Custom Color-Matched Conduit Shows Pittsburgh Pride

Custom Color-Matched Conduit Shows Pittsburgh Pride

012319 CUSTOM COLOR-MATCHED CONDUIT SHOWS PITTSBURGH PRIDE In August 2016, Pittsburgh’s Andy Warhol (Seventh Street) Bridge closed for a $26 million improvement and repair project. The nearly QUICK FACTS 1,100-foot bridge is one of the “Three Sisters” built to span the PROJECT NAME Allegheny River in the mid 1920s. Since the original construction, none Seventh Street Bridge, Pittsburgh of the bridges had seen a significant overhaul, and new construction APPLICATION on the bridge included a concrete deck, lighting, drainage systems, Bridge updated lane configuration, and a new coat of hometown-proud yellow CHAMPION FIBERGLASS paint – plus, a special request for customized conduit. PRODUCT(s) Champion Duct® Reinforced Challenge Thermosetting Resin Conduit (RTRC) Duquesne Light Company was charged with replacing the GRC conduit that was currently carrying power into downtown Pittsburgh, and had a special request for Champion Fiberglass. They needed a lightweight, cost-efficient conduit to replace the heavy GRC conduit – and that conduit had to be a bright, vibrant Aztec Gold, the color Part of a $26M that represents all three of Pittsburgh’s major sports franchises: the NFL’s Pittsburgh rehabilitation Steelers, the NHL’s Pittsburgh Penguins and Major League Baseball’s Pittsburgh Pirates. Solution Provided custom Champion Fiberglass is no stranger to providing customized solutions to customer specifications. From unique bends to fittings built to customer plans, Champion color-matched Fiberglass is well equipped to deliver. Color matching was no different. In this case, conduit in Pittsburgh Champion Fiberglass obtained the Federal Standard color details for Aztec Gold, enabling a perfect color match. During the manufacturing process, Champion Fiberglass replaced Aztec Gold the commonly used grey or black pigment that gives most epoxy fiberglass its color with the vibrant Aztec Gold pigment. 5,300 vehicles pass Results over the bridge daily The bridge reopened in November, 2017, featuring conduit that not only matches the deep gold shade of the Seventh Street Bridge itself, it gives Pittsburgh residents a flash of hometown pride as they make their morning and evening commutes. With strong, reliable Champion Fiberglass as the electrical conduit of choice on this project, the city can look forward to this colorful conduit brightening up the Seventh Street Bridge while providing excellent, long-lasting protection for downtown Pittsburgh’s power supply. CHAMP™ manufacturing conduit to the order and specification of engineers everywhere. 6400 Spring Stuebner Rd, Spring, TX 77389 Main: 281.655.8900 Fax: 281.257.2523 championfiberglass.com.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us