Naval, Biliran MYPS: 03/03/2020 02:53:27 pm Page 4 of 322 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office P00420500VS-CW1 Construction of Flood Mitigation Construction of Lineal 140.000 9,800,000 Biliran District Structure - Construction of Flood Mitigation meters Engineering Office Cabadiangan Flood Control along Structure / Biliran District Naval-Caibiran

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    322 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us