Energy Challenges and Opportunities for the Mobile Industry in Africa

Energy Challenges and Opportunities for the Mobile Industry in Africa

Tower Power Africa: Energy Challenges and Opportunities for the Mobile Industry in Africa September 2014 Tower Power Africa, September 2014 Contents Executive Summary ................................................................................................................................ 5 Introduction .............................................................................................................................................. 7 Industry Context: Mobile Networks Growth in Africa ............................................................. 10 Mobile Network Coverage and Subscriber Growth ..................................................................................... 10 Size of Mobile Networks (No. of Tower sites) and Growth ...................................................................... 11 Industry Structure and Changing Tower Ownership ................................................................................. 11 Operations Context and Challenges to Growth ............................................................................................. 13 Challenges for Operations and Growth of Mobile Networks in Africa .................................... 14 Energy and Power Sector: Current State and Challenges in Africa ..................................... 15 Current state of Energy Supply and Consumption ...................................................................................... 16 Electricity Infrastructure and Challenges ....................................................................................................... 18 Energy as a challenge: Cost of Powering Mobile Networks in Africa ................................. 20 Grid Infrastructure and Growth in Off-grid and Unreliable-grid Network of Sites ..................... 21 The Real Cost of Grid Electricity in Africa ....................................................................................................... 22 Cost of Powering Mobile Networks ..................................................................................................................... 22 Renewable Energy in Africa: As an alternative for Powering Mobile Networks ........... 24 Renewable Resources and Potential in Africa ............................................................................................... 24 Policy and Regulations for promoting Renewable Energy ...................................................................... 26 Renewable energy alternatives for Powering Mobile Networks........................................................... 28 Suitability and Feasibility for Telecom Power .................................................................................. 28 The green opportunity ................................................................................................................................ 30 Current state of green adoption .............................................................................................................. 30 Barriers to green adoption........................................................................................................................ 31 Industry Trends and Opportunities: Future of Powering Mobile Networks in Africa 33 The Emerging Tower Co model ............................................................................................................................ 33 Impact on Green Adoption ........................................................................................................................ 35 Energy Outsourcing prospects in Africa ........................................................................................................... 36 Outlook and Future Prospects .............................................................................................................................. 37 Drivers for the green transition .............................................................................................................. 37 Conclusion ............................................................................................................................................... 39 2 Tower Power Africa, September 2014 Appendix A: Infrastructure Sharing and Outsourcing ............................................................ 40 Appendix B: Energy Outsourcing .................................................................................................... 44 Appendix C: Community Power from Mobile Infrastructure ............................................... 47 Appendix D: Renewable Policy and Targets across Africa .................................................... 49 Figures Figure 1: Mobile Coverage and Subscriber Penetration ................................................................................................. 10 Figure 2: Size of Mobile Networks in Sub-Saharan Africa (Number of Towers) ............................................................. 11 Figure 3: Tower Co share of total Tower Portfolio .......................................................................................................... 11 Figure 4: Major Tower Cos and their Tower Portfolio ..................................................................................................... 12 Figure 5: Operational Context of Mobile Networks ......................................................................................................... 13 Figure 6: Power Generation Mix and Installed Capacity ................................................................................................. 16 Figure 7: Electricity Generation, Access and Consumption in Perspective across Africa .............................................. 17 Figure 8: Electrification rates in Africa ............................................................................................................................ 18 Figure 9: Transmission and Distribution Grid Infrastructure in Africa ............................................................................. 19 Figure 10: Tower Sites by Off-grid and Unreliable-grid ................................................................................................... 21 Figure 11: Share of Energy costs in overall network OPEX ........................................................................................... 22 Figure 12: Cost of Powering Tower Sites (Off-grid) ........................................................................................................ 23 Figure 13: Business Case and Feasibility of sample green power system ..................................................................... 29 Figure 14: Cash flow Comparison and OPEX savings ................................................................................................... 29 Figure 15: Green Power deployments in Africa .............................................................................................................. 30 Figure 16: Key barriers to green power adoption in Telecoms ....................................................................................... 31 Figure 17: Growth in Tower Co model (by country, deals etc.) ....................................................................................... 33 Figure 18: Phases of Investment in Energy by a Tower Co (Post-acquisition) and the Impact on Green Energy investment ....................................................................................................................................................................... 34 Tables Table 1: Renewable Resource Potential (TWh) in Africa – by regions ........................................................................... 24 Table 2: Renewable Policy – guidelines, targets and incentives across select African countries................................... 26 Table 3: Green Alternatives: Fit for Telecom Power Deployments ................................................................................. 28 Glossary: MNO: Mobile network operator or mobile operator Tower Company (Tower Co): A company that manages a part or the entire assets of a telecom tower. 3 Tower Power Africa, September 2014 ESCO: Energy Service Company that provides end-end energy services and supplies power to telecom towers and/or community and businesses on a agreed pricing and business model. Mobile Coverage: Coverage (of population or land) by mobile network signal Mobile (unique) Subscribers: Number of people having subscribed to atelast one mobile service or connection Mobile Connections: Number of active connections (including mulptiple SIMs per user) CAPEX Model: Mobile Operator or Tower Company invests CAPEX of their own to rollout the renewable solution. OPEX Model: An ESCO invests CAPEX to generator power at site level and sells power to MNO or Tower Co Tenancy Ratio: A tenancy ratio is expressed as a fraction of the total number of operators sharing towers/total number of sites present. Site: Mobile tower site or Mobile base station site Off-grid site: Telecom Base Station Site which is NOT connected to the commercial Grid power supply On-grid site: Telecom Base Station Site which is connected to the commercial Grid power supply Bad-grid/Unreliable grid: Sites with power outages in excess of 6 hours per day on an average Grid: Electricity Utility Grid DG: Diesel Generator IRR: Internal Rate of Return is the Rate of Return of an Investment. OPEX: Operational Expenditure CAPEX: Capital Expenditure ROI: Return on Investment kWh/ MWh / GWh / TWh: Kilo Watt Hour / Mega

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    57 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us