Space Shuttle Missions Summary

Space Shuttle Missions Summary

Revision S May 2002 SPACE SHUTTLE MISSIONS SUMMARY Page 111 - STS-95 CREW LANDING SITE/ SSME-TL (7) LAUNCH SITE, RUNWAY, NOM- SRB ORBIT PAYLOAD MISSION HIGHLIGHTS FLT ORBITER LIFTOFF TIME, CROSSRANGE ABORT RSRM FSW WEIGHTS, (LAUNCH SCRUBS/DELAYS, EMERG NO. TITLE, NAMES LANDING SITES, LANDING TIMES THROTTLE AND INC HA/HP PAYLOADS/ TAL WEATHER, ASCENT I-LOADS, & EVA'S ABORT TIMES FLT DURATION, PROFILE ET EXPERIMENTS FIRSTS, SIGNIFICANT ANOMALIES, ETC.) WINDS ENG. S.N. STS-95 OV-103 CDR: KSC 39B KSC 33 (KSC 45) 104.5/104.5/ BI-096 28.45° DIRECT OI-26B CARGO: KSC W / D : OPF 76, VAB 5, PAD 29 = 110 days (Flight 25) Curtis L. Brown 302:19:19:33:98Z 311:17:03:30Z 109% (47) INSERTION (3) 38618 LBS 2:00:00 PM EST (P) 12:03:30 PM EST LAUNCH POSTPONMENTS : SEQ FLT #92 Discovery (Flt 5 - STS-47, STS-66, RSRM 2:19:34 PM EST (A) PAYLOAD - Baselined launch date of 10/8/98 on 7/31/97. STS-77, STS-85) Thursday 28 Saturday 20 PREDICTED: 68 POST OMS -2 : OMS PODS : CHARGABLE: - Postponed launch date to 10/29/98 on 12/18/97. KSC-92 P539/R152/V112/M136 10/29/98 (10) 11/7/98 (11) 100/104.5/ 303 X 295 NM 28520 LBS LPO1 - 28 104.5/67/ ET-98 LAUNCH SCRUBS : None PAD RPO3 - 26 PLT: LAUNCH WINDOW : DEORBIT BURN : 104.5 SEP 1 : DEPLOYED: FRC3 - 25 2H30M CTOB 311:15:52:54Z 125 LBS 39B-39 Steven W. Lindsey SLWT-2 2:23:46:30 LAUNCH DELAYS : (Flt 2 - STS-87) ACTUAL: MET MLP-2 EOM PLS : KSC XRANGE: 172 NM NON - DEPLOYED : - Held for 9 minutes 36 seconds during T-9 minute hold to P540/R229/V131/M200 100/104.5/ SLWT 302.2 X 294 understand the cause of the three master alarms (MA) TAL: BYD ORBIT DIR : DL 44 24108 LBS TAL WX : BEN, MRN 104.5/72/ RPT NM during cabin leak checks. First MA was cabin P reached M / S 1 : AIM PT : NOMINAL 104.5 MAX: MIDDECK: 15.35 psi during cabin leak check. Two MA’s were Stephen K. Robinson SELECTED: 283K SEP 2 : 1314 LBS differential pressure/differential time alarms. It was (Flt 2 – STS-85) RTLS: EDW 15/N/SF MLGTD: 3243 FT 1 = 2048 (1) MIN: 3:06:16:40 concluded that the alarms were expected and count was SHUTTLE P541/R222/V152/M196 TAL: BYD 32/N/SF 311:17:03:30Z 2 = 2043 (2) 215K MET resumed. AOA: EDW 22 VEL: 199 KGS ACCUMULATED - Held for 9 minutes 58 seconds at T-5 minutes for PLS: EDW 22/CI/N 196 KEAS 3 = 2045 (2) WEIGHTS: range safety hold call for two intruder aircraft in Launch M / S 2 : HDOT: -1.0 FPS SLWT TI: DEPLOYED: Danger Area. Resumed count but two calls were made Scott E. Parazynski TDEL: ALL BLOCK IMPACT 5:22:01:37 850155 LBS to hold at T-31 seconds, one for engine 2 pitch position (Flt 3 - STS-66, STS-86) -0.03 -0.108/0.07 TD NORM 205 : II A ENGINES 1:28:02 MET NON - DEPLOYED : NO GO and the second for range safety NO GO. These 2559 FT P542/R187/V145/M164 MET 301.5 X 293.5 1378355 LBS holds were removed before count reached T-31 MAX Q NAV : DRAG CHUTE LAT: NM CARGO TOTAL : seconds; hence, no additional delay. M / S 3 : 755 765 DEPLOY : 20.8°N 2824652 LBS NOT USED TAL WX : Pedro Duque SRB STG : LONG: PERFORMANCE (ESA-Spain) 147.2°W - Banjul, Ben Guerir, and Moron were forecast and 2:03.7 2:03 NLGTD: 6248 FT MARGINS ( LBS ) : observed GO. Banjul was prime and selected. P543/R245/M213 311:17:03:40Z FPR: 3783 PERF: NOMINAL VEL: 164 KGS FUEL BIAS: 720 DOLILU / I - LOADS : FINAL TDDP: 1587 P / S 1 : 164 KEAS - DOLILU II uplink # 23, I-Load uplink # 42. 