SPECIFICATIONS PROJECT NO: 24-4704-18083 Renovation of the DHQ Warehouse El Paso District Headquarters El Paso District 24, El Paso County 13301 GATEWAY WEST EL PASO, TX 79928-5410 ISSUE FOR CONSTRUCTION DESIGN SUBMITTAL 16 OCTOBER 2018 This page was intentionally left blank. RENOVATION of the WAREHOUSE EL PASO DISTRICT HEADQUARTERS EL PASO DISTRICT – 24, EL PASO COUNTY PROJECT NO. 24-4704-18083 SPECIFICATIONS INDEX DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 00 00 02 Index of Drawings 00 00 10 Specifications Index BALANCE OF DIVISION 00 BY TxDOT DIVISION 01 - GENERAL REQUIREMENTS 01 10 00 Summary of Work 01 20 00 Price and Payment Procedures 01 30 00 Administrative Requirements 01 33 00 Submittal Procedures 01 40 00 Quality Requirements 01 40 10 Testing Laboratory Services 01 60 00 Product Requirements 01 63 00 Substitutions and Product Options 01 70 00 Execution and Closeout Requirements 01 73 10 Cutting and Patching DIVISION 02 - EXISTING CONDITIONS 02 41 19 Selective Demolition 02 82 00 Asbestos Abatement Texas Department of Transportation Asbestos Survey Report El Paso DHQ Warehouse Remodel Building 248015, dated August 8, 2018 DIVISION 03 – CONCRETE 03 30 00 Cast-In-Place Concrete Specifications Index Page 1 Renovation of the DHQ Warehouse El Paso District Headquarters El Paso District 24, El Paso County Project No: 24-4704-18083 DIVISION 04 - MASONRY 04 20 00 Unit Masonry DIVISION 05 - METALS 05 50 00 Metal Fabrications DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES 06 10 00 Rough Carpentry DIVISION 07 - THERMAL AND MOISTURE PROTECTION 07 21 00 Thermal Insulation 07 21 30 Sprayed Foam Insulation – Closed Cell 07 54 23 Thermoplastic-Polyolefin (TPO) Roofing 07 62 00 Sheet Metal Flashing And Trim 07 84 00 Firestopping 07 92 00 Joint Sealants DIVISION 08 - OPENINGS 08 11 13 Hollow Metal Doors And Frames 08 14 16 Flush Wood Doors 08 41 13 Aluminum-Framed Entrances And Storefronts 08 62 23 Tubular Skylights 08 71 00 Door Hardware 08 80 00 Glazing DIVISION 09 - FINISHES 09 29 00 Gypsum Board 09 51 23 Acoustical Ceilings 09 65 00 Resilient Flooring and Accessories 09 90 00 Painting DIVISION 10 - SPECIALTIES 10 44 00 Fire Protection Specialties DIVISION 11 – EQUIPMENT None In This Project Renovation of the DHQ Warehouse El Paso District Headquarters El Paso District 24, El Paso County Project No: 24-4704-18083 DIVISION 12 - FURNISHINGS 12 21 13 Horizontal Louver Blinds DIVISION 13 - SPECIAL CONSTRUCTION None In This Project DIVISION 14 - CONVEYING EQUIPMENT None In This Project DIVISION 21 - FIRE SUPPRESSION None In This Project DIVISION 22 - PLUMBING None In This Project DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) 23 05 93 Testing, Adjusting, And Balancing For HVAC 23 07 13 Duct Insulation 23 11 23 Facility Natural-Gas Piping 23 31 13 Metal Ducts 23 74 16.11 Packaged, Small-Capacity, Rooftop Air-Conditioning Units 23 81 29 Ductless Mini-Split Systems DIVISION 26 - ELECTRICAL 26 05 19 Low-Voltage Electrical Power Conductors And Cables 26 05 23 Control-Voltage Electrical Power Cables 26 05 29 Hangers And Supports For Electrical Systems 26 05 33 Raceways And Boxes For Electrical Systems 26 05 44 Sleeves And Sleeve Seals For Electrical Raceways And Cabling 26 05 53 