MICHIGAN DEPARTMENT OF TRANSPORTATION BID LETTING RESULTS LETTING OF FEBRUARY 2, 2018 PROJECTS PENDING RELEASE The project call numbers listed below are pending release for contract award with a corresponding reason. A release date provided indicates the project is resolved. Update date: 2/22/2018; 8:45am CALL NUMBER REASON RELEASE DATE 1802 003 UBR 02/13/2018 1802 004 UBR 02/12/2018 1802 006 UBR 02/09/2018 1802 009 UBR 02/13/2018 1802 036 10% 02/22/2018 1802 055 UBR 02/09/2018 1802 059 10% 02/09/2018 1802 070 10% 02/22/2018 1802 072 10% 02/07/2018 1802 219 Other 02/14/2018-All Bids Rejected UBR-Selected for Unbalanced Bid Review Scroll down to view projects released for award. Letting of February 2, 2018 Letting Call: 1802 001 Low Bid: $1,336,750.25 Project: STUL 11000-133290 Engineer Estimate: $1,419,760.00 Local Agreement: 17-5571 Pct Over/Under Estimate: -5.85 % Start Date: June 11, 2018 Completion Date: September 7, 2018 Description: 0.48 mi of hot mix asphalt reconstruction, aggregate base, concrete curb, gutter, sidewalk and ramps, storm and sanitary sewer, drainage, machine grading, slope restoration and pavement markings on Wallace Avenue from Lakeshore Drive (BL 94) to Lakeview Avenue in the city of St. Joseph, Berrien County. This is a Local Agency Project. 4.00 % DBE participation required Bidder As-Submitted As-Checked Kalin Construction Co., Inc. $1,336,750.25 Same 1 ** Hoffman Bros., Inc. $1,428,339.40 Same 2 Kamminga & Roodvoets, Inc. $1,519,876.75 Same 3 Al's Excavating, Inc. $1,538,415.25 Same 4 Northern Construction Services, Corp. $1,541,306.35 Same 5 Peters Construction Co. $1,607,406.75 Same 6 Total Number of Bidders: 6 Letting of February 2, 2018 Letting Call: 1802 002 Low Bid: $1,153,196.65 Project: ST 82111-129183 Engineer Estimate: $1,275,368.93 Local Agreement: Pct Over/Under Estimate: -9.58 % Start Date: 10 days after award Completion Date: October 15, 2018 Description: Pump station rehabilitation including removal and replacement of mechanical and electrical components and miscellaneous structure upgrades and repairs on M-10 at Congress Street in the city of Detroit, Wayne County. No DBE participation required Bidder As-Submitted FOREIGN As-Checked FOREIGN Dan's Excavating, Inc. $1,153,196.65 Same 1 ** Z Contractors, Inc. $1,164,985.40 Same 2 Bidder As-Submitted DOMESTIC As-Checked DOMESTIC Dan's Excavating, Inc. $1,153,196.65 Same 1 ** Z Contractors, Inc. $1,164,985.40 Same 2 Total Number of Bidders: 2 NOTE: The As-submitted low bid received is determined in accordance with the Buy America Requirements, 23 CFR 634.410, for manufactured foreign and domestic steel/iron materials. Letting of February 2, 2018 Letting Call: 1802 003 Low Bid: $8,287,125.25 Project: MBWB 77111-131339 Engineer Estimate: $9,699,572.68 Local Agreement: Pct Over/Under Estimate: -14.56 % Start Date: February 26, 2018 Completion Date: January 10, 2020 Description: 0.42 mi of second Blue Water Bridge structural steel painting and application of concrete penetrating sealer on I- 94/I-69 over the St. Clair River in the city of Port Huron, St. Clair County. This project includes a 2 year warranty on bridge coating. No DBE participation required Bidder As-Submitted As-Checked Atsalis Brothers Painting Co. $8,287,125.25 Same 1 ** Civil Coatings and Construction Inc. $8,364,236.00 Same 2 360 Construction Company, Inc. $9,280,953.77 Same 3 Liberty Maintenance, Inc. $11,476,381.00 Same 4 Abhe & Svoboda, Inc. $12,388,604.75 Same 5 Total Number of Bidders: 5 02/13/2018 Letting of February 2, 2018 Letting Call: 1802 004 Low Bid: $26,408,750.13 Project: NH 41132-117992 Engineer Estimate: $32,333,204.29 Local Agreement: Pct Over/Under Estimate: -18.32 % Start Date: March 1, 2018 Completion Date: December 31, 2019 Description: 4.35 mi of concrete reconstruction and curb and gutter, earthwork, drainage, guardrail, signing, signal and pavement markings on US-131 from 10 Mile Road north to M-57 (14 Mile Road), Kent County. This project includes a 5 year materials and workmanship pavement warranty. 