ANSWERED ON:17.08.2005 MULTINATIONAL COMPANIES in DEVELOPMENT WORKS of N.Hs Rawat Shri Kamla Prasad

ANSWERED ON:17.08.2005 MULTINATIONAL COMPANIES in DEVELOPMENT WORKS of N.Hs Rawat Shri Kamla Prasad

GOVERNMENT OF INDIA SHIPPING, ROAD TRANSPORT AND HIGHWAYS LOK SABHA UNSTARRED QUESTION NO:3483 ANSWERED ON:17.08.2005 MULTINATIONAL COMPANIES IN DEVELOPMENT WORKS OF N.Hs Rawat Shri Kamla Prasad Will the Minister of SHIPPING, ROAD TRANSPORT AND HIGHWAYS be pleased to state: (a) the details of the Multinational Companies involved in the development works of National Highways; (b) the details of the funds allocated during the last three years, company-wise; (c) whether the Government has reviewed their works; (d) if so, the details thereof; (e) whether the target set by these companies has been achieved; and (f) if not, the action being taken by the Government against the companies for slow progress? Answer THE MINISTER OF STATE IN THE MINISTRY OF SHIPPING, ROAD TRANSPORT AND HIGHWAYS(SHRI K. H. MUNIYAPPA) (a) The details of foreign companies involved in the development work of National Highways under National Highways Development Project (NHDP) are given at Annexure - I (b) No company wise allocation of funds is made. (c) to (f) The performance of the contractors/supervision consultants including those of foreign Multi National Companies are periodically reviewed. A comprehensive review of the performance of National Highways Development Project (NHDP) Phase I have been carried out and seventeen firms including eight foreign firms have been declared as non-performing firms and debarred from bidding for future contracts. Five contracts involving foreign companies have already been terminated. Annexure - I ANNEXURE REFERRED TO IN REPLY TO PART (a) OF LOK SABHA UNSTARRED QUESTION NO.3483 FOR ANSWER ON 17TH AUGUST, 2005 ASKED BY SHRI KAMLA PRASAD RAWAT REGARDING MULTINATIONAL COMPANIES IN DEVELOPMENT WORKS OF N.Hs. A Details of the foreign construction firms involved in development work of National Highways under National Highways Development Project (NHDP) Sr.No Stretch NH No. Length (km) Project Cost (Rs. Crore) Present Status Contractor Nationality 1 Fatehpur - Khaga (TNHP/II-C) 2 77 372.4 Under Implementation Centrodorstroy Russia Russian 2 Handia - Varanasi (TNHP/III-C) 2 72 286 Under Implementation Centrodorstroy Russia Russian 3 Mohania - Sasaram (TNHP/IV-B) 2 45 230.55 Under Implementation LG Engg. & Construction Ltd. Korean 4 Panagarh - Palsit 2 64.457 350 4 LANED Gamuda Malaysia - WCT Malaysia Malaysian 5 Palsit - Dankuni 2 65 432.4 4 LANED Consortium of Gomuda (Malaysia) & WCT Engineering (Malaysia) Malaysian 6 Vivekananda Bridge and Approach 2 6 641 Under Implementation SVBTG Consortium of AIDC group (USA), STRADC (Phillipines) Phillipines - USA JV 7 Ahmedabad-Vadodara Exp. Way Phase-I 8 43.4 165 4 LANED PT Sumber Mitra Jaya Indonesian 8 Dhankuni - Kolaghat (WB-I) 6 54.4 393 Under Implementation RBM - PATI (JV) Malaysian 9 Nellore - Tada (AP-7) 5 110.517 621.35 4 LANED CIDBI Malaysia Malaysian 10 Bhogpur to Jalandhar (NS-16/PB) 0.04167 21.77 71.18 4 LANED M/s Bumi Highway Malaysian 11 Thopurghar section (NS/14) 7 7.4 33.74 4 LANED P.T. Sumber Mitra Jaya Indonesian 12 Orai to Jhansi (UP-4) 25 66 356 Under