Annexure- Form

Annexure- Form

FORM – I (I) Basic information 1. Name of the Project Development of Commercial Building 2. Sl. No. in the schedule Serial No.8 (a) 3. Proposed capacity/area/length/tonnage Total Site Area – 8,427.68 Sqmt (2.08A) to be handles/command area /lease Proposed project is Commercial Development /area / number of wells to be drilled (Retail shops, Office Space, Restaurant and Club) in 4B+G+14UF with total BUA of 64,198.59 Sqmt. 4. New/Expansion/Modernization New 5. Existing capacity/area etc Nil 6. Category of project i.e., ’A’ or ‘B’ ‘B’ 7. Does it attract the general condition? No If yes, please specify 8. Does it attract the specific condition? No If yes, please specify 9. Location New Municipal No. 61, Property ID: 76-20-61 St. Marks Road, BBMP ward No. 76, Richmond Town, Bengaluru. a. Plot/Survey/Khata No. Municipal No. 61 b. Village -- c. Thesil -- d. District Bengaluru e. State Karnataka 10. Nearest Railway station / Airport Railway Station –Bengaluru city railway station, along with distance in KM. which is around 5 km from the project site. Airport – Kempegowda international airport, which is around 35 km from the project site. 11. Nearest Town , City, District, Head Bengaluru quarters along with distance in KM 1 12. Village Panchayath, Zilla Parishad, Municipal Corporation – Bruhath Bengaluru Municipal Corporation, Local body Mahanagara Palike (BBMP), (Complete local address with Additional Commissioner (West), Telephone Nos. to be given) Sampige Road, Malleshwaram BBMP Bengaluru-560003 Ph: 22975648 / 22975601 13. Name of the Applicant Mr. K. Ranga Swamy, Authorized Signatory, [Mr. V.P. Tiruvengada Swamy & Mr. V. P Mahendra] 14. Registered Address Mr. K. Ranga Swamy, Authorized Signatory, [Mr. V.P. Tiruvengada Swamy & Mr. V. P Mahendra] # 63, Sun Grace, 1st Main, 6th Cross, KPA Block, Chandra Layout, Vijayanagar, Bengaluru -560 040. 15. Address for Correspondence: Mr. K. Ranga Swamy, Authorized Signatory, [Mr. V.P. Tiruvengada Swamy & Mr. V. P Mahendra] # 63, Sun Grace, 1st Main, 6th Cross, KPA Block, Chandra Layout, Vijayanagar, Bengaluru -560 040 Name Mr.K. Ranga Swamy Designation (Owner/Partner / CEO) Authorized Signatory Address # 63, Sun Grace, 1st Main, 6th Cross, KPA Block, Chandra Layout, Vijayanagar, Bengaluru -560 040. Pin code 560 040. E-mail [email protected] Telephone No. +91-9036507116 Fax No. -- 2 16. Details of alternative sites examined, No alternative sites were examined. if any. Location of these sites would be shown on a topo sheet 17. Interlined Projects No interlined projects 18. Whether separate application of No interlinked project has been submitted? 19. If Yes, date of submission -- 20. If No, reason Proposed project is a new individual project. 21. Whether the proposal involves This proposal does not require approval / approval / Clearance under : if yes, clearance under Forest Act, Wild life Act, & Details of the same and their status to C R Z Notification. be given The Forest (conservation) Act 1980? The wild life (protection) Act 1972? The C R Z Notification, 1991? 22. Whether there is any Government No order / Policy relevant / relating to the site? 23. Forest land involved (Hectares) No forest land involved 24. Whether there is any litigation pending No against the project and / or land in which the project is propose to be set up? a) Name of the court b) Case No. c) Orders / directions of the court, if any and its relevance with the proposed project. 3 (II) Activity 1. Construction, operation or decommissioning of the project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Details there of (with approximate Sl. No. Information/checklist Yes quantities/rates, wherever possible)with confirmation /No sources of information data 1.1 Permanent or temporary change in No As per the Revised Master Plan of BDA- land use, land cover or topography 2015, the proposed project site is including increase in intensity of designated for commercial (Business) zone land use(with respect to local land CDP is enclosed in Annexure – 1(a) Page use plan) No.31. 1.2 Clearance of existing land, Yes The proposed project site consist of about vegetation and buildings? 30 nos. of different species of trees, removing of this vegetative cover is only in building foot print area, where construction takes place, other rest of the vegetation will be retained as it is and majorly used for landscaping. Existing building will be demolished and demolition waste will be 1092 cum and it will be carted out. 1.3 Creation of new land uses? No As per the Revised Master Plan of BDA- 2015, the proposed project site is designated for commercial (Business) zone. Since the Proposed project is also a Commercial Development, there will be no new land use. 1.4 Pre-construction investigations Yes A pre-construction investigation of soil has e.g. bore houses, soil testing? been carried out at the project site. Soil report is enclosed in Annexure – 1(c) Page No. 36. 