Lower Don Trail Master Plan Refresh: September 17, 2019 Public Meeting

Lower Don Trail Master Plan Refresh: September 17, 2019 Public Meeting

LOWER DON TRAIL MASTER PLAN 2019 REFRESH Welcome to this Public Meeting for the Lower Don Trail Master Plan 2019 Refresh. This is the primary opportunity for the public to engage the team led by the City of Toronto in partnership with Evergreen as the overall project moves forward. This evening we will introduce the project, present the draft recommendations of the Master Plan Refresh, and discuss next steps. Feedback We welcome your feedback on our work to date. Please ask for an Agenda / Comments Sheet from the registration table to record your thoughts. You can leave it at the registration table tonight or send your feedback by e-mail (contact below) by Friday September 27, 2019. Contact Brendan McKee, Project Manager Parks, Forestry and Recreation | Horticulture City of Toronto Scarborough Civic Centre, 150 Borough Drive Toronto, Ontario M1P 4N6 t: 416-396-4192 e: [email protected] Website www.toronto.ca/lowerdon LOWER DON TRAIL MASTER PLAN 2019 REFRESH CITY OF TORONTO + EVERGREEN IN PARTNERSHIP DTAH 09.17.2019 Project Purpose & Outcome This Refresh represents the second Reasons for the Refresh include: round of master planning the Lower Don Trail. It follows and updates the A different way of thinking: Since 2013, both of the profile of the Don Valley lands 2013 Master Plan, which resulted in a and the public conversation regarding their future have grown and become more number of successful improvements sophisticated. There is now a general consensus that the Don Valley should be thought to the trail and its surroundings. of, and planned for, as a single cohesive park space, rather than a collection of pieces. Expanded geographic scope: Our study area has been extended northward to the Don River Forks, and includes Crothers Woods, Coxwell Ravine and part of E.T. Seton Park. A changing planning context: Plans for surroundings areas, such as the Unilever Precinct, have incorporated aspects of the 2013 Plan and can be built upon further. Building on success: The implementation of some elements of the 2013 Master Plan means that new opportunities have been opened for consideration. Indigenous involvement: Indigenous consultation took place during the preparation of the Master Plan Refresh, and it is hoped that these relationships will grow and influence the detailed design and programming of its recommendations. Cyclist on Lower Don Trail, with Thorncliffe Park in background. 2/16 LOWER DON TRAIL MASTER PLAN 2019 REFRESH CITY OF TORONTO + EVERGREEN IN PARTNERSHIP DTAH 09.17.2019 History & Timeline 2003 West Don Lands Precinct Plan 2006 Evergreen Brick Works 2007 Lower Don Lands Competition late 1980s Task Force 2015 to Bring Back Evergreen_Don River Charrette the Don 2016 DRVP Case for Support “Super Park” Announcement 2019 Lower Don Phase 2 Improvements 2018 Parkland Strategy early-mid 90s TO Core Parks + Public Realm Lower Don Trail Unilever Precinct Plan Queen St. Staircase Port Lands Planning Framework Restoration Efforts Lower Don Trail MP Update 2017 Ravine Strategy 2014 Lower Don Phase 1 Improvements 2013 Lower Don Trail Access, Environment and Art MP This Master Plan Refresh does not start from scratch; it builds upon, and 1 GUIDING PRINCIPLES: STEP INTO CONNECTIONS, CULTURE, ENVIRONMENT is informed by, numerous projects A NEW IDEA The Don River Valley Park will build connections to Created by people committed to changing Toronto for the and from neighbourhoods, provide opportunity for better, the collaborative vision of the Don River Valley Park Torontonians and visitors to engage in cultural activities will transform Toronto the good into Toronto the great. and enhance the environment. It will draw tourists to Toronto and stimulate economic activity and investment. 1/ Connections over the past several decades. These • Improve access points and enhance cycling/pedestrian commuting • Link communities along and across the Valley • Connect the new mouth of the Don to the vast ravine system include the 2013 Master Plan, but also 2 2/ Culture • Curate an exceptional contemporary art trail making art, performance and installations accessible to Torontonians and visitors subsequent work. • Create places that integrate culture, nature and community • Provide moments for contemplation, where visitors can engage with the landscape 3/ Environment • Protect sensitive ecological features and enhance our forest canopy • Mobilize citizen stewards to restore the landscape and bring people back to the 3 Don River’s edge • Create landscapes that mitigate The Master Plan seeks to: the impact of climate change Proposed new crossing from Evergreen Brick Works to the east side of the Don River. EBW Charrette 2015/Group 1/Rendering: Gosselin (main). EBW Nicholas Charrette 2015/ Roof Brown Dance Company, Group 