Implementation M/s Sunway Construction Ltd. Malaysian 13 RJ/MP Border to Kota (RJ-9) 76 43.15 277 Under Implementation M/s Sunway Construction Ltd. Malaysian 14 Chittorgarh Bypass (RJ-6) 76 40 288 Under Implementation M/s China Gezhouba Water & Power(Group) Co. Ltd. China 15 Jetpur to Bhiladi (Package-II) 8B 64.5 399.89 Under Implementation M/s Longjian Road & Bridge Ltd China 16 Nandigama - Vijayawada 9 35 138.65 4 LANED CIDB Malaysia Malaysian 17 Mahaua-Jaipur 11 108 483 Under Implementation IJM Corporation Berhad Malaysian Total 923.59 5539.16 B Details of the Foreign construction firms having Joint Venture involved in development work of National Highways Sr.No Stretch NH No Length (km) Project Cost (Rs. Crore) Present Status Contractor Nationality 1 Etawah - Rajpur (GTRIP/I-C) 2 72.825 348.444 Under Implementation M/S PATI-BEL Malaysia - Indian JV 2 Sikandara-Bhaunti (TNHP/II-A) 2 62 323.62 Under Implementation IT Thai & Som Dutt Builders India (JV) Thai - Indo JV 3 Varanasi - Mohania (GTRIP/IV-A) 2 76 467.93 Under Implementation M/S PCL-Sunway Berhad (JV) Indian - Malaysia JV 4 Dehri - on-Sone - Aurangabad (TNHP/IV-D) 2 40 242.61 Under Implementation Ssangyong Korea - Oriental SE India Korean - Indian JV 5 Gorhar - Barwa Adda (TNHP/V-C) 2 78.75 399.745 Under Implementation Progressive Const. Ltd. & Sunway Berhad (JV) Indian - Malaysian JV 6 Barwa Adda - Barakar 2 43 120 4 LANED BSC - RBM - PATI (JV) Indian - Malaysian JV 7 Raniganj - Panagarh 2 42 137 4 LANED BSC - RBM - PATI (JV) Indian - Malaysian JV 8 Gurgaon - Kotputli 8 126 251 4 LANED BSC - RBM - PATI (JV) Indian - Malaysian JV 9 Gulabpura - Bhilwara Bypass (KU-III) 79 50 164.25 4 LANED ECSB - JSRC (JV) Malaysian - Indian JV 10 Chittorgarh - Mangalwar (KU-V) 76 48 161.2 4 LANED Madhucon Binapuri (JV) Malaysian - Indian JV 11 Ratanpur - Himatnagar (UG-III) 8 54.6 182.29 4 LANED Mudajaya - IRB Malaysian - Indian JV 12 Ahmedabad-Vadodara Exp.Way Phase-II NE1 50 365 4 LANED LG Engg. and Const. Co. & Nagarjun Const. Ltd. Korean - Indian JV 13 Surat (Chalthan) - Atul 8 79.6 504.6 4 LANED SKEC - Dodsal Korean - Indian JV 14 Atul - Kajali 8 38.6 174.59 4 LANED LG Constructions - Patel Engineering Korean - Indian JV 15 Balasore - Bhadrak (OR-III) 5 62.64 227.25 Under Implementation Elsamex - TWS - Shanker Narayan Shetty (JV) Spain - Indian JV 16 Khurda - Sunakhala (OR-VI) 5 52.058 189.68 Under Implementation Sumbher Mitra Jaya - Rohit Kumar - Sri Durga Construction (JV) Indonesian - Indian JV 17 Sunakhala - Ganjam (OR-VII) 5 55.713 225 Under Implementation Progressive - Sticco Indian - South Arabian 18 Ankapalli - Tuni 5 58.947 283.2 4 LANED GMR-Tuni-Ankapalli Express Ltd. Indian - Malaysian JV 19 Gowthami - Gundugolanu (AP-18) 5 81.08 323.35 4 LANED Limak - Soma (JV) Turkish - Indian JV 20 Eluru-Vijayawada Package V 5 72 134 4 LANED Madhucon - Binapuri Indian - Malaysian JV 21 Vijayawada - Chilkaluripet Package I 5 25 60 4 LANED IJM - Gayatri Malaysian - Indian JV 22 Vijayawada - Chilkaluripet Package II 5 32 80 4 LANED IJM - Gayatri Malaysian - Indian JV 23 Vijayawada - Chilkaluripet Package III 5 23.78 68 4 LANED IJM - Gayatri Malaysian - Indian JV 24 Chilkaluripet - Ongole (AP-13) 5 66 319.21 Under Implementation IJM - Gayatri Malaysian - Indian JV 