Queens Boulevard 73Rd St to Eliot Ave

Queens Boulevard 73Rd St to Eliot Ave

QUEENS BOULEVARD 73RD ST TO ELIOT AVE Great Streets Capital Community Board 4 September 2019 QUEENS BOULEVARD SAFETY GAINS • Pedestrian injuries decreased by 41% after implementation • Total injuries decreased by 22% after implementation nyc.gov/visionzero 2 VISION ZERO GREAT STREETS Vision Zero • Multi-agency effort to reduce traffic fatalities in New York City • Borough Pedestrian Action Plans released in 2015 and 2019 • Queens Blvd is a Priority Corridor with 6.4 pedestrians killed or severely injured per mile with 7 Priority Intersections and in a Priority Area • Community Board 4 is a Bicycle Priority District identified in the 2017 Safer Cycling report Great Streets • Queens Blvd is one of four arterial streets designated city funds as part of this Vision Zero Capital Program by Mayor de Blasio in 2015 • Atlantic Ave and 4th Ave in Brooklyn and the Grand Concourse in the Bronx were also named Great Streets nyc.gov/visionzero 3 PROJECT LIMITS QN CB 4 QN CB 2 St rd 73 QN CB 5 QN CB 6 nyc.gov/visionzero 4 OPERATIONAL & CAPITAL PROJECT TIMELINE • March 2015: Great Streets Capital Program announced • July 2015 – October 2015: Operational Project Phase I implementation (CB 2) • November 2015: Operational Project Phase II Safety Workshop • Fall 2015: Street Ambassador outreach on street, with stakeholders, & at Queens Center Mall • March 2016: Briefing with Elected Officials • March 2016: Presentation to CB 4 Transportation Committee on Operational Project Phase II • May 2016: Presentation to CB 4 Full Board on Operational Project Phase II • July 2016 – December 2016: Operational Project Phase II implementation • 2017 - 2019: Operational Project evaluation and Capital Project planning • September 2019: Capital project notification to Community Board 4 • October 2019: Receive Community Board 4 feedback within 30 days of presentation • Fall 2022: Construction tentatively scheduled to begin on Queens Boulevard Capital Project Phase II nyc.gov/visionzero 5 OPERATIONAL PROJECT: DESIGN Protected bicycle lane and pedestrian path Mall-to-mall crossings Median tip extensions Stop-controlled slip lanes nyc.gov/visionzero 6 OPERATIONAL PROJECT: CYCLING GROWTH • Average total cycling volumes increased 45% • Average weekday cycling volumes increased 47% • NYC DOT’s Big Jump will bring various bike connectors to Queens Blvd to help further increase cycling Average Bicycle Volumes by Intersection 500 471 472 450 400 339 350 310 300 250 200 150 100 50 0 51 Ave 54 Ave - 55 Ave Before After Before data: Average of counts collected 7/15 & 4/16. After data: Average of counts collected 5/17, 8/17, 4/18, and 8/18 nyc.gov/visionzero 7 QUEENS BOULEVARD PROJECT DESIGNS BEFORE BEFORE OPERATIONAL – SUMMER 2016 OPERATIONAL GREAT STREETS - 2021 CAPITAL nyc.gov/visionzero 8 GREAT STREETS CAPITAL: GOALS • Continue safety improvements for all users on Queens Blvd • Complete the pedestrian network to improve access across and between neighborhoods • Upgrade cycling and walking facilities to create a linear green space • Install greenery and streetscape amenities to enhance livability for residents • Improve bus service and connections to transit • Expand upon operational project design based on community feedback and data analysis nyc.gov/visionzero 9 GREAT STREETS CAPITAL: VISION BEFORE nyc.gov/visionzero AFTER10 GREAT STREETS TYPICAL: BEFORE 55 Ave 55 Rd nyc.gov/visionzero 11 GREAT STREETS TYPICAL: OPERATIONAL Painted median tip extensions Painted bike path and tighten intersections, provide pedestrian path alongside additional refuge, and shorten median provide safe amenities pedestrian crossing distances 55 Ave Addition of mall to mall Removal of highway crossings enhance like merge to slower, pedestrian connectivity safer stop controlled