Identification For Electrical Systems 26 05 73.19 Arc-Flash Hazard Analysis 26 09 23 Lighting Control Devices 26 09 43 Network Lighting Controls 26 24 16 Panelboards 26 27 26 Wiring Devices 26 28 16 Enclosed Switches And Circuit Breakers 26 51 19 LED Interior Lighting 26 52 13 Emergency And Exit Lighting Renovation of the DHQ Warehouse El Paso District Headquarters El Paso District 24, El Paso County Project No: 24-4704-18083 DIVISION 27 - COMMUNICATIONS 27 05 28 Pathways For Communications Systems 27 05 29 Hangers And Supports For Communications Systems 27 05 44 Sleeves And Sleeve Seals For Communications Pathways And Cabling 27 05 53 Identification For Communications Systems 27 11 16 Communications Racks, Frames, And Enclosures 27 15 13 Communications Copper Horizontal Cabling DIVISION 28 - ELECTRONIC SAFETY AND SECURITY 28 13 00 Security System 28 46 21 Fire-Alarm Systems DIVISION 31 – EARTHWORK None In This Project DIVISION 32 - EXTERIOR IMPROVEMENTS None In This Project DIVISION 33 - UTILITIES None In This Project END OF DOCUMENT This page was intentionally left blank. RENOVATION of the WAREHOUSE EL PASO DISTRICT HEADQUARTERS EL PASO DISTRICT – 24, EL PASO COUNTY PROJECT NO. 24-4704-18083 INDEX OF DRAWINGS GENERAL SHEETS: G1.1 COVER SHEET G1.2 PROJECT SYMBOLOGY G1.3 ABBREVIATIONS G1.4 ABBREVIATIONS G1.5 ABBREVIATIONS CIVIL: NONE IN THIS PROJECT DEMOLITION: DA2.1 ARCHITECTURAL DEMOLITION PLAN – AREA K DF2.1 FIRE ALARM DEMOLITION PLAN – AREA K DM2.1 HVAC DEMOLITION PLAN – AREA K DE2.1 ELECTRICAL DEMOLITION FLOOR PLAN – AREA K ARCHITECTURAL: A2.1 FLOOR PLAN – AREA K A3.1 ROOF PLAN – AREA K A3.2 ROOF DETAILS – AREA K A4.1 REFLECTED CEILING PLAN – AREA K A4.2 REFLECTED CEILING DETAILS – AREA K A5.1 PARTIAL EXTERIOR ELEVATIONS – AREA K A8.1 WALL SECTIONS – AREA K A8.2 WALL SECTIONS – AREA K A9.1 FINISH SCHEDULE – AREA K A9.2 DOOR AND WINDOW SCHEDULES – AREA K A9.3 DOOR AND WINDOW DETAILS – AREA K A9.4 WINDOW DETAILS – AREA K A10.1 MISCELLANEOUS DETAILS FS1.1 LIFE SAFETY PLAN – AREA K FS1.2 BUILDING CODE ANALYSIS – AREA K F2.1 FIRE ALARM INSTALLATION PLAN – AREA K STRUCTURAL: NONE IN THIS PROJECT Index of Drawings Page 1 Renovation of the DHQ Warehouse El Paso District Headquarters El Paso District 24, El Paso County Project No: 24-4704-18083 MECHANICAL: M1.1 HVAC LEGEND AND NOTES M2.1 HVAC INSTALLATION PLAN – AREA K M2.2 GAS AND CONDENSATE PIPING – AREA K M4.1 HVAC DETAILS I M4.2 HVAC DETAILS II M4.3 HVAC DETAILS III M5.1 MECHANICAL SCHEDULES M5.2 HVAC CONTROLS AND SEQUENCE OF OPERATIONS PLUMBING: NONE IN THIS PROJECT ELECTRICAL: E1.1 ELECTRICAL LEGENDS AND NOTES E2.1 ELECTRICAL LIGHTING PLAN – AREA K E2.2 ELECTRICAL INSTALLATION PLAN – AREA K E2.3 ELECTRICAL SYSTEMS PLAN – AREA K E4.1 ELECTRICAL DETAILS E5.1 ELECTRICAL SCHEDULES END OF LIST OF DRAWINGS Index of Drawings Page 2 This page was intentionally left blank. Renovation of the DHQ Warehouse El Paso District Headquarters El Paso District 24, El Paso County Project No: 24-4704-18083 SECTION 01 10 00 SUMMARY OF WORK PART 1 - GENERAL 1.1 SECTION INCLUDES A. Project Identification B. Contract description C. Work by the Texas Department of Transportation (Owner) D. Work by Others E. Owner supplied products F. Contractor's use of site and premises G. Owner occupancy H. Specification Conventions I. Contractor 1.2 PROJECT IDENTIFICATION TEXAS DEPARTMENT OF TRANSPORTATION EL PASO DISTRICT 24, EL PASO COUNTY Warehouse – 248015 El Paso District Headquarters 13301 Gateway Blvd. West, El Paso, TX 79928-5410 1.3 CONTRACT DESCRIPTION A. Work of the Project includes construction of new office space. 