
Date: 09/08/2021 CLARE COUNTY COUNCIL TIME: 9:38:33 AM PAGE : 1 P L A N N I N G A P P L I C A T I O N S FURTHER INFORMATION REQUESTED FROM 26/07/2021 To 30/07/2021 FILE APPLICANTS NAME APPN. APP. DEVELOPMENT DESCRIPTION F.I. REQUEST NUMBER AND ADDRESS RECEIVED TYPE AND LOCATION DATE 21/555 Adrian Dooley 02/06/2021 P to erect a dwelling house, garage, driveway, install an 26/07/2021 c/o Michael O'Brien effluent treatment system and polishing filter and all Tinarana associated site works Killaloe Co Clare V94 R718 Millpool Road Mountshannon Co Clare 21/568 L Moloney 02/06/2021 P to extend existing premises, to include new dwelling house 26/07/2021 c/o Martin Tubridy and upgraded sewerage system Cooraclare Cloonbooly Co Clare Connolly Co Clare 21/574 Dave Tuohy 03/06/2021 P for the following development a) demolish existing rear 27/07/2021 c/o Diarmuid Keane & extension to dwelling house and detached garage; b). Associates construct new extension to house with attached garage; c). O'Curry Street Kilkee all associated site works and ancillary services Co Clare Seaside Cottage Seafield, Quilty, Co Clare 21/576 The Board of Management 04/06/2021 P the development will consist of; (i) Construction of a new 28/07/2021 Gaelcoil Donncha Rua single storey Primary School (1,318m2), new internal road c/o Elaine Casey with set-down area and car parking, covered bicycle Healy Partners Architects The Mill parking and entrance gate, new site boundaries, hard play Glentworth Street, Limerick area, landscaping and a V94 F3X9 Bothar Linne Tullyvarraga Shannon Co Clare Date: 09/08/2021 CLARE COUNTY COUNCIL TIME: 9:38:33 AM PAGE : 1 P L A N N I N G A P P L I C A T I O N S FURTHER INFORMATION REQUESTED FROM 26/07/2021 To 30/07/2021 21/579 Michael Brassil 04/06/2021 P to (a) Demolish existing substandard house and roadside 28/07/2021 c/o David H. Leahy lean-to shed. (b) Construct a new replacement dwelling Architects house, new driveway, new replacement waste-water No. 1 Riverpoint Lower Mallow Street treatment system, upgrade entrance from public road and LImerick all associated site works Carrowkilla Ballynacally Co. Clare V95 Y89T 21/580 Tulla GAA Club 04/06/2021 P to change the design of the spectator stand previously 28/07/2021 c/o Mark Quinn approved under Planning Ref. P17/880 and all associated Laharden site works O'Callaghans Mills Co. Clare V94 YA36 Knockadoon Tulla Co. Clare 21/582 P Fitzpatrick 04/06/2021 O to erect 6 no. dwellings, foul sewer treatment plants, 28/07/2021 c/o M Tubridy percolation areas and new site entrance Cooraclare Knockerra West Co. Clare V15 XN77 Kilrush Co. Clare 21/590 Donal Conheady 08/06/2021 P to construct a Private Dwelling House, Wastewater 29/07/2021 Toonagh Treatment System / Soil Polishing Filter, Entrance and all Tulla associated site works Co Clare Toonagh Tulla Ennis Co Clare 21/593 Josh Lennon 09/06/2021 P to erect a dwelling house, entrance, driveway, install an 30/07/2021 c/o Michael O'Brien effluent treatment system and polishing filter and all Rahenabeg associated site works Date: 09/08/2021 CLARE COUNTY COUNCIL TIME: 9:38:33 AM PAGE : 1 P L A N N I N G A P P L I C A T I O N S FURTHER INFORMATION REQUESTED FROM 26/07/2021 To 30/07/2021 Ogonnelloe Bealkelly Co Clare Ogonnelloe Co Clare 21/595 Gerard Blake 09/06/2021 R to RETAIN the as constructed foundation for a machinery 30/07/2021 c/o Diarmuid Keane & shed and planning PERMISSION to complete the Associates Ltd construction of the machinery shed along with all O'Curry St Kilkee associated site works and services Co Clare Killard Doonbeg Co Clare 21/596 Francis O'Reilly 09/06/2021 P to construct a new dwelling house and garage complete 30/07/2021 c/o Padraig Hogan with a new entrance, sewage treatment system and Newhall ancillary works Tiermaclane Ennis Co Clare Ballynacally Ennis Co Clare 21/602 Patrick Conlon 10/06/2021 P to construct dwelling house, garage, bored well, waste 30/07/2021 c/o Michael Begley water treatment system, percolation area, entrance and all Clonlara associated site works Co Clare Doonass Clonlara Co Clare *** CONTROL REPORT *** Approval : 0 Extension of Duration : Date: 09/08/2021 CLARE COUNTY COUNCIL TIME: 9:38:33 AM PAGE : 1 P L A N N I N G A P P L I C A T I O N S FURTHER INFORMATION REQUESTED FROM 26/07/2021 To 30/07/2021 0 Outline : 1 Permission : 10 Retention : 1 Permission Consequent : 0 Temporary : 0 12 *** END OF REPORT *** .
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages4 Page
-
File Size-