Tyler J. Tramonte Vice President of Estimating

Tyler J. Tramonte Vice President of Estimating

Tyler J. Tramonte Vice President of Estimating Tyler is Co-Owner and Vice President of Estimating at Stuart & Company. He is a graduate of Louisiana State University with a Bachelor of Science Degree in Construction Management. He joined the Stuart & Company staff as an Estimator in May 2009 and has progressed to the position of Vice President of Estimating. He has learned and mastered the skill of estimating commercial projects from design through job start up including detailed budgets at every phase of design, value engineering, and competitive bid. His thorough pre-construction work ethic and unparalleled effort has created excellent relationships with owners, architects, engineers, and subcontractors. His success is a result of his motivation and leadership which has earned him the title of Vice President. He has continually proven to get projects within the owner’s budget and ultimately bringing the owner’s vision to reality. Tyler has proven to be a valuable asset to Stuart & Company. PROJECT ESTIMATING EXPERIENCE: • Lafon Nursing Home, New Orleans, LA ($14.6 M) • St. Amant High School, New Freshman Academy ($13.9M) • River Modeling Center for the Office of Coastal Protection & Restoration, Baton Rouge, LA ($7.2 M) • New Imaging Center, Pennington Biomedical Research Center, Baton Rouge, LA ($6.8 M) • Walmart Neighborhood Market, Baton Rouge, LA ($5.8 M) • Copper Mill Elementary School, Gym and Classroom Additions, Zachary, LA ($4.7 M) • St. Joseph Hospice Inpatient Facility, Lafayette, LA ($4.6 M) • New Fairwood Branch Library, Baton Rouge, LA ($4.5 M) • Capitol Park Security Improvements, Baton Rouge, LA ($4.4 M) • Renovations for Baton Rouge Police Headquarters, Baton Rouge, LA ($4.1 M) • Plaquemine High School, Classroom Additions, Plaquemine, LA ($4.1 M) • Louisiana State Capitol, HVAC Replacement & Renovations – Phase 5, Baton Rouge, LA ($3.9 M) • Pennington Biomedical Research Center, Renovations to Bldgs. “D” and “G”, Baton Rouge, LA ($3.7 M) • Louisiana Technical College Westside Campus, Plaquemine, LA ($3.7 M) • Louisiana State Capitol, HVAC Replacement & Renovations – Phase 4, Baton Rouge, LA ($3.5 M) • Pangburn Office Building, New Roads, LA ($3.5 M) • St. Joseph Cathedral Parish Hall, Additions & Renovations, Baton Rouge, LA ($3.4 M) • Pennington Biomedical Research Center, Renovations to Bldgs. “B” and “C”, Baton Rouge, LA ($3.3 M) • Louisiana State Capitol, HVAC Replacement & Renovations - Phase 3, Baton Rouge, LA ($3.0 M) • New Police Headquarters, Town of Brusly, Brusly, LA ($2.8 M) • St. Elizabeth Hospital, Renovations to Medical Plaza I, Gonzales, LA ($2.7 M) • Mercedes-Benz Of Baton Rouge, Additions & Modifications, Baton Rouge, LA ($2.4 M) • New Wooddale Blvd. Fire Station #8, Baton Rouge, LA ($2.0 M) • Renovations & Improvements to Bernard Terrace Elementary School, Baton Rouge, LA ($1.8 M) • Breezeway Ceiling Replacement, Louisiana State Capitol, Baton Rouge, LA ($1.4 M) • St. Elizabeth Hospital, Heart Cath Lab Build-Out, Gonzales, LA ($1.2 M) • Renovations for Ethan Allen Furniture Store, Baton Rouge, LA ($907,875) .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us