State Five Year Work Program Road, Intersection and Bridge

State Five Year Work Program Road, Intersection and Bridge

Y ANCLOTE BLVD W LVD H B Y INIT E R I T E X I V VE D A A D LAN S IGH A N H L STATE FIVE YEAR SUNSET DR L E N PE(4377101) I P GULF RD KEYSTONE WORK PROGRAM N E LIME ST RD MERES BLVD CAP/PE(4337961) ROAD, INTERSECTION AND BRYAN LN T S Y A E KLOSTERMAN RD BRIDGE IMPROVEMENTS B E CAP/PE(4337971) LAK A E FR S FY 2018/19 - FY 2022/23 ONT T D R L A K E CAP/PE(4337991) R D CAP/PE(4359094) ALDERMAN RD CAP/CST(2567743) A W 9 NEBRASK 1 A AVE O O S D D U R L A E N RSF/CST(4364861) K 1 D A 1 S C L 6 A 1 B R U T S L R C V E S W D C AY CR 39 E B D W O L V V D RSF/CST(4376261) D L A B R RSF/CST(4376231) K CURLEW RD L E R E R E TA A M O H N P O F A R H C THS R IDE D S L DR B D Y E L S V A R B R B P 5 D 8 CAP/RSF/CST(2567742) A T 0 S L SOLON AVE O R E SR M U 59 R A H 0 D EVANS RD E L D E N N I MAIN ST SR 580 R R P RSF/CST(4402451) H O Y T H VIRG W INIA ST O S R K O D P B R E VIRGINIA AVE N E P E T P N I E RSF/CST (4364881) L A L L V E I W A UNION ST E U V H RE/CST(4387851) E A E V S M I P S G A V Y MONTCLAIR RD A C L H D A L Y T A W S M N UNSET POINT RD E A 9 G N D L H D L U D N D R Y A S A O W T R D E G L SR 590 D D T N N A N V R H I Y E L A E E G K B B I E M H Old Tampa Bay E H N K REP/DSB(4229042) C R L N N O N E H 9 DREW ST B S 1 CLEVELAND ST Y WY N CS A BELL Y AMP B EY C A N COURT ST COURT GULF TO BAY BLVD N W DRUID RD H E G V I A H B I LAKEV IEW RD A S R Y U U S IEL/DSB(4245012) O I D S NURSERY RD E S I BELLEAIR RD B M R D I RSF/CST(4376241) S D ` _ D R G ` R E E ROSERY S RD NW N 5 K 7 E -2 D I C E WHITNEY RD V O L K B R N F WEST BAY DR EAST BAY DR ROO A SEVELT BLVD Gulf of Mexico L I U D G N I 8TH AVE SW 8TH AVE SE D R 150TH AVE N N R D CAP/DSB (4338801) E T DRYER AVE 16TH AVE SE R H S S C D E L N R E 2 N C ULMERTO B N RD D WILCO 6 X RD A T S R S CAP/CST (4359142) D CAP/PE (2569314) E L 126TH A I H VE N 126TH AVE N D G R T O W R D 9 I O WALSINGHAM RD 1 S Y R 1 118TH AVE N E D 118TH AVE N E V E R K D LT LV R B T Y 6 BRYAN D B D D A AIRY RD N S L A N 9 N N G T V CAP/CST (2569312) V R 2 D L N S T T T U R B S S 102ND AVE N N S T H C S E T H H N K N H L T T S T A H T T 8 9 O 6 N T O S H 2 4 S 1 N 3 D 94TH AVE N T I T 1 H H R 0 S 1 M RSF/CST (4416501) T T 6 E T 8 R 86TH AVE N 6 E N 9 S 6 N S E VE 1 RSF/CST(4364851) T H D A 3 82ND AVE N S R C 3 1 8 L 78TH AVE N R E J B PARK BLVD N G 70TH N A N CAP/ENV (2570861) VE N 70TH AVE N I T K S R 62ND AVE H H N 62ND AVE N E 62ND AVE NE A T H IN 4 D E T N N S U U 54TH AVE N L T R H T CAP/PE (4394011) N D S N S M N N I BA T T N E Y T E P T T I H NE S B 46TH AVE N S N L S V S D T R T R S N 1 7 R N H A S D K 7 H 3 D T T T R E M 40TH AVE NE T H 8 V S K S A 38TH AVE N 4 T 2 O A R P 3 9 H T O H N D 1 L T T S CAP/CST (4378081) 0 T 6 R 5 1 E 1 1 S 30TH AVE N V O T H Y 7 R T 2 O 8 22ND AVE N N N 5 E D N E B R S L V 13TH AVE N D T D RSF/CST (4376251) H N N 9TH AVE N CAP/PE(4359093) C N 5TH AVE N I-375 A T E B S 1ST AVE N D CENTRAL