2/Rendering: Emma Mendel (upper right). Trisha (bottom right) Derblich High Line, photo by Lev Radin (middle). Mike Piece, 2011, The Don6 Valley River Park Case for Support (2016). Evergreen-commissioned visionaryDON RIVER VALLEY PARK /7 y Confirm previous recommendations not document that built on some aspects of the 2013 Master Plan. yet implemented. y Identify new opportunities for connections, public art, and environmental improvements. y Provide new opportunities for energizing dynamic community support. y Take advantage of leadership and momentum by the City, Evergreen and other agencies and partners in the Lower Don Valley. The 2013 Master Plan, a starting point for the Master Plan Refresh. Bringing Back The Don (1991). Figure illustrating the landscape strategy for the Lower Don Valley. 3/16 LOWER DON TRAIL MASTER PLAN 2019 REFRESH CITY OF TORONTO + EVERGREEN IN PARTNERSHIP DTAH 09.17.2019 Opportunities & Constraints As a geographic feature, the Don Valley has a high profile in Toronto— perhaps second only to the waterfront. It has the opportunity to become a truly landmark space, integrating recreation, infrastructure and Evergreen Brick Works Todmorden Mills Slopes of Brick Works quarry natural systems. Opportunities include: y Rebranding of the valley parks as a single system. y Adding portal gateways, and spaces to The Belleville Underpass Riverdale Foot Bridge across the Public art installation View of Prince Edward Viaduct pause, or to approach the river. Don River from Bayview Multi-Use Trail y Better connections to neighbourhoods. y Opening up new park spaces (especially the Snow Drop site). y Widening portions of the trail, connecting segments, adding spurs. y Removing, consolidating or redesigning older infrastructure to improve trail connectivity and add natural space. y New public art installations. y Indigenous programming. The Leaside Viaduct, as seen from the Lower Don Trail Steps behind Water Treatment Plant Constraints include: y The barriers to trail use formed by infrastructure (highways, railways, roads, as well as hydro and gas lines). y The risk of floods and the need to design all improvements to accommodate flooding. y Limited opportunities for servicing (e.g. plumbing for public washrooms). y Steep slopes are barriers for some users. y The isolation of some parts of the Valley Pilot signage on trail Driveway from Thorncliffe Park down to E.T. Seton Park makes them difficult to get to and may pose safety risks. Trail underpass under Don Mills Road Crothers Woods kiosk Public art at the Don River Forks Trail bridge to Crothers Woods The historic Eastern Avenue Bridge, which must be removed or relocated Riverdale Park East looking towards Downtown Lower Don Trail passing beneath Gardiner / DVP ramps 4/16 LOWER DON TRAIL MASTER PLAN 2019 REFRESH CITY OF TORONTO + EVERGREEN IN PARTNERSHIP DTAH 09.17.2019 Guiding Principles The intensification and development Goals + Principles Connectivity of new communities in the Lower Don y Connect major destinations along and Valley neighbourhoods will bring y To recommend strategies to improve adjacent to the trail, while promoting the tens of thousands of new residents accessibility, visibility, environmental Don Valley as a destination unto itself. into the core of the city. These new protection, and to consider possibilities for y Link the trail to existing infrastructure residents will significantly increase new programming. including other trails, bike lanes, streets the demands put on the Don Valley y To rehabilitate and make better use of and transit. lands as a place to recreate, commute former industrial lands, and to work to y Integrate the trail into the life of its and travel through. overcome the obstacles created surrounding neighbourhoods, through by infrastructure. signage and public realm improvements. At its core, the Master Plan Refresh y To incorporate existing studies and to y Optimize the use of historic seeks to reconcile this contradiction: build on the work of the 2013 Master Plan. infrastructure by removing or re-purposing how can more people enjoy the y To stimulate, and contribute to, the elements to improve connectivity. benefits of the Don Valley, while ongoing public discussion on improving simultaneously better protecting and and raising the status of the Lower Don. Preservation enhancing its natural environment? y Protect and preserve the most sensitive The following series of principles natural areas. underpin the Master Plan Refresh. They have been adapted from the 2013 Plan. Recreation and Education y Participation Enhance safe and responsible interaction with the natural environment, Invite opportunities for public especially with the Don River itself. participation in future implementation y Develop multiple options

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    18 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us