VIETNAM WESTBOUND RAIL CORRIDORS Joint OSJD/FIATA

VIETNAM WESTBOUND RAIL CORRIDORS Joint OSJD/FIATA

Vietnam Logistics Business Association - VLA VIETNAM WESTBOUND RAIL CORRIDORS Joint OSJD/FIATA Workshop on combined transport “New possibilities of Europe – Asia – Europe multimodal transportations” Istanbul, 11-12 July’2018 AGENDA ❖ BRIEF OVERVIEW OF VIETNAM LOGISTICS ➢ About Vietnam Logistics Association ➢ Vietnam Logistics Current Status & Development ➢ Cross Border Transport Opportunities ➢ Established Cross Border Transport Network ❖ VIETNAM RAILWAYS OVERVIEW: ➢ Vietnam Rail Current Status ➢ Main rail routes ❖ VIETNAM-CHINA RAIL-LINK AND BEYOND ➢ International Routes to/via China ➢ Cross Border Networks to Central Asia and Europe ➢ Sea-Rail Link Paul Dao Trong Khoa ❖ RECOMMENDATIONS Vice President of VLA Vietnam Logistics Business Association - VLA Connecting Logistics Professionals ● Vietnam Logistics Business Association - VLA Vision: Connecting and cooperating ○ Established in 18 November 1993, formerly with local and foreign freight Vietnam Freight Forwarders Association (VIFFAS) forwarders, logistics services providers ○ Renamed Vietnam Logistics Business Association in order to create the leading industry (VLA) on 4 January 2013 to reflect new industry of Vietnam trend ○ National Association Member of FIATA: active member, participating in various working groups Mission: To enhance the ● 360+ members (80 are members of FIATA) professionalism, to promote the ○ Freight Forwarding modern logistics, to integrate the ○ Transport (sea, air, land, inland waterway) national logistics with the region and ○ Integrated Logistics (3PL) globally in order to efficiently contribute ○ Warehousing, Ports, Stevedoring, Distribution into the development of enterprises in ○ Customs Brokerage the industry as well as the country’s ○ Delivery Services economics development in Vietnam ○ Others Logistics Related Services ● Website: www.vla.com.vn Vietnam Logistics Current Status & Development Cross Border Transport Growing Opportunities ❖ Strategic location of Vietnam with ASEAN, gateways for AEC ❖ One Belt and One Road Initiative with Maritime Silk Road connect ASEAN gateways ❖ AEC establishment as of 31-Dec-2015, ASEAN-China connectivity, growing trade within the region ❖ Fast growth of land transport in Asia - Pacific region with CARG 8.3% in 2014-2019 ❖ Road transport networks connect major cities. Connectivity of industrial hub cities Singapore, Penang, Bangkok, Hanoi, Shenzhen with frequent cargo exchange ❖ Growing of Cross Border eCommerce Cross Border Transport Networks by Roads with ASEAN/GMS+ Guiyang Hongkong Haiphong 2 days 3 days Hoàng Sa Trường 2 day Sa 1 days Main Transport Mode Market Shares 2016 2020 Road 77.20% 54.4% Domestic 17.14% 32.4% Waterborne Rail 0.42% 4.3% Air 0.02% Sea 5.22% National conference on logistics improvement (hosted by Prime Minister on 16-Apr-2018) ● Promote connectivity between modes of transports ● Restructure market share of different modes of transport, with more focus on domestics waterborne and rail as measure to reduce logistics cost ● Modernize rail system, increase throughput of rail volume ● Implementation of railway project with incomplete segments within Vietnam (Singapore-Kunming via Vietnam) ● Upgrade/Newly build of Lao Cai - Hanoi - Haiphong to connect Haiphong port (Lach Huyen deep sea ports) with Kunming/China Vietnam Railways System Overview Bottom-necks: ● Low rail density (9.5km / 1000km2) ● Total cost is high due to lack of connectivity ● Old equipment (64% >20 years), low loading capacity (28-34 ton), heavy wagon (more than 40% payload, high power consumption (accounts for more than 31%) ● Low handling capacity of rail terminals ● No connection to ports (Haiphong old port with rail-link has relocated) ● Different rail gauge between Vietnam and China, especially in Haiphong - Hanoi - Lao Cai route to connect to Kunming North - South Line (1726km) Rail Monday Tuesday Wednes Thursda Friday Saturda Sunday day y y RASY 1 Hanoi – HCM x xx x xx x xx x RASY 2 HCM - Hanoi x xx x xx x xx x RA4506 Hanoi – Nam x x x x x x x Ninh RA24507 Nam Ninh - x x x x x x x Hanoi Routes Number of container Gauge Width HCM - Hanoi (Daily+) 21 1000 Hanoi –-Nanning (Daily) 25 1435 China – Kazakhstan 41-45 1435 Kazakhstan - Germany 45 – 50 1520 Bottom-necks: ● Different rail gauge between Vietnam (1000mm) and China (1435mm), especially in Haiphong - Hanoi - Lao Cai route to connect to Kunming. ● Vietnam has plan to upgrade, but on China side, there’re still 7km rail tracks to be upgrade from 1000mm to 1435mm International Railways Routes to/via China Kunming, Nanning, China Railway China Nanning/Dong Dang- Yen Vien ( Hanoi) Kunming- Hekou/ Lao cai- Yen Vien( Hanoi) Transport lead Departure Station Arrival Station time (days) Nanning 2 Hanoi Chongqing 7 Chengdu 8 Cross-border railway network Sources: RATRACO JSC Routes Number of Gauge Width container HCM - Hanoi (Daily+) 21 1000 Hanoi –-Nanning (Daily) 25 1435 China – Kazakhstan 41-45 1435 Kazakhstan - Germany 45 – 50 1520 Route: Hanoi– Central Asia/Europe (Almaty/Moscow/Duisburg) Moscow Duisburg Urumqi Almaty Transport Departure Estimated Arrival Station lead time Station Cost (days) Vietnam Sources: RATRACO JSC Documentations - SOP Sources: RATRACO JSC Sea-Rail Blocktrain Services Transit time: Vietnam to Poland: 21-23 days Vietnam to Russia: 25 days Vietnam to Mid-Asia: 20 days Vietnam to Mongolia: 20 days Sources: SER - CNTRANS Benefits of Rail Services Vietnam-Poland by Rail: 21~23Days Vietnam-Gdynia/Gdansk:36~44Days Sources: SER - CNTRANS Origin Containers Lodz Nuremburg/ Tilburg Malaszewicze Duisburg (via Chengdu) (via Chengdu) (via Chongqing) (via Chongqing) Haiphong SOC 4400 4700 5500 5800 COC - transload 4600 4900 6000 6300 COC - direct 5000 5300 6300 6600 Transit time 23 days 25-28 days 22 days 23-25 days Especially Good replacement for Sea-Air Service via Dubai Thank you Paul Dao Trong Khoa Vice President of VLA [email protected] www.vla.com.vn CONNECTING LOGISTICS PROFESSIONALS www.vla.com.vn.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    18 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us