slip lane 55 Rd nyc.gov/visionzero 12 GREAT STREETS TYPICAL: CAPITAL Construct raised median- Reconstruct and expand service road side bicycle lanes with medians with pedestrian walkway, mountable curb greenery, and streetscape amenities Updated slip design improves visibility for drivers Enhance bus operations by relocating Q60 bus stops from curb to median, provide additional amenities at bus stops, and add parking in old bus stop nyc.gov/visionzero locations curbside 13 CRITICAL INTERSECTION 51ST AVE: BEFORE nyc.gov/visionzero 14 CRITICAL INTERSECTION 51ST AVE: OPERATIONAL Mall-to-mall crossings Bike and pedestrian path installed installed on median Painted median tips installed Despite 46% reduction in injuries post operational project, 51st Ave’s width and long crossing distances continue to pose problems for drivers, cyclists, and pedestrians nyc.gov/visionzero 15 CRITICAL INTERSECTION 51ST AVE: CAPITAL New median side bus stops including amenities - shelters, benches, leaning Curb extensions shorten bars and bike racks pedestrian crossing distances Expanded center Realignment of medians provide ADA crosswalks and compliant pedestrian extensions of refuge median tips tighten Curb extension shortens intersection and pedestrian crossing shortens crossing distances distances nyc.gov/visionzero 16 CRITICAL INTERSECTION WOODHAVEN BLVD: BEFORE 59 Ave nyc.gov/visionzero 17 CRITICAL INTERSECTION WOODHAVEN BOULEVARD: OPERATIONAL Bus stops with dedicated bus lanes installed Two way bike connection Bike path installed on adjacent to Queens installed via Woodhaven median Center Mall Blvd bridge and south service road 59 Ave Signalized slip lane due to high volumes accessing L.I.E. Capital project provides an opportunity to make substantial improvements at a complex Blvd Woodhaven intersection with challenging infrastructure and heavy vehicle nyc.gov/visionzero and pedestrian volumes 18 CRITICAL INTERSECTION WOODHAVEN BOULEVARD: CAPITAL Continue pedestrian Bus stops remain on the Maintain consistent number of connections and linear service road to maintain travel lanes on northbound park to Woodhaven Blvd direct access to subway Woodhaven Blvd to improve turns and Queens Center Mall onto Queens Blvd Expanded curb serves Lengthened slip lane as potential site for art provides additional installation that will be capacity for vehicles presented separately to CB 4 by NYC DCA Improve two way bike path connection via bridge and south service road, provides fastest, safest route for cyclists nyc.gov/visionzero 19 QUEENS BOULEVARD CAPITAL: NEW BUS STOP LOCATIONS Van Loon St Van • All changes to bus operations have been coordinated with MTA • Design aligns with the goals of the MTA Queens Network re- design, and will be included in the final plan Existing Q60 Bus Stop (to be released April 2020) Proposed Q60 Bus Stop nyc.gov/visionzero 20 BENEFITS OF GREAT STREETS CAPITAL • Expand and upgrade cycling & pedestrian facilities to • Install public art and streetscape amenities, create linear green space & access between including: benches, lighting, wayfinding signage, and neighborhoods bicycle racks • Provide approximately 60,000 sq ft of trees & greenery • Upgrade curbs to accommodate all users & meet ADA (to be maintained by DOT contractor) requirements • Improve bus service & connections to transit • Add approx. 26 parking spaces curbside to accommodate vehicle parking (in former bus stops) • Install more shelters & benches to create more comfortable bus stops for transit riders • Repave roadway to improve street quality & drainage • Expand and improve upon safety gains made in the operational project nyc.gov/visionzero 21 THANK YOU! NYCDOT nyc_dot nyc_dot NYCDOT nyc.gov/visionzero 22.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    22 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us