1. Demolition: Interior wall, doors, window, roof top units. 2. Construction: New work area, new HVAC, new electrical, data and security, new walls, new doors, new finishes, etc. 3. Refer to drawings for locations. B. Perform Work of Contract under Lump Sum Total cost contract with Owner in accordance with Conditions of Contract. Summary of Work 01 10 00 - 1 Renovation of the DHQ Warehouse El Paso District Headquarters El Paso District 24, El Paso County Project No: 24-4704-18083 1.4 WORK BY OWNER A. Owner reserves the right to conduct minor work with its forces or separate contractors during the execution of Work of this Contract. 1.5 WORKS BY OTHERS A. Owner reserves the right to award contracts in connection with other portions of the Project under these or similar contract conditions. The Contractor shall cooperate with TxDOT, other contractors, utility providers, governmental/regulatory agency representatives, etc. whose work operations are directly or indirectly impacted by the execution of the Work. B. Owner furnished and Owner Installed furniture. Contractor to make final Electrical/Data connections 1.6 OWNER SUPPLIED PRODUCTS A. Furniture. 1.7 CONTRACTOR'S USE OF SITE AND PREMISES A. Access to Site: Contractor will have unrestricted access to site during hours of operation- 7:00 a.m. to 6:00 p.m., unless other arrangements are made with Owner. B. The trash dumpster may be placed as directed by TxDOT. C. Contractors’ employees may park personal and company vehicles on site as directed by TxDOT. D. Construction Limit: Limited to area as noted on the drawings. 1.8 OWNER OCCUPANCY A. The Owner will occupy the premises, outside the construction limits, during the entire period of contract work. B. Cooperate with Owner to minimize conflict, and to facilitate Owner's operations. 1.9 SPECIFICATION CONVENTIONS A. These specifications are written in imperative mood and streamlined form. This imperative language is directed to the Contractor, unless specifically noted otherwise. The words “shall be” are included by inference where a colon (:) is used within sentences or phrases. Except where specifically intended otherwise, the subject of all imperative statements is the Contractor. For example, 'Provide tile' means 'Contractor shall provide tile.' Summary of Work 01 10 00 - 2 Renovation of the DHQ Warehouse El Paso District Headquarters El Paso District 24, El Paso County Project No: 24-4704-18083 2.0 CONTRACTOR A. Permits and Fees: No City permits will be required as the work of this contract is on State property. All inspections at site will be conducted by TxDOT staff. B. Codes: Comply with applicable codes and regulations of authorities having jurisdiction. Primary code is the International Building Code, latest version. Refer to drawings for a list of applicable codes.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages488 Page
-
File Size-