AVE 1ST AVE S R S S 3 5TH AVE S T T I-175 CAP/PE (4245015) S S D 11TH AVE S H T Tampa Bay N ` B _ 6 2 ` _ L 14TH AVE S 1 S 15TH AVE S 2 I N S S S T COMMENCEMENT OF S D 18TH AVE S T S T T S S P T S 22ND AVE S S A H S RSF/CST (4364871) T H PROGRAMMED CONSTRUCTION S T S D H T H S 7 26TH AVE S 4 T N 3 T H F R 9 2 8 S A T FY 2018/19 - FY 2022/23 4 D 5 5 I 4 R S T W 3 S T A Y S T A S V H FY 2017/18 (or under CST) 1 E T REP/CST(4360561) 3 S 6 G U FY 2018/19 S CAP/CST(4376431) L F AY 54TH AVE S T YW S B BA L S FY 2019/20 LA H V L INE 62ND AVE S T D P 4 REP/DSB(4305011) FY 2020/21 Y A PINELLAS POINT DR S W FY 2021/22 E L RSF/CST(4348061) L I ` R CAP/CST (4370401) FY 2022/23 G A S S (XXXXXX) - Project Number A P S U RSF/CST(4348391) N - Intersection Improvements S H P - Bridges I I ` N _ N E E L - Arterial Road Widening S L A K RSF/CST(4325871) S Y W B A Does not include routine maintenance projects A Y Y ROW - Right-of-Way Acquisition REP/DSB (4107552) W A CAP - Capacity Projects RSF - Resurfacing / Rigid Y ³ S RE/CST (4395471) CST - Construction Pavement Rehab. ` DSB - Design-Build RE - Repair/Rehab. PD&E - Project Development and REP - Replacement _` Environmental Study TS - Traffic Signals PE - Preliminary Engineering VD RE/CST (4395161) IEL - Interstate Express Lanes BL N PS - Professional Services SO ER State Work Program Maps (Design) ND A Adopted: June 13, 2018 Dates represent start of construction Plot Date: May 23, 2018 SUMMARY TABLE OF ROAD PROJECTS IN THE STATE FIVE YEAR WORK PROGRAM FY 2018/19 - 2022/23 PROJECT LOCATION PROJECT STATUS NUMBER DESCRIPTION 4338801 Gateway Expressway/118th Ave N/CR New Road DSB underway 296 (Future 690) from US 19 (SR 55) Construction to E of 28th St N 6 to 8 lanes 4245012 I-275 (SR 93) from S of Gandy Blvd Interstate Express DSB underway th (SR 694) to N of 4 St N Lanes 4364881 Alt US 19 (SR 595)N and S Myrtle Ave Resurfacing CST 2018/19 from SR 60/Chesnut to Mohawk St 4364871 Alt US 19 (SR 595)/4th Ave N from 5th Resurfacing CST 2018/19 Ave N to 3rd St N 4364851 Alt US 19 (SR 595)/Seminole Blvd Resurfacing CST 2019/20 from S of 53rd Ave N to N of 101st Ave N 4376241 Alt US 19 (SR 595)/Seminole Blvd Resurfacing CST 2020/21 from 101st Ave N to East Bay Dr/Missouri Ave 4376231 Alt US 19 (SR 595) from Mohawk St to Resurfacing CST 2019/20 Tilden St/Skinner Blvd 4395471 I-275 (SR 93) Sunshine Skyway Bridge CST 2018/19 Bridge Repair/Rehabilitation 2567742 US 19 (SR 55) from N of SR 580 Add Frontage Roads, CST deferred from (Main St) to Northside Dr (including Reconstruction & 2019/20 to 2020/21 Republic Dr overpass) Resurfacing 2567743 US 19 (SR 55) from Northside Dr to Add Lanes, CST 2020/21 North of CR 95 (Curlew Rd Reconstruction and Interchange) New Interchange 4370401 I-275 (SR 93) from SB I-275 exit ramp Interchange CST 2018/19 to 22nd Ave S Improvement 4325871 SR 679 (Pinellas Bayway) from N end Resurfacing CST 2017/18 of Boca Ciega Bridge to SR 682 (54th Ave S) 4395161 Sunshine Skyway fishing pier bridge Bridge DSB 2019/20 