Levelized Cost of Energy (LCOE)

Levelized Cost of Energy (LCOE)

DOE OFFICE OF INDIAN ENERGY Levelized Cost of Energy (LCOE) 1 Upfront Capital Costs for Renewables Upfront costs do not paint a complete picture 2 Key Concept: Levelized Cost of Energy (LCOE) • Measures lifetime costs divided by energy production • Calculates present value of the total cost of building and operating a power plant over an assumed lifetime. • Allows the comparison of different technologies (e.g., wind, solar, natural gas) of unequal life spans, project size, different capital cost, risk, return, and capacities Critical to making an informed decision to proceed with development of a facility, community or commercial-scale project 3 Simple LCOE Concept Energy System Site × $$$ Annual Characteristics/ Expenses $ Resources Initial Costs ($25) Including Financing ($100) Annual Annual Cost Per Year Energy Production (1000 kWh) ($125) $ LCOE ($/MWh) $125/1000) $0.125/kWh Adapted from European Wind Energy Association, “Economics of Wind Energy,” http://www.ewea.org/fileadmin/ewea_documents/documents/00_POLICY_document/Economics_of_Wind_Energy__March_2009_.pdf 4 Simplified LCOE Calculation n I t + M t + Ft Σ t=1 (1+r) t n E t Σ t=1 (1+r) t It = Investment expenditures in year t (including financing) Mt = Operations and maintenance expenditures in year t Ft = Fuel expenditures in year t Et = Electricity generation in year t r = Discount rate n = Life of the system 5 http://en.openei.org/wiki/Transparent_Cost_Database 6 Wind LCOE Sensitivity: What Are the Big Drivers? Initial capital cost (ICC) and capacity factor are two critical drivers, but discount rate (financing costs) and annual operating expenses (AOE) are non-trivial. Wind LCOE example shown below: Source: Tegen et al. 2012 7 LCOE Models CREST LCOE Calculator https://financere.nrel.gov/finance/content/crest- cost-energy-models http://www.nrel.gov/analysis/tech_lcoe.html 8 Using LCOE Calculating and comparing LCOE can: • Measure value across the longer term, showing projected life-cycle costs • Highlight opportunities for Tribes to develop different scales of projects (facility, community, or commercial) • Inform decisions to pursue projects on an economic basis, compared to utility rates Most renewable energy projects have zero fuel costs (with biomass being the possible exception) 9 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    9 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us