North Central Railway

North Central Railway

NORTH CENTRAL RAILWAY SITAPUR PARLIAMENTARY CONSTITUENCY Uttar Pradesh, the most populous state of Nation is served by North Central Railway along with Northern, North Eastern M. C. Chauhan and East Central Railways. Indian Railways (IR) plays a very General Manager North Central Railway important role in development of the state and provides connectivity for freight and passengers, including international tourists. IR has a history of more than 160 years in the state and has the highest route kilometers - 9100 route kilometers - within it, which is 14% of entire railway network. IR has made Uttar Pradesh proud by giving it Nation's first semi high speed train Gatimaan Express, which initially ran between Agra and Delhi. It has now been extended upto Jhansi with effect from 01.04.2018 - a move that will boost tourism in bundelkhand region of Uttar Pradesh. Efforts for further development of railway infrastructure in Uttar Pradesh have been intensified in last four years with 376% more investment in comparison to previous years. Results of such a massive investment are becoming visible with enhanced infrastructure and modern passenger amenities. Soon the era of congestion and inconvenience will be a matter of past and a new Railway equipped with state-of-the-art facilities will be able to serve the citizens with greater level of satisfaction. The longest stretch of the under construction Eastern Dedicated Freight Corridor i.e. almost 57% of the entire length lies in Uttar Pradesh from Pt. Deen Dayal Upadhyaya Jn. to Ghaziabad. In this brochure, we have compiled the important contributions and achievements of Indian Railways in the development of the SITAPUR constituency of Uttar Pradesh in the last four years. I hope that it will serve as a ready reckoner for those eager to know about the role of Railways in the development of this constituency. It may be noted that the budgets allocated to various projects are not apportioned constituency wise but reflect the cost of the project. INPUTS BY RAILWAY IN SITAPUR PARLIAMENTARY CONSTITUENCY SITAPUR PARLIAMENTARY CONSTITUENCY A. ASSEMBLY SEGMENTS Laharpur, Biswan, Mahmoodabad, Sitapur, Sevata B. WORKS COMPLETED IN LAST FOUR YEARS 1. INFRASTRUCTURAL DEVELOPMENT l Electrification of Sitapur - Burhwal City (101.2 km) at a cost of Rs. 6293 Lakh. l Electrification of Rosa-Sitapur Section (83 km) l NI work of Neri completed & commissioned on 18.06.2016 in connection with Rosa - Sitapur - Two crossing station. l Energy efficient LED lights at stations. Limited Height Subways (LHS) in lieu of l Level Crossing No. 46/C on Saraiyan - Biswan section at a cost of Rs. 180 Lakh. l Level Crossing No. 50/C on Saraiyan - Biswan section at a cost of Rs. 185 Lakh. l Level Crossing No. 55/C on Sidhuli- Kamlapur section at a cost of Rs. 180 Lakh. l Level Crossing No. 60/C on Kamlapur- Baraijalapur section at a cost of Rs. 146 Lakh. l Level Crossing No. 64/C on Baraijalalpur-Khairabad section at a cost of Rs. 91 Lakh. l Level Crossing No. 65/C on Baraijalalpur-Khairabad section at a cost of Rs. 110 Lakh. l Level Crossing No. 69/C on Baraijalalpur-Khairabad section at a cost of Rs. 146 Lakh. l Level Crossing No. 78/C on Sitapur - Jharekhapur section at a cost of Rs. 146 Lakh. l Level Crossing No. 80/C on Sitapur- Jharekhapur section at a cost of Rs. 146 Lakh. l Level Crossing No. 81/C on Sitapur- Jharekhapur section at a cost of Rs. 146 Lakh. l Level Crossing No. 81/C on Persendi-Sitapur Cantt. section at a cost of Rs. 177 Lakh. 2. IMPROVEMENTS IN PASSENGERS AMENITIES Biswan Staion l 02 (Ladies & Gents) Toilet in waiting room at a cost of Rs. 15 Lakh. l Waiting room at a cost of Rs. 15 Lakh. l 05 Ticket Windows at a cost of Rs. 7 Lakh. Sitapur Staion l Train Display Boards at Sitapur, Sitapur Cantt. & Biswan, Mahmoodabad, at a cost of Rs. 8.10 Lakh. l CCTV at Sitapur at a cost of Rs. 50 Lakh. l 10 K Wp Solar panel under installation at Gaurd running room at Sitapur at a cost of Rs. 23 Lakh. Other works l 02 (Ladies & Gents) Hargaon Toilet at Platform at a cost of Rs. 15 Lakh. l Minimum Essential Amenities work completed. D. OTHER DEVELOPMENTS: New Trains introduced with stoppage over Sitapur Constituency l Train No. 14009/14010 Anand Vihar (T) - Bapudham Motihari Weekly Express. l Train No. 15655/15656 Kamakhaya - Katra Weekly Express. l Train No. 22551/22552 Darbhanga - Jalandhar City Weekly Express. l Train No. 22423/22424 Amritsar - Gorakhpur Express. l Train No. 15531/15532 Sahrsa - Amritsar Weekly Jansadharan Express. C. ON-GOING WORKS: l Construction of Limited Height Subway in lieu of Level crossing no. 43 'C' at km. 46/12-13 between Manwa Halt- Sidhauli stations at a cost of Rs. 88.16 Lakh.. l Doubling of Rosa-Sitapur Cantt section. l Construction of Limited height subway on 22 Unmanned Level Crossing. Waiting Hall at Biswan Station Gauge Conversion at Sitapur Passenger Hall at Sitapur Cantt Shelter with Fan at Biswan station with LED Lightings.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    4 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us