CRSWSC Water Master Plan Strategic Plan Presentation.Pptx

CRSWSC Water Master Plan Strategic Plan Presentation.Pptx

Master Plan & Strategic Plan Presented by Shawn Olson & Rick Sereda Master Plan & Strategic Plan Presentation Purpose • Present Master Plan update • Optimizing Edmonton Annexation opportunity • Present Strategic Plan Master Plan & Strategic Plan Presentation Agenda • Membership/Background • System Projections • Asset Transfer/Sale • Proposed Capital Improvements • 5 Year • Long term • Funding Requirements • Strategic Plan Highlights Membership • Beaumont • Calmar • Camrose County • Hay Lakes • Leduc • Leduc County • Millet System Map Master Plan Scope • Reviewed the 2013 Master Plan • Obtained water system demands • Identified infrastructure constraints • Identified potential new water users (City of Camrose) • Assessed the system pursuant to the City of Edmonton Annexation 2018 Water Consumption Within the Commission Leduc County - Hamlet of New Sarepta (0.8%) Leduc County - Edmonton International Airport (6.5%) Leduc County - Nisku East and West (11.8%) Town of Calmar (4.1%) Camrose County - Hamlet of Armena (0.1%) Village of Hay Lakes (0.6%) Town of Millet (3.2%) City of Beaumont (22.8%) City of Leduc (50%) Historical Growth Rates (Water Demand) Projected Water Demand Usage Increase Commission Projections (2012-2043) Future Connections • The Commission is anticipating new services to tie-into the system in the near future. • Leduc County Rural (Rolly View and Looma) • City of Edmonton – Discovery Park (completed) • Leduc County Saunders Lake Industrial Area • City of Leduc Robinson Reservoir (completed) • City of Leduc West Reservoir Regional Service Concepts • The City of Edmonton has recently annexed lands through or adjacent to Commission infrastructure. • 3 servicing options: • Option 1 – Status Quo. • Option 2 – Transfer adjacent assets to EPCOR & second feed to Beaumont. • Option 3 – Option 2 without second feed to Beaumont. Option 2 Selected! • Rational to proceed with Option 2 (savings of $39.7 Million in Net Present Value) • EPCOR was in agreement to provide redundancy to Beaumont. • Reduced Operational requirements. • Avoid potential relocation associated with QE2 realignment and interchange upgrades. Next 5 years • Increase pumping capacity at the Highway 21 Booster Station (2019) • Transfer Commission assets to EPCOR (2020) • Construct new Booster Station (2023) • EPCOR installs new billing meters (2023) Next 30 years • Construct Beaumont’s secondary supply line (2028) • Twin 750 mm diameter pipe (2035) • Upgrade line East of Highway 21 (2044) Anticipated Capital Costs Water Rates The Commission requested that the following scenarios be reviewed: • Scenario 1 – Maintain current water rate until increase is required. Commission takes debentures to finance upgrades. Maximizes Commission’s debt limit. • Scenario 2 – Rate increases so no debentures are required. (No debt) • Scenario 3 – Water rate is reduced. Commission no longer allocates funds for future upgrades. Members required to contribute funds for upgrades. (Exceeds debt limit) • Scenario 4 & 5 – Commission uses combination of cash reserves and debt financing. Unit Cost Analysis – Scenario 5 Cash Flow – Scenario 5 Master Plan Conclusion • The average projected water demand for the Commission is 3.1% over 25 years. • The Commission and EPCOR have reached an Agreement regarding the transfer of assets as per the Option 2. • Members will not see an increase in water cost from the CRSWSC until 2023. (going forward; rates for 2020 have already been pre determined) Strategic Plan • A Strategic Plan was developed for 2019-2023. • Identified Goals and Strategies for the Commission Strategic Plan CRSWSC Goals Strategic Plan 2019 High Priority Strategies • To be completed by 2023 and reviewed annually. QUESTIONS?.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    25 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us