CITY OF SEATTLE Seattle Public Utilities IMPROVEMENT OF: SOUTH PARK PUMP STATION Project Manual – Volume 2 of 3 Division 02 through Division 26 FUNDED BY: DWF and King County Flood Control District PW#: 2019-067 ORDINANCE #: 125724 Advertise: January 29, 2020 Bids Open: February 26, 2020 SEATTLE, WASHINGTON TABLE OF CONTENTS SECTION 00 01 10 SOUTH PARK PUMP STATION Page 1 VOLUME 2 – DIVISION 02 THROUGH DIVISION 26 DIVISION 02 – EXISTING CONDITIONS Section 02 41 01 – Demolition and Deconstruction DIVISION 03 – CONCRETE Section 03 11 00 – Concrete Forming Section 03 20 00 – Concrete Reinforcing Section 03 30 00 – Cast-in-Place Concrete Section 03 48 11 – Precast Concrete Vaults Section 03 60 00 – Grouting Section 03 70 00 – Mass Concrete DIVISION 04 – MASONRY Section 04 20 00 – Unit Masonry DIVISION 05 – METALS Section 05 05 14 – Hot-Dip Zinc Coating Section 05 05 33 – Anchor Bolts Section 05 10 00 – Structural Metal Framing Section 05 31 23 – Steel Roof Decking Section 05 50 00 – Metal Fabrications Section 05 51 00 – Metal Stairs Section 05 52 20 – Steel Railings Section 05 53 10 – Metal Gratings and Stair Treads TABLE OF CONTENTS SECTION 00 01 10 SOUTH PARK PUMP STATION Page 2 DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES Section 06 10 00 – Rough Carpentry Section 06 71 01 – Fiberglass Reinforced Products and Fabrications Section 06 82 13 – Fiberglass Reinforced Gratings DIVISION 07 – THERMAL AND MOISTURE PROTECTION Section 07 10 00 – Dampproofing and Waterproofing Section 07 31 10 – Thermal Insulation Section 07 54 23 – Thermoplastic Polyfin Roofing Section 07 60 00 – Metal Flashing Trim and Accessories Section 07 92 00 – Joint Sealants Section 07 93 00 – Preformed Joint Fillers DIVISION 08 – OPENINGS Section 08 11 00 – Metal Doors and Frames Section 08 31 20 – Floor Access Doors Section 08 71 01 – Finish Hardware DIVISION 09 – FINISHES Section 09 21 16 – Gypsum Board Assemblies Section 09 65 10 – Resilient Wall Base Section 09 90 00 – Coatings DIVISION 12 – FURNISHINGS Section 12 93 00 – Site Furnishings TABLE OF CONTENTS SECTION 00 01 10 SOUTH PARK PUMP STATION Page 3 DIVISION 22 – PLUMBING Section 22 00 00 – Plumbing Basic Requirements Section 22 30 00 – Plumbing Equipment Section 22 40 00 – Plumbing Fixtures DIVISION 23 – HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC) Section 23 05 93 – Testing, Adjusting, and Balancing for HVAC Section 23 30 00 – Sheet Metal Ductwork and Accessories Section 23 34 00 – HVAC Fans Section 23 37 13 – Diffusers, Registers, and Grilles Section 23 81 43 – Air Source Unitary Heat Pumps Section 23 82 00 – Heating Units DIVISION 26 – ELECTRICAL Section 26 00 00 – Electrical Section 26 05 19 – Low-Voltage Electrical Power Conductors and Cables Section 26 05 26 – Grounding and Bonding for Electrical Systems Section 26 05 33 – Raceways and Boxes for Electrical Systems Section 26 05 73 – Overcurrent Protective Device Coordination Study Section 26 08 01 – Testing Section 26 22 00 – Low Voltage Transformers Section 26 24 00 – Panelboards Section 26 24 19 – Motor Control Centers Section 26 27 15 – Miscellaneous Electrical Devices Section 26 27 26 – Wiring Devices Section 26 32 13 – Engine Generators TABLE OF CONTENTS SECTION 00 01 10 SOUTH PARK PUMP STATION Page 4 Section 26 32 30 – Vehicle Charging Equipment Section 26 35 26 – Active Harmonic Filters Section 26 36 00 – Automatic Transfer Switch Section 26 50 00 – Lighting End of Section 00 01 10 DEMOLITION AND DECONSTRUCTION SECTION 02 41 01 SOUTH PARK PUMP STATION Page 1 PART 1 - GENERAL 1.01 SUMMARY A. This Section specifies the requirements for removing, salvage, and recycling, of above ground and buried structures including but not limited to buried utilities, fencing, drainage structures, pavements, and debris. 1.02 REFERENCES A. American Society for Testing and Materials (ASTM), versions current at time of bid. B. City of Seattle, Standard Specifications for Road, Bridge and Municipal Construction, 2017 Edition. C. This Section incorporates by reference the latest revisions of the following documents. In case of conflict between the requirements of this Section and the listed documents, the requirements of the Contract Specifications shall prevail. Reference Title ANSI A10.6 Safety Requirements for Demolition Operations EPA, CFR, Title 40 Part 61—National Emission Standards for Hazardous Air Pollutants Part 273—Standards for Universal Waste Management Part 262—Standards Applicable to Generators of Hazardous Waste Part 265—Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities OSHA, CFR, Title 29 Part 1926—Occupational Safety and Health Regulations for Construction Director’s Rule (DR) 4-2009 City of Seattle Department of Planning and Development Demolition Permit with a Waste Diversion Plan Hazardous Materials Inventory Regulated Building Materials Assessment Report, 636 and 640 South Riverside Drive, Seattle Public Utilities, October 5, 2009 WAC 296-62 General Occupational Health Standards WAC 296-65 Asbestos PSCAA Regulation III, Article 4 Asbestos Control Standards WAC 296-62-155-176 Lead in Construction WAC 173-303 Dangerous Waste Regulations WAC 296-800-170 Employer Chemical Hazard Communication D. Whenever the words “Standard Specifications” are referred to, the reference is to the City of Seattle, Standard Specifications for Road, Bridge and Municipal Construction, 2017 Edition. E. The Contractor shall have at least one copy of the Standard Specifications at the job site. DEMOLITION AND DECONSTRUCTION SECTION 02 41 01 SOUTH PARK PUMP STATION Page 2 F. The Standard Specifications apply only to performance and materials and how they are to be incorporated into the work. The legal/contractual relationship sections, and measurement and payment sections do not apply to this document. 