World Bank Document

World Bank Document

GUANG'AN XINHONG INVESTMENT HOLDINGS Public Disclosure Authorized CO., LTD. GUANG'AN WORLD BANK LOAN MEDIUM- TERM ADJUSTMENT PROJECT - QIANFENG SUBPROJECT Public Disclosure Authorized ENVIRONMENTAL IMPACT REPORT FORM (REVIEW VERSION) Public Disclosure Authorized ANHUI SIWEI ENVIRONMENTAL ENGINEERING CO., LTD. AUGUST 2018 Public Disclosure Authorized SICHUAN PROVINCE CONSTRUCTION PROJECT ENVIRONMENTAL IMPACT REPORT FORM Construction Project Name: Guang'an World Bank Loan Medium-Term Adjustment Project - Qianfeng Subproject Construction Unit (stamp): Guang'an Xinhong Investment Holdings Co., Ltd. Preparation Time: August 2018 Sichuan Environmental Protection Bureau October 1999 2 Explanation of the preparation of the Construction Project Environmental Impact Report Form The Construction Project Environmental Impact Report Form is prepared by a unit that has qualifications for environmental impact assessment work. 1. Project name - refers to the name of the project approval, should not exceed 30 words (two fields for a Chinese character in English). 2. Construction site - refers to the detailed address of the project location, roads and railways should fill in the starting and ending locations. 3. Industry category - filled in by national standard. 4. Total investment - refers to the total investment of the project. 5. Main environmental protection targets - refers to a concentrated residential area, schools, hospitals, cultural relics, scenic spots, water sources and ecological sensitive points within a certain scope around the project area. The protection objectives, nature, scale and distance from the factory should be given as much as possible. Distance and so on. 6. Conclusions and Suggestions - Give the analysis conclusions of clean production, emission standards and total amount control of the project, determine the effectiveness of pollution prevention measures, explain the impact of the project on the environment, and give clear conclusions on the environmental feasibility of the construction project. Other suggestions for reducing environmental impact are also presented. 7. Pre-examination opinions - the competent authorities of the industry fill in the replies, no competent department projects, Not fill. 8. Approval comments - approved by the environmental protection administrative department responsible for approving the project. 3 Basic situation Table (1) Guang'an World Bank Loan Medium-Term Adjustment Project - project name Qianfeng Subproject Construction unit Guang'an Xinhong Investment Holdings Co., Ltd. Hu legal representative Yang Xianjin Contact Zhenpeng contact number 18580039668 Postal code 638019 mailing address No. 5 Xinhong Road, Qianfeng District, Guang'an City Luxi River Section of Binhe North Road, Qianfeng District Construction site Qianfeng Bay Reservoir Approval Project department Number Flood Control and Demolition Facilities industry Nature of construction New construction Management (N7610); category Park Management (N7 851) Environmental 1410000 Investmen 1.06 Total investment 133,223,100 yuan investment yuan t ratio % Building Floor area 115830 m2 52000m2 area Project content and scale: 1.1 Project origin In order to speed up the urbanization of the Qianfeng District, improve and establish a safe, convenient, efficient, clean and economical modern urban environmental conditions; at the same time, in order to improve the flood control capacity of the front section of the Luxi River, ensure the construction of new towns in the Qianfeng District and upgrade the Qianfeng District. The overall overall image of the city; Guang'an City intends to apply for a loan from the World Bank and implement the “Guangan World Bank Loan Medium-Term Adjustment Project – Qianfeng Subproject” (hereinafter referred to as “the project”). The project intends to draw on the Bank's advanced urban management experience and strengthen it. Urban park management and flood risk management to improve urban infrastructure conditions to achieve sustainable urban development goals and improve livability. The project consists of two sub-projects, namely the new Xiejiawan Park Project and the comprehensive treatment of the Luxi River Logistics Park section of the Qianfeng District and the landscape project on both sides of the river. The new red line of Xiejiawan Park covers the area. 166,393 m2, construction of landscapes, road paving, greening, plank roads, parking lots, park buildings, amusement facilities, and sculptures. The comprehensive rectification and landscape project of Luxihe Logistics Parksection is located in the upstream section of Luxi River in Qianfeng District. The length of this section is 1559m. The starting point is about 300m bedrock in the upper reaches of Longtang Village Bridge, and the ending point is Qianfeng Village. Among