Reference List PTPS Wind 2005 06 4 for CUSTOMERS

Reference List PTPS Wind 2005 06 4 for CUSTOMERS

Windpower System Business References DEUTD / TDX 5 - DW 1905 Year of Installation (+ = Year of Order) 2005 Australia ElectraNet Lake Bonney Wind Farm 1 2004 Canada Vestas Miller Mountain 2002 Denmark ELTRA / ELSAM Horns Rev 1 Country 2003 Denmark Energi E2 OWP Nysted 1 2002 Denmark Samsoe Havvind Moellepark OWP Samsoe 1 2006 Egypt NREA Gamesa Eólica 2003+ Germany Energiekontor, HB / e.dis Badingen UW 1 2001 Germany P&T Technology AG Dahme 1 2000+ Germany WSB Dresden Dauer UW 1 2004 Germany Avacon Ellingen Windpark 2000+ Germany WSB Dresden Elster UW 1 2000+ Germany Lenz-Öko-Gewerbe Bau GmbH Etzdorf / Saulbusch Windpark 1 Customer 1999+ Germany BOREAS / TEAG Graefentonna UW 1 2004 Germany Windpark Norderland / EWE Holtriem II Windpark 2002+ Germany ESAG UW1Kodersdorf 2003+ Germany MDP & Wiemken / Sallentin Kodersdorf UW 1 2002+ Germany ENERCON GmbH Mittelherwigsdorf 1 2002+ Germany Energiekontor, HB / e.dis Mürow UW 1 2001+ Germany Plambeck / Avacon Nielebock UW 1 2001+ Germany e.dis / Regema GmbH Schwerinsburg UW 1 54 Reference List PTPS Wind _2005_07_1_for CUSTOMERS_ohne Links.xls / Tabelle1 2001 Germany ENERCON Thyrowberg 1 1999+ Germany e.dis Willmersdorf UW 1 2003+ Germany NATENCO - Natural Energy Corporation GmbH Wolgast 1 2000 Germany ABB Greece Pithanitis, Rhodos 2004 Greece PPC Didimon W.P. Project 2002 Greece WRE Hellas S.A. Logotheti 2000 Greece Polipotamos Windpower A.E./ IEE-Kiel Polipotamos Windpark 1 2004 India ENERCON (India) 2004 India ENERCON (India) Gadag 110/33kV Station 2005 India ENERCON (India) Druck : 05.07.2005 / 17:05 2005 India ENERCON (India) Dharapuram 110/33kV S/S Number of Substations ( if 2005 India ENERCON (India) Anathapur 132/33kV Sub Station documented ) AIS Transformer / switchgear + cables Switchgear + cables+ Control Type of deliveries equipment Switchgear AIS / Greenfield (turnkey) AIS / PS1 Windpark turn-key AIS AIS / Greenfield (turnkey) Voltage Level(s) [ in kV ] and AIS 132 / 33 Power ( if filed ) AIS / PASS MO 161/ 34,5 AIS / Compass 150/33 AIS / Upgrade (eXtension) AIS 132/33 AIS 46 x 1,75 MW f 110 / 20 / 31,5 MVA S/S onlyVESTAS X V66 X X X T Xurbines + XManu acture 2003r 110 kV 33 Vibrant Bhatia 132/33KV AIS 30 x 1,8 MW VESTAS V80 GIM - II Chitradurga 66/33kV Sub 20 AIS / PS1 80 x 2,0 MW 110 / 20 / 63 MVA S/S onlyVESTAS X V80 X X X X X 2000 110 kV AIS 63 MW 72 x 2,2 MW Substation Bonus Energy AIS Windpark Turn-key ( by ABB 110 / 20 / 31,5 MVA S/S only X X X X X X 2000 110 kV 10 x 2,3 MW New entur s (divested )) AIS Bonus Energy V e 100 x 0,85 MW A/S 110 S/S only X X X X X X 2004 110 kV Station AIS / MUW 110 / 20 / 63 MVA S/S only X X X X X X 1999 110 kV Gamesa AIS 110 / 20 S/S only X X X X X X 1999 110 kV 110 / 20 / 50 MVA S/S only42 X X1,5 MW 2004 110 kV Grid connection Turn-key Windpark turn-key (EPC- Contr. ) 110 / 20 / 31,5 MVA S/S only XNEG Micon X X X X X 2002 110 kV AIS / Greenfield (turnkey) x, Only of X X X X X X X 2003 132 kV EPC Windpark turn-key shore AIS 110 / 20 S/S only X X X X X X 2001 110 kV Substation Turn key 110 / 20 / 31,5 MVA S/S only X X X X X X 2002 110 kV GIS / Greenfield (turnkey) 110 / 20 S/S only X X X X X Xf 2001 110 kV HV Cabling 110 / 20 / 40 MVA S/S only X X X X X X 2001 110 kV HV CB Live Tank HV Cabling Offshore 110 / 20 / 31,5 MVA S/S only X X X X X X 2001 110 kV X X X X X X X X X 2003 110 kV HV CB Live Tank 110 / 20 / 31,5 MVA HV Equipment HV CB Live Tank X X 2005 20 kV X X 2000 150 kV HV CB Live Tank Power Transformers X X (x) 2002 132 kV 110 / 20 S/S only X X X X X X 1999 110 kV x x x 2004 161 kV 110 / 20 S/S only X X X X X X 2002 110 kV MV Equipment 11,7 MW MV Cabling Padmount Transfomers 150 S/S only X 2004 150 kV 3 X 1,8 MW x X X X 2001 30 kV A 3,8 MW Enercon E66 Consulting Studies BB Utilities GmbH Seite 1 von 2 150 / 20 20 X 0,600 MW X X X X X 1999 150 kV Control and Protection 132 S/S only13 X 900 kW X X X X X 2004 132 110kV S/S onlyNEG Micon X X X X X X 2004 110 kV 66kV S/S only X X X X X 2005 66 kV 5 X 0,75 MW 110kV