25 Ongole - Kavali (AP 12) 5 72 321.41 Under Implementation HO - HUP - Simplex (JV) Malaysian - Indian JV 26 Katraj - Sarole (PS-3) 4 28.5 97.9 Under Implementation Satav Constt. Pvt. Ltd. and Dena Rehsaz Indian - Iranian JV 27 Belgaum Bypass 4 18 115.9 Under Implementation Sunway Construction - Berhad & R N Shetty & Co. Malaysian - Indian JV 28 Belgaum - Dharwad 4 62 279 Under Implementation Sunway Construction - Berhad & R N Shetty & Co. Malaysian - Indian JV 29 Haveri - Harihar 4 56 241 Under Implementation UEM - ESSAR (JV) Malaysian - Indian JV 30 Harihar - Chitradurga 4 77 318 Under Implementation UEM - ESSAR (JV) Malaysian - Indian JV 31 Chitradurga Bypass 4 18 104 Under Implementation Dolomite Berhad- AL Sudershan (JV) Malaysian - Indian JV 32 Chitradurga - Sira 4 66.7 304 Under Implementation UEM - ESSAR (JV) Malaysian - Indian JV 33 Borkhedi-Jam (NS-29/MH) 7 27.4 110 Under Implementation M/s JSR-Ketan Construction Limited Indian - Indonesian 34 Construction of Karur ROB 7 0.84 12.15 4 LANED P.T. Sumber Mitra & Jaya and Punj Lloyd Indonesian - Indian JV 35 Deesa to Radhanpur (Package-VI) 14 85.4 399.89 Under Implementation M/s Daelim Industrial Corp. Ltd.-Nagurjan const. Corp. (JV) Korean - Indian JV 36 Radhanpur to Gagodhar (Package-V) 15 106.2 429.4 Under Implementation M/s Jilin - Sadbhav (JV) Chinese - Indian 37 Gagodhar to Garamore (Package-IV) 15 & 8A 90.3 412.78 Under Implementation M/s Daelim Industrial Corp. Ltd.-Nagurjan const. Corp. (JV) Korean - Indian JV 38 Garamore to Bamanbore (Package-III) 0.3333 71.4 360.7 Under Implementation M/s Daelim Industrial Corp. Ltd.-Nagurjan const. Corp. (JV) Korean - Indian JV 39 Bhiladi to Porbandar (Package-I) 8B 50.5 255.96 Under Implementation M/s LIMAK - SOMA (JV) Turkish - Indian JV 40 Tambaram - Tindivanam 45 93 375 4 LANED Tambaram-Tindivanam Express way Pvt. Ltd. (Consortium of GMR Consortium & UE Malaysia) Indian - Malaysian JV 41 Delhi - Gurgaon Section (Access Controlled 8/6 Lane) 8 27.7 555 Under Implementation M/s Jaiprakash Industries Ltd. - DS Constt. Ltd. Indian - UK 42 Nandigama - Vijayawada 9 48 0 4 LANED BSC - RBM - PATI (JV) Indian - Malaysian JV 43 Chennai Bypass Phase I 4 & 45 19 75 4 LANED IJM - SATYAM Construction Ltd. Malaysian - Indian JV 44 Cable Stayed bridge on river Yamuna near Naini 27 6 219.78 4 LANED Hyundai - HCC Korean - Indian JV 45 Haldia Port 41 53 273 Under Implementation CWHEC - HCIL (JV) Chinese - Indian 46 Raipur - Aurang 6 45 190 Under Implementation M/s Apollo(UK) - JLI(UK) - DSC(Indian) - LOR(UK) Consortium UK Total 2512.53 11201.84 C Details of the Foreign Supervision consultancy firms involved in Development work of National Highways Sr.No Stretch NH No Length (km) Project Cost (Rs. Crore) Present Status Supervision consultant Nationality 1 Khaga - Kokhraj (TNHP/III-A) 2 43 151.7 4 LANED MEINHARDT (Singapore) Pte Ltd. Singapore 2 Handia - Varanasi (TNHP/III-C) 2 72 286 Under Implementation MEINHARDT (Singapore) Pte Ltd. Singapore 3 Varanasi - Mohania (GTRIP/IV-A) 2 76 467.93 Under Implementation N.D. Lea Intl. Canada 4 Sasaram - Dehri on-sone (GTRIP/IV-C) 2 30 221.87 Under Implementation Lea Intl.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    80 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us