1.5 Construction work? No - 1.6 Demolition work? Yes Existing building will be demolished and demolition waste will be carted out. 1.7 Temporary sites used for No Labor requirement for the proposed construction workers or housing of project is about 250 Nos/day. The construction workers? construction laborers will be sourced from nearby area; hence there is no provision of 4 temporary housing for construction workers. 1.8 Above ground buildings, Yes Proposed Commercial development structures or earthworks including comprises of 4B+GF+14UF and hence the linear structures, cut and fill or project involves excavation, cut and fill for excavations the construction of basements and above ground buildings and landscaping. Annexure 1(d) Pg.No.37. 1.9 Underground works including No -- mining or tunneling? 1.10 Reclamation works? No -- 1.11 Dredging? No -- 1.12 Offshore structures? No -- 1.13 Production and manufacturing No -- processes? 1.14 Facilities for storage of goods or Yes The materials required for the purpose of materials? construction during the construction phase are stored within the project site and the details of these materials are enclosed in Annexure – 2(b) Page No. 45. During operational phase. HSD for DG will be stored in leak proof underground tanks in a designated place within the site premises. Lube oil for DG engine will be stored in leak proof containers on impervious floors. 1.15 Facilities for treatment or disposal Yes During construction phase: of solid waste or liquid effluents? During construction phase, the domestic solid wastes will be minimal as there is no provision of labor colony; the generated domestic solid waste will be handed over to BBMP and the generated domestic sewage will be discharged to the existing BWSSB sewer line. During operation phase: During operation phase, the solid wastes will be collected; segregation of organic & recyclable wastes will be done. The segregated organic wastes will be processed in organic waste converter and 5 the recyclable wastes will be handed over to authorized waste recyclers; generated e- waste will be handed over to authorized e- waste recyclers. The domestic liquid effluents will be treated in a Sewage treatment plant. Details of treatment facilities are as in Annexure – 1(e) Page No. 38-40. 1.16 Facilities for long term housing of No As local people will be hired for the operational workers? routine maintenance, no permanent facilities are proposed. 1.17 New road, rail or sea traffic during No The existing road, rail facility will be made construction or operation? use of. 1.18 New road, rail, air waterborne or No -- other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing Yes Traffic pattern in the approach roads i.e. transport routes or infrastructure St Mark’s road and State Bank of India leading to changes in traffic Road during construction and operation movements? phase would change. Existing and estimated additional traffic would be enumerated in Annexure – 1(f). Page No. 41. 1.20 New or diverted transmission lines No Electric power will be supplied by or pipelines? BESCOM from the existing transmission line. Water for operation phase shall be taken from BWSSB. Annexure 2(a) Page No.42- 44. 1.21 Impoundment, damming, culver No -- ting, realignment or other changes to the hydrology or watercourses or aquifers? 1.22 Stream crossings? No -- 1.23 Abstraction or transfers of water No There is no abstraction or transfers of from ground or surface waters? water from ground or surface waters. The construction water requirement will be sourced from BWSSB - tertiary treated STP water and water during operation phase 6 shall be sourced from BWSSB. 1.24 Changes in water bodies or the No Project site doesn’t receive / intercept land surface affecting drainage or storm water from the surroundings. run-off? Necessary provisions shall be made within the site to route the intercepted storm water into the external storm water drain. 1.25 Transport of personnel or Yes Raw materials for construction will be materials for construction, transported by trucks and the trips are operation or decommissioning? scheduled only during wee hours. 1.26 Long-term dismantling or No -- decommissioning or restoration works? 1.27 Ongoing activity during No -- decommissioning which could have an impact on the environment? 1.28 Influx of people to an area either Yes There will be a temporary influx of temporary or permanently? construction labourers, and this will be only for a short period until the completion of the construction work. As the proposed project is a development of Commercial Building, during operation phase, there will be a floating influx of about 6254 Nos. of visitors/guests and staffs.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    15 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us