them, about 300m bedrock from the upper reaches of Longtang Village Bridge to the railway bridge of Qianfeng 4 Village is about 1300m long, and the railway bridge from Qianfeng Village to Qianfeng Village is about 259m, and the new flood control embankment project of Luxi River is 2575.76m. A new landscape project with a width of 20-25m on both sides of the river section, with a total area of about 71,500 m2. The planned investment scale of the above two projects is about 133,223,100 yuan. The construction sites are located within the scope of Qianfeng District. The construction unit is Guang'an Xinhong Investment Holdings Co., Ltd. In accordance with the " Environmental Protection Law of the People's Republic of China" (January 1, 2015), the Environmental Impact Assessment Law of the People's Republic of China (September 1, 2016) and the Regulations on Environmental Protection Management of Construction Projects (Order No. 682)) requirements, the project requires an environmental impact assessment. Based on "construction project environmental impact assessment of Classification Catalog" (Department Order No. 44, revised 2018) dividedthe project XIEJIAWAN park project is "Forty, social programs and services -119-- parks (including zoos, Botanical Garden, Theme Park)- Others; The comprehensive improvement project of Luxi River is “46, Water Conservancy- 145 - River Lake Renovation-Other”. According to the requirements, the above two sub-projects should prepare an environmental impact report form. To this end, the construction unit entrusted our company to undertake the preparation of the environmental impact report form of the project. The evaluation will analyze and evaluate the environmental impact of the project construction based on engineering analysis and project characteristics, and propose measures and recommendations to prevent and mitigate adverse impacts. At the same time, through the environmental impact assessment of the project, it provides a scientific basis for the environmental protection administrative department's environmental decision-making, environmental supervision and project environmental management. 1. 2 Necessity of engineering construction 1. 2.1 Necessity of Xiejiawan Park Project Construction (1) Urban park construction can improve the quality of the urban environment and beautify the environment. To improve the city's appearance, the primary task of urban park greening is to improve the ecological environment. With the development of industry, a large amount of harmful gases are released into the atmosphere, which seriously pollutes the air. Green plants can absorb harmful gases, purify the air, reduce noise, regulate urban temperatures, and improve the living environment. Because urban greening is the embodiment of material civilization and a symbol of urban spiritual civilization. The park's greening layout is reasonable, the facilities are complete, the building is exquisite, the management is perfect, the operation is orderly, and the greenery is everywhere, the flowers are bright, the four seasons are green. The significance of the construction of modern urban parks means the significance of the construction of modern urban parks. Living in a city with beautiful scenery and harmonious ecological environment, people's mind and body will be healthier, more energetic, and more creative. It will promote social civilization and economic prosperity, making the city a place that people yearn for. (2) Qianghai District Xiejiawan Park and Huaying Mountain Range are across the city and have good mountain landscape resources. Surrounded by simple and natural towns and villages, the transportation is convenient and the environment is beautiful. New striker accelerate the development of cultural tourism industry, the construction of ecological demonstration city sponge district, according to "city, culture, tourism, industry interaction communion" development ideas, to build 5 striker surrounding renowned tourist and leisure destination. 1. 2.2 Necessity of the comprehensive renovation project of Luxi River The Qianfeng Logistics Park is located in the northwest of Huaying Mountain in the eastern part of the Sichuan Basin. There is no perfect flood control system in the riversection of this project. The river bends narrowly, the silt is seriously silted, the slope is gentle, the water is not smooth, and there is a rainstorm along the banks of the river. Ten thousand mu of farmland is vast and inundated for up to 2 to 3 days, causing serious losses to local industrial and agricultural production and people's lives and property. Every time the flood comes, the local government must invest a lot of manpower and material resources to prevent floods and floods.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    157 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us