Allston Yards Public Meeting

Allston Yards Public Meeting

ALLSTON YARDS PUBLIC MEETING April 23, 2018 AGENDA Project Team Timing and Process What We Heard Design Guidelines Conceptual Master Plan Sustainability Transportation Questions & Answers 3 PRESENTERS New England Development John Twohig (Overview) Elkus Manfredi Architects David Manfredi (Design) Vanasse Hangen Brustlin Patrick T. Dunford (Traffic) 4 TIMING AND PROCESS • Letter of Intent Filed: February 10, 2017 • Project Notification Form Filed: January 22, 2018 WHAT WERE YOU DOING? • Consultation with the City • Redefining Transportation Improvements and Timing • 2 Peer Reviews • Redefining “Block” and “Plan” • Meetings with Abutters • New Master Planner • Building a Neighborhood • Phasing - Timing • Listening to the Community 5 WHAT WE HEARD • “Work with your abutters” • “Provide ridership to support the new ‘T-stop’” • “We need more open space – real, programmed open space” • “Be sure you work with the community” • “What are you doing about home ownership?” • “Fix Arthur Street” • “Fix the traffic issues up front” • “How can you make Guest Street connect?” • “Keep the store open, and make it better” • “Be informed by the Guest Street Corridor Study” • “Improve pedestrian bicycle experience” • “Enhance the connectivity between 02134 and 02135” • “Be sure affordable rental and home-ownership are • “Don’t screw this up” in our neighborhood” 6 PNF FILING Filed the PNF ; not an Expanded PNF • Project Description • Environmental • Regulatory Context • Infrastructure • Urban Design • Historic Resources • Sustainability • Transportation 7 PROJECT GOALS Maintain consistency with Guest Street Planning Study Resulting in: • Mixed-use, transit • A range of housing options oriented development • An integral street grid; make Guest • Connect to and build off Street connect to Everett Street Boston Landing success • Substantial community • Existing grocery store space and open space to remain open during construction for the • A 24,000 sf community green neighborhood and employees open to the public • A new, state of the art grocery • Height closer to the store for the community Massachusetts Turnpike 8 PROJECT BENEFITS • Significant,up-front • New 24,000 sf Community transportation infrastructure Green open to the public with improvements year-round programming • Substantial net new • Dedicated community space tax revenue with anticipated healthy eating • New construction and and nutrition programs permanent jobs; At full • Support viability of build-out, estimated Boston Landing station 2,500 construction jobs; by increasing ridership 1,000 permanent jobs • Provide new residents to • Grocery to remain open support existing neighborhood during Phase 1 retail and restaurants • New housing including • Community and ownership opportunities public realm fund • Substantial payments for jobs and housing of approximately $3,000,000 9 AERIAL VIEW BEFORE NEW BALANCE 10 EXISTING AERIAL VIEW MASS PIKE I-90 T EVERETT STREET GUEST STREET Site Data: 461,304 sf (10.6 acres) ARTHUR STREET ARTHUR 100,000 sf Grocery & Retail NORTH BEACON STREET 450 Parking Spaces 11 44GUEST Urban Design Guidelines STREET PLANNING STUDY 2012 LEGEND : ACTIVE EDGE LAND USE ACTIVE-ZONE Antwerp St. Harvard Ave. Braintree St. Everett St. Active Edges Lincoln St. Primary spines within the planning area such as Guest Street, Braintree Street, Arthur Street, and the new east/ west street south of Guest Street – should be lined with Guest St. Arthur St. Cambridge St. active uses to ensure a lively and interesting street level experience for residents, workers, and other visitors. L ife St. Active uses include retail, restaurants, recreation, N. Beacon St. galleries, lobbies, lounges and places where people are Market St. actively working together. Active edges also include residential uses with frequent front doors and front gardens. A block-long building façade with infrequent ACTIVE EDGES: PRIMARY SPINES WILL BE LINED WITH ACTIVE USES. entrances and little transparency is not considered an active edge and is strongly discouraged in the active edge zone. LEGEND : Land Use MIXED-USE WITH PREDOMINATELY COMMERCIAL/OFFICE USE The Study Area will become a mixed-use urban district MIXED-USE Antwerp St. Harvard Ave. providing workplaces, homes and a host of supporting PREDOMINATELY RESIDENTIAL cultural, community, recreational and retail uses that will Braintree St. support a lively, diverse and 18 hour quality of life. Land Everett St. uses will be most mixed along the center spine of the active zone area. Radiating out from this core, the types Lincoln St. of uses will gradually change to blend into the existing adjacent uses surrounding the Study Area. Along the Guest St. Arthur St. Cambridge St. Turnpike, uses will be dominated by workplaces, a more appropriate use along this major traffice corridor. Along