S/S onlyNEG Micon X X X X X X 2005 110 kV Year of Order 132kV S/S only X X X X X X 2005 132 kV X X XX XXXX X X X X X X X 2000 110 kV Highest Voltage Level X X XX XXXX X DEUTD / TDX 5 - DW 2003+ ItalyYear of Instal Italianlatio Venton Power Corporation S.r.l. (+ = Year of Order) 2001 Morocco Enercon / Dumez Maroc Al Koudia / Al Baida 2001 Morocco Office National de l'Electricité Modell Windpark 1 1997 Pakistan Southern Electric Power Corporation Raiwind Diesel Power Plant 1 2004 Portugal EnersisCountry Candeeiros Wind Farm 86MW 2005 Spain Sinae Fresno de Veleta Substation 2001 Spain NEG Micon Grisel 2005 Spain Iberinco Las Lomillas 2002 Spain Terranova Energy Corporation SA Parque Eolico La Bobia / San Isidro 1 2006 Spain Hidrocantábrico S/S Wind Farm Belchite 2006 Spain Hidrocantábrico S/S Wind Farm El Boquerón 2000 Sweden Enron Wind GmbH OWP Utgrunden 2001 Sweden NEG Micon OWP Yttre Stengrund 2004 United States Independent Electric Crescent Ridge Customer 2003 United States Crescent Ridge Windfarm Illinios Wind Energy - Tomen 1 2005 United States UPC Wind Management, LLC Kaheawa Windfarm 1 2005 United States Apollo Energy Corporation Pakini Nui Windfarm 2001 United States Woodward Mountain Wind Ranch # 1+2 Renewable Energy Services 1 2001 United States King Mountain Wind Ranch #1 - 3 Renewable Energy Services 1 Reference List PTPS Wind _2005_07_1_for CUSTOMERS_ohne Links.xls / Tabelle1 2002 United States Sacramento Municipal Utility District Natomas 1 2004 United States Renewable Energy Services Sweetwater Windfarm 2004 United States Midamerica Energy / EnXco Wall Lake Wind .) = activities of the former ABB New Ventures GmbH 4 Grid connections to wind power plants Project Druck : 05.07.2005 / 17:05 Number of Substations ( if 4 documented ) AIS Windpark turn-key MVS AIS AIS / Greenfield (turnkey) Type of deliveries Transf./HV-CB EPC, BoP HV CB Live Tank GIS Contr. & Pr. only Contr. & Pr. only Grid Connection 150 / 20 S/S only X X X X X 2001 110kV Voltage Level(s) [ in kV ] and Grid Connection 3,5 MW Power ( if filed ) 22 S/S only X X X X 2000 110kV AIS/Grenfield (turnkey) 132 S/S only X X X 1996 132kV AIS/Greenfield(turnkey) Consulting equipment 60 specification 220kV S/S only X X X X 2004 220kV 7 X 0,5 MW AIS/Greenfield(turnkey) 13,5 MW Turbines + Manufacturer Enercon AIS/Greenfield(turnkey) 50kV / 20kV132kV 49,3 MW X X X 2001 132 kV AIS/Retrofit AIS / Greenfield (turnkey) VESTAS26 V90x 3 MW Windpark Turn-key ( by ABB 18 X 0,75 MW New Ventures (divested )) 33 X 1.5 MW GE NEG Micon X X X X X X X X X X 2000 66kV 50 / 20 Wind Contr. & Pr. only XGrid con 2005nection Turn-key Contr. & Pr. only X 2005 138 S/S only X X X X X X X 2003 138 kV 69 7 X 1,4 MW EPC Enron Wind X X XX XXXX X 5 X2,0 MW Substation Turn key NEG Micon 138 2 X 80MW X X X X X X X X 2001 138 kV X X 2004 60 kV 33 X 1.5 MW X 2004 35KV HV Cabling 138 3 X 80MW X X X X X X X X 2001 138 kV 20 X 1.5MW GE HV Cabling Offshore 230 S/S only X X X X X X X 2002 230 kV 138 S/S only X 2004 138 kV HV Equipment SLE Power Transformers MV Equipment A BB Utilities GmbH Seite 2 von 2 MV Cabling 100 X 1.5 MW X X 2000 50 kV Padmount Transfomers GE Consulting tudies X 2004 132kV S Control and Protection X X X X X X X X 2005 69 kV X 1999 Year of Order Highest Voltage Level X 2004 X 2004 35KV DEABB 1217 05 E ABB AG Note: Power Technology Systems We reserve the right to make technical changes or modify the contents of this document P.O. Box 10 03 51 without prior notice. With regard to purchase orders, the agreed particulars shall prevail. 68128 Mannheim ABB does not accept any responsibility whatsoever for potential errors or possible lack of GERMANY information in this document. Phone: +49 (0) 6 21 381-30 00 We reserve all rights in this document and in the subject matter and illustrations contained Fax: +49 (0) 6 21 381-26 45 therein. Any reproduction - in whole or in parts - is forbidden without ABB's prior written E-Mail: [email protected] consent.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    4 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us