Transport Study

Transport Study

WYG Transport Planning Bassetlaw District Council District-Wide Transport Study Final Report Publication Draft Growth Scenario WYG Executive Park Report No. RT-A060969 Rev 7 Avalon Way Anstey Leicester 15 th November 2010 LE7 7GR WYG Environment Planning Transport part of the WYG Group creative minds safe hands www.wyg.com WYG Transport Planning REPORT CONTROL Document: Report Project: District-Wide Transport Study Client: Bassetlaw District Council Job Number: A060969 File Origin: N:\Projects\A060969\reports\Transport Study\Transport Study - November 2010 - S3 (Final)\Text\Bassetlaw District Transport Study - Nov 2010 - S3 (Final).doc Document Checking: Primary Author: Alistair Gregory Initialled: Contributors: Edward Ducker, Initialled: Andrew Norman, Robert Holland. Review By: Colin Shields Initialled: Issue Date Status Checked for Issue 1 18/12/2009 Draft 2 24/03/2010 Draft 2 23/04/2010 Final 3 28/07/2010 Revised Final 4 29/07/2010 Revised Growth Scenario 5 22/10/2010 Revised Final 6 02/11/2010 Revised Final 7 15/11/2020 Revised Final WYG Environment Planning Transport part of the WYG Group creative minds safe hands www.wyg.com WYG Transport Planning Contents 1 Objectives and Scope of the Study ............................................................................ 3 1.1 Context to the study and objectives ............................................................................3 1.2 Structure of the Report...............................................................................................6 2 Baseline Assessment.................................................................................................. 8 2.1 Introduction...............................................................................................................8 2.2 Study Area...............................................................................................................16 2.3 Highways.................................................................................................................19 2.4 Bus Transport ..........................................................................................................28 2.5 Passenger Rail .........................................................................................................36 2.6 Cycling and Walking .................................................................................................44 2.7 Freight ....................................................................................................................50 3 Committed Infrastructure Schemes and Land-Use Developments ......................... 52 3.1 Introduction.............................................................................................................52 3.2 Highways.................................................................................................................53 3.3 Bus Transport ..........................................................................................................56 3.4 Passenger Rail .........................................................................................................60 3.5 Cycling and Walking .................................................................................................64 3.6 Freight ....................................................................................................................68 3.7 Developments..........................................................................................................69 4 Growth Scenario ...................................................................................................... 72 4.1 Introduction.............................................................................................................72 4.2 Housing Growth .......................................................................................................72 4.3 Employment Growth.................................................................................................73 4.4 Growth Site Locations...............................................................................................73 4.5 Distribution of Growth ..............................................................................................75 4.6 Growth Distribution Scenario Tested..........................................................................75 5 Forecast Years and Background Traffic Growth ...................................................... 76 6 Trip Generation, Distribution & Assignment............................................................ 77 6.1 Trip Generation........................................................................................................77 6.2 Trip Distribution & Assignment..................................................................................78 7 Impacts of Growth ................................................................................................... 81 7.1 Multi-Modal Impacts.................................................................................................81 7.2 Highway Link Impacts ..............................................................................................84 7.3 Highway Junction Impacts ........................................................................................84 8 Demand Management .............................................................................................. 86 8.1 Introduction.............................................................................................................86 8.2 Modal Shift ..............................................................................................................86 8.3 Smarter Choices.......................................................................................................86 8.4 Travel Planning ........................................................................................................87 9 Transport Infrastructure Requirements .................................................................. 91 9.1 Introduction.............................................................................................................91 WYG Environment Planning Transport part of the WYG Group creative minds safe hands www.wyg.com WYG Transport Planning 9.2 Bus Transport ..........................................................................................................91 9.3 Passenger Rail .........................................................................................................97 9.4 Cycling and Walking .................................................................................................97 9.5 Highways Infrastructure ......................................................................................... 100 9.6 Funding ................................................................................................................. 123 9.7 improvement Priorities............................................................................................ 124 10 Summary ................................................................................................................ 126 10.1 Preamble ........................................................................................................... 126 10.2 Existing Conditions ............................................................................................. 126 10.3 Committed Infrastructure/land-Use Developments ............................................... 128 10.4 Proposed Growth ............................................................................................... 128 10.5 Transport Impacts.............................................................................................. 128 10.6 Strategic Infrastructure Requirements .................................................................129 Tables Table 1 – Transport Indicators ..............................................................................................................10 Table 2 – Destinations of Employment Trips Originating in Bassetlaw......................................................11 Table 3 – Origins of Employment Trips with Destinations in Bassetlaw.....................................................11 Table 4 – Car and Van Ownership .........................................................................................................12 Table 5 – Personal Injury Accident Summary .........................................................................................13 Table 6 – Accident Problem Sites ..........................................................................................................13 Table 7 – Accident Remedial Treatment Sites in Bassetlaw .....................................................................15 Table 8 – Summary of Conditions for Existing ‘A’ Road Network..............................................................20 Table 9 – Council Maintained Car Parks – Tariff Structures......................................................................26 Table 10 – Council Maintained Car Parks – Tariff Locations .....................................................................26 Table 11 – Accessibility to Existing Bus Services.....................................................................................29 Table 12 – Bus Services in the Retford Area...........................................................................................30 Table 13 – Bus Services in the Worksop Area.........................................................................................31

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    148 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us