L North Beacon Street, uses will be primarily residential ife St. N. Beacon St. with retail and active uses at a few of the intersections Market St. where retail exists today. Land uses on blocks adjacent to existing residential or office uses will appropriately mix in with the uses there today. A MIXED-USE DISTRICT PROVIDING WORKPLACES, HOMES AND CULTURAL, COMMUNITY, RECREATIONAL AND RETAIL USES THAT WILL SUPPORT A LIVELY, DIVERSE AND 18 HOUR QUALITY OF LIFE. SASAKI ASSOCIATES, GLC DEVELOPMENT RESOURCES, CITY OF BOSTON, BPDA 12 GUEST STREET PLANNING STUDY 2012 Urban Design Guidelines 45 DENSITY AND BUILDING HEIGHT LEGEND : Antwerp St. FAR 3.0 - 4.0 HEIGHT VARIATION UP TO 150 FEET (UP TO ~10-13 STORIES) Everett St. Harvard Ave. FAR 1.25 - 3.25 HEIGHT 60-110 FEET (~6-12 STORIES) FAR 0.75- 1.50 HEIGHT 40 FEET (UP TO 4 STORIES) Braintree St. Lincoln St. Arthur St. Guest St. Cambridge St. L ife St. N. Beacon St. Market St. HEIGHT AND DENSITY GUIDELINES ARE PAIRED TO PROMOTE A RICH AND DIVERSE RANGE OF BUILDING FORM AND MASSING. Heights and Density The height and density guidelines for the Study Area Area Ratio (FAR) range of 3.0 to 4.0. As illustrated in the Brighton neighborhoods across North Beacon Street. will allow for an urban scale of development along implementation chapter, this can mean a pattern of long Throughout the Study Area, street walls should not the Turnpike and in the core, while stepping down to 4-6 story buildings that have a larger footprint on the site or exceed 40’ in height. Stepbacks of 15’ at 40’ heights will appropriately meet the existing height of the adjacent 13 story towers that have a smaller footprint. The central ensure a human scale to the streets. These height and neighborhoods. Height and density guidelines are paired zone will have a height limit of 110’ and an FAR of 1.25- density guidelines will result in an overall capacity of 1.5 to promote a rich and diverse range of building form and 3.25 and the blocks along North Beacon Street will have to 2 million square feet of future development. massing. For example, the blocks along the Turnpike a height limit of 40’ and an FAR of 0.75 to 1.5 – gradually have a height limit of 150’ or 10-13 stories and a Floor stepping down in height and density to meet the adjacent SASAKI ASSOCIATES, GLC DEVELOPMENT RESOURCES, CITY OF BOSTON, BPDA 13 SITE CONTEXT 14 SITE CONTEXT The Auerbach Center at New Balance Warrior Ice Arena at Boston Landing 125 Guest Street Residences New Balance World Headquarters Warrior Ice Arena at 125 Guest Street Residences Boston Landing 15 LONG RANGE INFRASTRUCTURE 16 EXISTING GROUND FLOOR PLAN 17 CONTEXT PLAN 18 BUILDING HEIGHTS +210 +205 +235 +200 +195 +200 19 GROUND FLOOR PLAN 20 EXISTING CONDITION EXISTING STOP & SHOP BOSTON LANDING 450 PARKING DEVELOPMENT SPACES NEW MBTA STOP T MASS. PIKE EVERETT ST. NORTH BEACONARTHUR STREET STREET 21 INTERIM CONSTRUCTION BUILDING 1 EXISTING STOP & SHOP REMAINS OPEN BUILDING 1: UNDER CONSTRUCTION MASS. PIKE EVERETT ST. NORTH BEACONARTHUR STREET STREET 22 BUILDING 1 FUTURE FUTURE BUILDING 4 BUILDING 2 COMMUNITY GREEN TEMPORARY SURFACE PARKING MASS. PIKE 128’ GUEST STREET EXTENSION 1 200’ 16ST 44’ EVERETT ST. NORTH BEACONARTHUR STREET STREET 23 FULL BUILD-OUT 4 210’ 14ST MASS. PIKE 3 235’ 20ST 70’ 36’ 128’ 24’ 2 70’ 1 200’ 100’ 200’ 17ST 16ST 44’ 100’ 45’ EVERETT ST. NORTH BEACONARTHUR STREET STREET 24 LANDSCAPE PRECEDENT 25 WEST STREET VIEW 26 EAST STREET VIEW 27 VIEW OF THE COMMUNITY GREEN Areas • Passive and active • Lawn • Pavilion and Outdoor Seating • Shaded Pergola Programming • Gathering space for Community groups and organizations • Uses include food trucks, art festivals, music events, movie nights, etc. • Professionally managed 28 SUSTAINABILITY • Redevelopment of a previously • Reduced demand for potable water: developed site • Efficient irrigation systems and high efficiency domestic fixtures • Transit oriented development • Sustainable construction practices • LEED v4 certifiable and is Article 37 compliant • Environmentally conscious materials and products • Resiliency measures incorporated: • Natural ventilation in residential units • Stop & Shop sustainability goals: • Buried utilities • Heat reclaim system to utilize waste heat from refrigeration systems • Alternative Energy approaches will be • Food that is unable to be donated studied with each development component is diverted from landfills and sent • Photovoltaic arrays to an anaerobic digester • Combined heat and power systems for residential buildings • Energy efficiency measures: • High performance envelopes and mechanical systems • Reduced lighting power density • Energy Star rated appliances 29 TRANSPORTATION Summary of Key Findings and Benefits: • Proposed improvements

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    44 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us