1.03 DEFINITIONS A. City or COS: City of Seattle. B. Beneficial Use: The use of solid waste as an ingredient in a manufacturing process, or as an effective substitute for natural or commercial products, in a manner that does not pose a threat to human health or the environment. C. Demolition: Dismantling, razing, destroying, or wrecking of any fixed building or structure or any part thereof. D. Recycling: The transformation or remanufacturing of waste materials into useable or marketable materials for use other than incineration or other means of disposal. E. Regulated Building Materials: Materials such as asbestos-containing material, lead containing coatings, PCB containing light ballasts, and mercury containing components where regulated notification, handling, and disposal is required. F. Relocate: Remove, protect, clean and reinstall equipment, including electrical, instrumentation, and all ancillary components required to make the equipment fully functional, to the new location identified on the Drawings. G. Reuse: The recovery of materials for repeated use in the same form. H. Salvage/Salvageable: The removal of select materials from a building prior to deconstruction or demolition. Salvage generally applies to recovery of appliances, cabinets, fixtures, flooring and other materials for reuse that require minimal labor to recover and for which the building envelope does not need to be disturbed for their removal. Unless otherwise specified, title to items identified for demolition shall revert to Contractor. I. Structure: Anything constructed or erected on the ground or any improvement built up or composed of parts joined together in some definite manner and affixed to the ground, including fences, walls, and signs, but not including poles, flowerbed frames and such minor incidental improvements. 1.04 ADMINISTRATIVE REQUIREMENTS (NOT USED) 1.05 SUBMITTALS A. Submit the following according to Standard Specification 01 33 10 Submittals. 1. Submit proposed waste diversion plan in accordance with requirements specified herein for approval prior to issuance of the demolition permit C. Submit proposed deconstruction plan in accordance with requirements specified herein for approval before such work is started. 2. Upon completion of the deconstruction effort submit the final waste diversion report and associated receipts identifying rates of reuse, recycling, and beneficial use. 3. Submit proposed demolition plan, in accordance with requirements specified herein, for approval before such work is started. DEMOLITION AND DECONSTRUCTION SECTION 02 41 01 SOUTH PARK PUMP STATION Page 3 4. Submit copies of any notifications, authorizations and permits required to perform the work. 5. Submit records of pipe cleaning activities, including video inspection, and record of disposal of removed materials. 6. Submit copies of notices of intent for well decommissioning. 1.06 REGULATORY AND SAFETY REQUIREMENTS A. Comply with applicable federal, state, and local hauling and disposal regulations. In addition to the requirements of the General Conditions, Contractor’s safety requirements shall conform with ANSI A10.6. B. Furnish timely notification of this demolition project to applicable federal, state, regional, and local authorities in accordance with 40 CFR 61 Subpart M. C. Comply with WAC 296-62, WAC 296-65 and PSCAA Regulation III, Article 4 for asbestos related work. D. Conduct exposure assessment in compliance with WAC 296-62-155-176 during operations that may disturb the lead paint in such a way that the airborne exposure may reach or exceed the Action Level of 30 micrograms per cubic meter or the Permissible Exposure Limit of 50 micrograms per cubic meter. E. Collect and analyze per WAC 173-303 a toxicity characteristic leachate procedure (TCLP) sample that is a representative of the waste stream. F. Comply with WAC 296-800-170. 1.07 DEMOLITION PLAN A. Demolition plan shall provide for safe conduct of the work and shall include: 1. Construction must be timed in accordance with permit provisions for working in the fish window 2. Detailed description of methods and equipment to be used for each operation. 3. The Contractor’s planned sequence of operations, including coordination with other work in progress; stockpile locations; temporary grading and drainage to protect the subgrade. 4. Disconnection schedule of utility services. 5. Dewatering plan, where required by Section 31 23 20, Control of Water. 6.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages451 Page
-
File Size-