Sunrail Expansion Resolution of Support January 28, 2021

Sunrail Expansion Resolution of Support January 28, 2021

AGENDA ITEM 6F CITT Meeting MAY 2021 11 PROGRESS WITH TRI-RAIL TriRail MiamiCentral Access Update ❑ Station punch list nearly complete, confirmed by multiple SFRTA site walks ❑ Brightline and SFRTA teams are taking final train measurements and performing platform survey to ensure level boarding compliance, making necessary adjustments to stay within FRA/APTA/ADA tolerances ❑ Bridge load ratings were performed and delivered to SFRTA ❑ Operating documents are being updated to accommodate TriRail equipment specifications ❑ PTC Implementation Plan was submitted and approved by FRA, included SFRTA as a tenant railroad on the Brightline/FEC corridor ❑ TriRail is completing installation of Automatic Train Control, required for operating on the Brightline/FEC corridor ❑ Brightline/FEC Corridor Positive Train Control will be complete by fall 2021 22 Brightline’s Florida System Connecting two of the largest and most congested markets in the nation • Brightline is the owner of the passenger rail easement • Extension to Orlando International Airport and on the FECR/BL corridor station under construction • Plan to reopen S. Florida operations in late 2021 • Engineering underway for expansion to Disney Springs and Tampa • Two additional In-Line stations underway: Aventura and Boca Raton (2022) $4.2B 53% 2.7mm 1000+ investment complete man-hours worked to date workers on the job 333 AVENTU RA Miami-Dade County System • Key component of Miami-Dade County’s “SMART” Plan to improve mobility in county • 13-mile corridor between MiamiCentral and Aventura serving up to 5 stations 151ST STREET • Estimated annual weekday ridership of 3.6 million growing to 5.5 million 125TH STREET • Worked with County to develop framework for access fee and infrastructure budget WHAT IT MEANS FOR BRIGHTLINE LI TTLE HAITI 1 2 3 Feeder system Framework of deal approved Leads to future system by MDC county on 11/5/20 connecting Brightline connections in: DESI GN DISTRICT • $50 million up-front Broward County and to all major payment communities Palm Beach County • Access fees of $12 W YNWOOD million/year M I AMICENTRAL 44 Miami-Dade County Commuter Rail Checklist of Completed Items with Miami-Dade County ✓ Two County Commission meetings in 2020 to discuss project and deal terms ✓ Completed RTC modeling • Approval from Commission to proceed with ✓ Miami Dade completed two independent appraisals advancing discussions of the FEC Corridor ✓ Held public workshop to discuss station locations ✓ Miami Dade received multiple proposals for operating system ✓ Completed ridership forecast ✓ Hired environmental consultant for NEPA PENDING ITEMS ✓ NEPA environmental documents submitted to FTA ❑ Access agreement ✓ Developed track chart ❑ Development agreement ✓ Developed station program elements ❑ Operating agreement ✓ 15% Rail Infra design underway 55 Miami-Dade Commuter Rail Benefits GENERATES ECONOMIC GREENER CREATES NEW JOBS BENEFITS Will remove 1.9 million cars from 23,500+ non-recurring jobs created $5.5 million annual revenue for local roadways each year Miami-Dade County 2,500 permanent jobs created Will remove nearly 5,500 metric $7.2 million annual revenue for tons of CO2 each year $282 million in annual labor income Miami-Dade Public Schools BY THE NUMBERS • Initial Ridership estimates for Miami-Dade Commuter Rail With the implementation of the Preferred Land Use Scenario (PS): • 3.6 million riders (base year) • Projected population: 262,000 (2040) to 307,000 (PS) an increase of • 5.5 million riders (2040) 44,500 in population or 16% higher than in 2040 • Projected employment: 158,000 (2040) to 188,000 (PS) an increase of 30,000 in employment or 18% higher than in 2040 • Will generate $5 billion in economic impact over first 10 years 66 7.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    7 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us