5.00 % DBE participation required Bidder As-Submitted As-Checked Toebe Construction LLC $26,408,750.13 Same 1 ** Interstate Highway Construction, Inc. $27,242,362.45 Same 2 Kamminga & Roodvoets, Inc. $27,324,513.13 Same 3 D. J. McQuestion/Crawford Contracting $28,099,624.66 Same 4 Ajax Paving Industries, Inc. $28,291,036.47 Same 5 Total Number of Bidders: 5 2/12/2018 Letting of February 2, 2018 Letting Call: 1802 005 Low Bid: $4,832,185.34 Project: NH 49023-132238 Engineer Estimate: $4,804,924.01 Local Agreement: Pct Over/Under Estimate: 0.57 % Start Date: 10 days after award Completion Date: November 15, 2018 Description: Structural steel full painting, structural steel repairs and expansion joint repairs on US-2 over the Cut River, Mackinac County. This project includes a 3 year sandstone restoration warranty and a 2 year bridge coating warranty No DBE participation required Bidder As-Submitted As-Checked Seaway Painting, L.L.C. $4,832,185.34 Same 1 ** Atsalis Brothers Painting Co. $5,539,773.34 Same 2 Civil Coatings and Construction Inc. $5,946,409.34 Same 3 Abhe & Svoboda, Inc. $7,642,480.00 Same 4 Liberty Maintenance, Inc. $9,071,787.64 Same 5 Total Number of Bidders: 5 Letting of February 2, 2018 Letting Call: 1802 006 Low Bid: $6,868,046.59 Project: NH 40023-120243 Engineer Estimate: $7,369,055.28 Local Agreement: Pct Over/Under Estimate: -6.80 % Start Date: April 16, 2018 Completion Date: November 3, 2018 Description: 7.78 mi of hot mix asphalt base crushing, shaping and resurfacing, safety and drainage improvements on M-72 from the Grand Traverse county line to east of Kalkaska Road, Grand Traverse and Kalkaska Counties. This project includes a 5 year materials and workmanship pavement warranty. 3.00 % DBE participation required Bidder As-Submitted As-Checked Rieth-Riley Construction Co., Inc. $6,868,046.59 Same 1 ** Elmer's Crane and Dozer, Inc. $7,255,562.54 Same 2 Total Number of Bidders: 2 2/9/2018 Letting of February 2, 2018 Letting Call: 1802 007 Low Bid: $1,261,840.52 Project: NH 55031-128658 Engineer Estimate: $1,157,144.43 Local Agreement: Pct Over/Under Estimate: 9.05 % Start Date: May 14, 2018 Completion Date: October 5, 2018 Description: Deck, barrier and substructure patching, joint replacement, structural steel repairs and approach work on US- 2/US-41 over Ford River and on M-35 over the Big Cedar River, Delta and Menominee Counties. This project includes a 2 year bridge painting warranty. No DBE participation required Bidder As-Submitted As-Checked Grand River Construction, Inc. $1,261,840.52 Same 1 ** Anlaan Corporation $1,286,554.05 Same 2 Hebert Construction Co. $1,367,720.17 Same 3 PCiRoads, LLC $1,476,330.65 Same 4 Zenith Tech, Inc. $1,506,503.40 Same 5 Lunda Construction Company $1,618,806.60 Same 6 Total Number of Bidders: 6 Letting of February 2, 2018 Letting Call: 1802 008 Low Bid: $852,279.11 Project: BRT 53000-129325 Engineer Estimate: $1,025,695.75 Local Agreement: 17-5569 Pct Over/Under Estimate: -16.91 % Start Date: 10 days after award Completion Date: June 30, 2018 Description: Bridge removal and replacement with galvanized steel beams, hot mix asphalt paving, earthwork and approach work on Custer Road over the Pere Marquette River, Mason County. This is a Local Agency Project. 4.00 % DBE participation required Bidder As-Submitted As-Checked Milbocker and Sons, Inc. $852,279.11 Same 1 ** Hardman Construction, Inc. $894,136.89 Same 2 J. E. Kloote Contracting, Inc. $896,677.70 Same 3 Anlaan Corporation $949,606.65 Same 4 E.T. MacKenzie Company $1,028,854.00 Same 5 Grand River Construction, Inc. $1,029,295.11 Same 6 Total Number of Bidders: 6 Letting of February 2, 2018 Letting Call: 1802 009 Low Bid: $4,874,103.06 Project: NH 21025-126833 Engineer Estimate: $5,551,093.07 Local Agreement: Pct Over/Under Estimate: -12.20 % Start Date: June 4, 2018 Completion Date: September 28, 2018 Description: 5.30 mi of hot mix asphalt surfacing and aggregate lift, concrete curb, gutter, culvert, guardrail, signage and pavement markings on US-2/US-41 from of the city of Gladstone to south of Rapid River in the city of Gladstone, Delta County. This project includes a 5 year materials and workmanship pavement warranty. This project is a pilot for model delivery. 2.00 % DBE participation required Bidder As-Submitted As-Checked Payne & Dolan Inc. $4,874,103.06 Same 1 ** James Peterson Sons, Inc. $5,230,760.55 Same 2 Bacco Construction Company $5,638,401.09 Same 3 Hebert Construction Co. $5,898,690.88 Same 4 M & M Excavating Company $5,929,223.12 Same 5 Total Number of Bidders: 5 02/13/2018 Letting of February 2, 2018 Letting Call: 1802 010 Low Bid: $1,708,723.91 Project: NH 40011-131753 Engineer Estimate: $2,114,973.40 Local Agreement: Pct Over/Under Estimate: -19.21 % Start Date: May 14, 2018 Completion Date: August 3, 2018 Description: 7.32 mi of hot mix asphalt cold milling and resurfacing, detail 8 joint repairs, pavement repairs and pavement markings on US-131 from south of South Boardman Road to just north of M-72 in the village of Boardman, Kalkaska County.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages74 Page
-
File Size-