GHG Final Biological Assessment for Occidental

GHG Final Biological Assessment for Occidental

Occidental Chemical Corporation (OxyChem) Ethane Cracker, Markham Ethylene Pipeline, and San Patricio Pipeline Project Biological Assessment Prepared for: Occidental Chemical Corporation 5 Greenway Plaza, Suite 110 Houston, TX, 77046 (713) 215-7000 Prepared by: Tetra Tech 285 Ellicott Street Buffalo, NY, 14203 (716) 849-9419 Tetra Tech Project No. 112C04710 DRAFT February 2014 TABLE OF CONTENTS LIST OF TABLES ...................................................................................................................... vi LIST OF FIGURES .................................................................................................................... vi LIST OF APPENDICES ............................................................................................................ vii LIST OF ACRONYMS AND ABBREVIATIONS ....................................................................... viii EXECUTIVE SUMMARY ............................................................................................................. i 1.0 INTRODUCTION ......................................................................................................... 1 1.1 Project Purpose and Need ............................................................................... 3 1.2 Purpose and Objective of Biological Assessment............................................. 3 1.3 Permits and Regulatory Requirements ............................................................. 3 1.3.1 Clean Air Act .......................................................................................................... 4 1.3.2 Endangered Species Act ....................................................................................... 6 1.3.3 Migratory Bird Act................................................................................................... 7 1.3.4 Bald and Golden Eagle Protection Act .................................................................. 7 2.0 PROJECT DESCRIPTION .......................................................................................... 8 2.1 Existing Shoreline Structures ........................................................................... 8 2.2 Project Facilities ............................................................................................... 8 2.2.1 Ethane Cracker Facility .......................................................................................... 8 2.2.1.1 Thermal Oxidizers ................................................................................ 10 2.2.1.2 Emergency Ground Flare .................................................................... 11 2.2.1.3 Material Storage .................................................................................. 11 2.2.1.4 Staging Areas ...................................................................................... 11 2.2.1.5 Wastewater Management .................................................................... 12 2.2.1.6 Stormwater Management .................................................................... 12 2.2.2 Pipelines ............................................................................................................... 12 2.2.2.1 Pipelines .............................................................................................. 12 2.2.2.2 Measurement and Regulation Stations ............................................... 12 2.2.2.3 Additional Temporary Work Space and Storage Areas ....................... 12 2.2.2.4 Access Roads ...................................................................................... 13 2.3 Construction ....................................................................................................13 2.3.1 Construction Schedule ......................................................................................... 13 2.3.2 Ethane Cracker Facility ........................................................................................ 13 2.3.2.1 Construction Elements ......................................................................... 13 2.3.2.2 Ethane Cracker Facility Construction Sequencing .............................. 14 2.3.2.3 Ethane Cracker Facility Best Available Control Technology ............... 14 2.3.3 Pipeline Construction ........................................................................................... 17 2.3.3.1 Construction and Sequencing of Soil Disturbing Activities .................. 17 2.3.3.2 Surveying and Staking ......................................................................... 18 2.3.3.3 Clearing and Grading ........................................................................... 18 2.3.3.4 Temporary Environmental Controls ..................................................... 19 2.3.3.5 Topsoiling ............................................................................................ 19 2.3.3.6 Trenching ............................................................................................. 19 i 2.3.3.7 Pipe Stringing and Bending ................................................................. 19 2.3.3.8 Pipe Assembly and Field Welding ....................................................... 20 2.3.3.9 Nondestructive Examination, Inspection, and Weld Repair ................ 20 2.3.3.10 Pipe Coating, Inspection, and Repair .................................................. 20 2.3.3.11 Lowering-In, Padding, and Rough Backfill........................................... 20 2.3.3.12 Pressure Testing and Final Tie-ins ...................................................... 21 2.3.3.13 Cleanup, Restoration, and Revegetation ............................................. 21 2.3.3.14 Specialized Pipeline Crossings and Methods...................................... 21 2.3.3.15 Environmental Training ........................................................................ 22 2.3.4 Construction Noise Levels ................................................................................... 22 2.4 Operation and Maintenance Information .........................................................23 2.4.1 Ethane Cracker Facility ........................................................................................ 23 2.4.2 Pipeline Facilities ................................................................................................. 23 2.5 Safety Controls ...............................................................................................23 2.5.1 Ethane Cracker Facility ........................................................................................ 23 2.5.1.1 Spill Containment ................................................................................. 23 2.5.1.2 Hazard Detection System .................................................................... 23 2.5.1.3 Fire Protection System ........................................................................ 23 2.5.2 Pipeline Facilities ................................................................................................. 24 2.5.2.1 Training and Licensing......................................................................... 24 2.5.2.2 Corrosion Protection and Detection Systems ...................................... 24 2.5.3 Emergency Response Procedures ...................................................................... 24 3.0 ACTION AREA, SPECIES LIST, AND HABITAT, AIR, AND WATER QUALITY ANALYSIS .................................................................................................................25 3.1 Action Area .....................................................................................................25 3.2 Species List ....................................................................................................27 3.3 Habitat Analysis ..............................................................................................28 3.4 Waterbodies Traversed by the MEP Centerline ..............................................48 3.5 Air Quality Analysis and Results .....................................................................49 3.5.1 Estimated Annual Emission Rate ......................................................................... 50 3.5.2 Area of Impact Dispersion Modeling Methodology .............................................. 50 3.5.3 Dispersion Modeling ............................................................................................ 50 3.6 Water Quality Analysis ....................................................................................53 3.6.1 Chemical Discharge ............................................................................................. 53 3.6.2 Thermal Discharge ............................................................................................... 55 4.0 EFFECTS OF ACTION ...............................................................................................56 4.1 Gulf Coast jaguarundi (Herpailurus yaguarondi cacomitli) ...............................56 4.1.1 Distribution ........................................................................................................... 56 4.1.2 Endangerment Factors ........................................................................................ 56 4.1.3 Life History Requirements .................................................................................... 56 4.1.4 Field Survey Results ............................................................................................ 56 4.1.5 Impact Analysis ...................................................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    132 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us