2 ENG TAL ( BYD ) : HDOT: -6.6 FPS RECON: 2740 Chiaki Mukai 2:11 2:13 (Japan) BRK INIT : 138 KGS PAYLOADS: PERFORMANCE ENHANCEMENTS : (Flt 2 - STS-65) NEG RETURN : 8726 FT PLB: - Standard set plus PE High Q. P544/R181/V153/F23 3:45 3:52 SPACEHAB DRAG CHUTE (Single) FLIGHT DURATION CHANGES : None P / S 2 : PTA ( U / S 500) : JETTISON: HOST NOT USED Senator John H. Glenn (2) 4:12 4:08 SPARTAN–201 FLIGHT RULE WAIVER : 2 (Deploy & Retrieve) - Forecast at deorbit burn time was a maximum P545/R246/M214 DROOP: BRK DECEL FPS : M 3 EOM AVE 5.8 PK 7.8 (Solar Wind Exp.) crosswind of 16 knots. Flight rule limit is 15 knots. 5:21 GAS (2) Observed crosswind < 10 knots. Landed on orbit 135. WHEELS STOP : WEIGHT: IEH-3 (PANSAT) PTM ( U / S 500) : 311:17:04:30Z 228455 LBS (Deployed) FIRSTS / LASTS / RECORDS : 5:13 5:06 12751 FT - First flight using High Q flight design. X CG: MIDDECK: MECO CMD : - First flight with three Block IIA SSME’s (Rocketdyne ROLLOUT: 1076.83 DEORBIT PCG-STES HPFTP). 8:20.7 8:21.6 9508 FT SAREX-II 60 SECS ALT: BRIC - John Glenn’s first flight was Mercury-Atlas 6 on MCC WHITE FCR (22) VI: LANDING: 301.5 X 285.9 2/20/62. 26102 26092 WINDS: NM 5 CYRO TK SETS - Glenn’s age at first flight 40Y7.5M, second flight FLIGHT DIRECTORS : 0H, 10R KTS WEIGHT: 5 GN2 TANKS 77Y4M, 36Y8.5M between flights. A/E - L. J. Ham OMS -2 : OFFICIAL: 228388 LBS VELOCITY - First flight using space-to-space comm system (as 41:57 41:57 0609P14 DTO). LD/O1 - P. L. Engelauf 5.02 FPS 5.02 FPS T0, R9 KTS 26063 FPS O 2 - P. S. Hill X CG: - Second flight of Super Lightweight Tank (SLWT). O 3 - P. F. Dye 1078.45 ENTRY MOD - J. W. Bantle RANGE Continued… Continued… Continued… 4290 NM Revision S May 2002 SPACE SHUTTLE MISSIONS SUMMARY Page 112 - STS-95 CREW LANDING SITE/ SSME-TL (7) LAUNCH SITE, RUNWAY, NOM- SRB ORBIT PAYLOAD MISSION HIGHLIGHTS FLT ORBITER LIFTOFF TIME, CROSSRANGE ABORT RSRM FSW WEIGHTS, (LAUNCH SCRUBS/DELAYS, EMERG NO. TITLE, NAMES LANDING SITES, LANDING TIMES THROTTLE AND INC HA/HP PAYLOADS/ TAL WEATHER, ASCENT I-LOADS, & EVA'S ABORT TIMES FLT DURATION, PROFILE ET EXPERIMENTS FIRSTS, SIGNIFICANT ANOMALIES, ETC.) WINDS ENG. S.N. STS-95 Continued… Continued… Continued… DENS ALT : 965 FT RMS 51 EVENTS : Continued FLT DURATION : (S.N. 201) - SPARTAN-201 release 305:19:00:12Z, 2:23:40:36 8:21:43:56 RMS used for MET. SPARTAN-201 - Due to drag chute anomaly, drag chute was not armed S / T : 790:03:08:16 deploy, retrieve and and deployed. berth, ACVS, - Inert weight adjustment -200 lbs included in STS OPR OV -103 : OSVS, and VGS chargeable. 186:13:31:48 OPS. - SPARTAN capture 307:20:47:49Z, 5:01:28 MET. DISTANCE: Berth 5:01:46 MET. 3,644,459 sm RENDEZVOUS # 43 : - Deployed, separated, rendezvoused with SPARTAN- 201. RADIATOR DEPLOY # 23 - Both port and starboard panels deployed. SIGNIFICANT ANOMALIES : - Low Iodine Residual System (LIRS) large spraying leak. Used backup galley iodine removal system. - Unpleasant taste (rubber hose) from LIRS. - During space-to-space comm tests, no data from EMU 1 in primary. - Drag chute door fell off during ME throttle up at T-5 seconds; hence, not deployed during landing. - Decision made to disable chute for STS-88. - WSB 2 overcooled six times during entry. - SPARTAN ground command problem. - RCS jet L3L failed off, then failed leak..

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us