repair Repair/Rehabilitation 4376431 SR 693/66th St N from 30th Ave N to Add Turn Lanes CST 2019/20 58th Ave N 4348061 SR 693 (South Pasadena Ave) from Resurfacing CST 2017/18 SR 691 (Blind Pass Rd) to Park St 2569312 SR 694 (Gandy Blvd) from W of 9th St Add Lanes & CST underway N to E of 4th St N Reconstruction Page 1 SUMMARY TABLE OF ROAD PROJECTS IN THE STATE FIVE YEAR WORK PROGRAM FY 2018/19 - 2022/23 PROJECT LOCATION PROJECT STATUS NUMBER DESCRIPTION 2569314 SR 694 (Gandy Blvd) from E of 4th St Add Lanes & PE 2021/22 to W of Gandy Bridge Reconstruction 2570861 SR 694 (Gandy Blvd) from E of US 19 Add Lanes & ENV added 2021/22 (SR55) to E of I-275 (SR93) Reconstruction 4 to 6 lanes 4107552 SR 679 (Pinellas Bayway) Structure E Bridge Replacement DSB 2017/18 Intercoastal Waterway 4348391 SR 682 (Pinellas Bayway) from US 19 Resurfacing CST 2017/18 (SR 55) to 41st St S 4387851 I-275 (SR 93) SB Howard Frankland Bridge CST deferred from Bridge Repair/Rehabilitation 2019/20 to 2022/23 4305011 Dr Martin Luther King Jr St N from 7th Bridge Replacement CST 2019/20 Ave S to 8th Ave S 4229042 I-275 (SR 93) NB Howard Frankland Bridge Replacement DSB 2019/20 Bridge 4359091 Alt US 19 (SR 595) Corridor Study I Operational PD&E study underway from Park St N to Belleair Rd Improvements 4359093 PE added 2021/22 4359092 Alt US 19 (SR 595) Corridor Study II Operational PD&E study underway from Belleair Rd to Pinellas/Pasco Improvements County Line 4359094 PE added 2021/22 4359142 US 19 (SR 55) from 66th Ave N to SR Interchange & PE 2018/19 690/118th Ave N Operational CST added 2022/23 Improvements 4378081 70th Ave N from US 19 (SR 55) to Interchange CST 2017/18 Cypress Terrace Improvements 4337991 US 19 (SR 55) from N of CR 95 to S of Add Lanes, PE underway Pine Ridge Way S (Interchanges at Reconstruction and ROW 2020/21 Tampa Rd and Nebraska Ave) New Interchanges 4337971 US 19 (SR 55) from N of Nebraska Add Lanes, PE underway Ave to S of Timberlane Rd Reconstruction and ROW added 2021/22 (Interchanges at Alderman Rd and New Interchange Innisbrook/Citrus Dr) 4337961 US 19 (SR 55) from S of Timberlane Add Lanes, PE underway Rd Ave to S of Lake St (Interchanges Reconstruction and ROW added in 2022/23 at Klosterman Rd and Mango St) New Interchanges 4360561 Brooker Creek Bridge from 10th Ave S Bridge Replacement CST 2019/20 to 11th Ave S Page 2 SUMMARY TABLE OF ROAD PROJECTS IN THE STATE FIVE YEAR WORK PROGRAM FY 2018/19 - 2022/23 PROJECT LOCATION PROJECT STATUS NUMBER DESCRIPTION 4364861 SR 586 (Curlew Rd) from E of Fisher Resurfacing CST 2018/19 Rd to W of Tally Dr/69th St N 4377101 Alt US 19 (SR 595)/S Pinellas Ave Intersection PE 2021/22 from S of Curlew Pl to N of Country Improvements Club Ct 4402451 SR 693/66th St N from SR 688 Resurfacing CST 2019/20 (Ulmerton Rd) to 138th Ave N 4376261 SR 584/SR 580/Tampa Rd from Resurfacing CST 2019/20 Tampa Rd/Curlew Rd to St.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    9 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us