Draft Initial Environmental Examination

Draft Initial Environmental Examination

Draft Initial Environmental Examination May 2017 NEP: Regional Urban Development Project (RUDP) Solid Waste Management Subproject, Dhangadhi Sub-metropolitan City, Kailali CURRENCY EQUIVALENTS (as of 7 February 2017) Currency unit – Nepalese Rupee (NPR) NPR 1.00 = $ 0.00930 $1.00 = NPR 107.52600 ABBREVIATIONS 3R = Reduce, Reuse and Recycle AAPA = Aquatic Animals Protection Act ADB = Asian Development Bank CBS = Central Bureau of Statistics CFUG = community forest users group CITES = Convention on International Trade of Endangered Species of Wild Fauna and Flora DADO = district agriculture development office DDC = district development committee DEECCU = district energy, environment and climate change unit DFO = district forest office DIZ = direct impact zone DMC = developing member country DSC = design and supervision consultants DUDBC = Department of Urban Development and Building Construction DWEC = daily wage execution committee EARF = environmental assessment and review framework EHS = environment, health and safety EIA = environmental impact assessment EMAP = environmental management action plan EMEP = environmental mitigation execution plan EMP = environmental management plan EPA = Environment Protection Act EPM = Environmental Protection Measures EPR = Environment Protection Rules FGD = focused group discussion FWR = far western Region FY = fiscal year GDP = gross domestic product GFP = grievance focal points GHG = green house gas GO = governmental organizations GON = Government of Nepal GRC = grievance redress committee GRC = grievance redress cell HDPE = high density polyethylene pipe IEC = information, education and communication IEE = initial environmental examination IIZ = indirect impact zone INGO = International Governmental Organizations ISWM = integrated solid waste management IUCN = International Union for Conservation Nature IUD = Integrated Urban Development Project IWPS = Integrated Waste Processing Sites LGCDP = Local Governance and Community Development LS = lump sum MOFALD = Ministry of Federal Affairs and Local Development MOFSC = Ministry of Forest and Soil Conservation MOPE = Ministry of Population and Environment MOUD = Ministry of Urban Development MPMC = Municipal Project Management Committee MSW = municipal solid waste NEA = Nepal Electricity Authority NGO = non-governmental organization NRS = Nepalese Rupees NTFP = non-timber forest products NWSC = Nepal Water Supply Corporation OHS = occupational health and safety PAF = project affected families PCO = project coordination office PHC = public hearing committee PIU = project implementation unit PMSC = project management and supervision consultants PPE = personal protective equipment PPTA = project preparatory technical assistance REA = rapid environmental assessment RUDP = Regional Urban Development Project SEA = strategic environmental assessment SHS = solar home system SPM = suspended particulate matter SPS = Safeguard Policy Statement SWMTSC = Solid Waste Management and Technical Support Centre TLO = Tole Level Organization ToR = terms of reference TSP = total suspended particles VDCs = village development committees WUA = water users association ZoI = zone of influence NOTES (i) The fiscal year (FY) of the Government of Nepal ends on 15 July. FY before a calendar year denotes the year in which the fiscal year ends, e.g., FY2017 ends on 15 July 2017. (ii) In this report, "$" refers to US dollars This initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. CONTENTS Page EXECUTIVE SUMMARY i I. INTRODUCTION 1 II. POLICY, LEGAL AND ADMINISTRATIVE FRAMEWORK 1 A. ADB Policy 1 B. National Laws, Policies, Acts, Regulations, Standards and Guidelines 3 III. DESCRIPTION OF THE PROJECT 9 A. Exiting Situation 10 B. SWM institutions 12 C. Proposed Subproject 13 D. Indicative SWM Component Packages and Cost 22 E. Implementation Schedule 22 IV. DESCRIPTION OF THE ENVIRONMENT 24 A. Physical Resources 24 B. Ecological Resources 27 C. Social and Cultural Resources 30 D. Physical Infrastructure 31 E. Economic Characteristics 32 F. Major Environmental problems 33 V. ALTERNATIVE ANALYSIS 33 A. Project Alternatives 33 B. Design Alternative 33 C. Project Site/ Location Alternative 34 D. Alternative in Technology, Implementation Procedure and Raw Materials 34 E. No Project Option 34 VI. ANTICIPATED ENVIRONMENTAL IMPACTS 34 A. Methodology 34 B. Screening out Areas of No Significant Impact 35 C. Anticipated Impacts and Mitigation Measures–Planning and Design Phase 35 D. Anticipated Impacts and Mitigation Measures–Construction Phase 39 E. Anticipated Impacts and Mitigation Measures–Operation and Maintenance 52 F. Cumulative Impact Assessment 60 G. Greenhouse Gas Emissions (GHG) 62 VII. ENVIRONMENTAL MANAGEMENT PLAN 62 A. Institutional Arrangement 62 B. Safeguard Implementation Arrangement 62 C. Institutional Capacity Development Program for EMP Implementation 65 D. EMP Tables 66 E. Environmental Monitoring Program 66 F. Monitoring and Reporting 102 G. Training Activities on EMP Implementation 102 H. Cost estimates 103 VIII. INFORMATION DISCLOSURE, CONSULTATION AND PARTICIPATION 104 A. Public Consultation and Information Disclosure: 104 B. Information Disclosure 111 C. Grievance Redress Mechanism 111 IX. CONCLUSION AND RECOMMENDATION 112 D. Plant Maintenance Technician 140 List of Appendices 1. Rapid Environmental Assessment Checklists 2. Relevant Environmental Quality Standards 3. Sample Grievance Registration Form 4. Sample Semi-Annual Environmental Monitoring Report Template 5. Attendance List of Public Consultation Meeting 6. Project Implementation Schedule 7. Key Functions, Roles and Responsibilities during the FSTP Operations & Maintenance 8. Sample Outline of Spoils Management Plan 9. Sample Outline of Traffic Management Plan EXECUTIVE SUMMARY 1. The Regional Urban Development Project (RUDP) will improve resilient and sustainable urban infrastructure in 8 municipalities located in the southern Terai region of Nepal bordering India. The project will also support regional and urban planning, municipal infrastructure investments, and institutional strengthening to foster regional competitiveness and regional cooperation. The project will also strengthen government capacity for preparation of transformational projects with high readiness for cities in Nepal through a project bank facility. 2. Pre-feasibility has been undertaken in the Far Western Region (FWR) towns of Attariya, Bheemdatt, Dhangadhi, and Jhalari-Pipaladi. Construction of a solid waste management landfill and associated facilities were proposed in each of these municipalities for the overall improvement of solid waste management (SWM) system. 3. Subproject scope and location. The SWM subproject at Dhangadhi sub-metropolitan city is one of the subprojects proposed under RUDP. The subproject includes construction of a new landfill with compost plant, internal roads, boundary wall and transfer stations. 4. Dhangadhi sub-metropolitan city is located in Kailali District, one of the two districts in FWR that lies in the Terai belt of the country. It is located between 28'22o and 29'05o latitude and 80' 30o and 81'18 o longitude. Geologically, Kailali District is divided into 2 different regions, Chure and Terai belt respectively. Topographically, Dhangadhi sub-metropolitan city is a flat terrain with an average elevation of 100 m to 110 m above mean sea level. The sites of the SWM components are not within or adjacent to ecologically-sensitive areas. 5. Implementation Arrangements. The subproject will be implemented by the Dhangadhi sub-metropolitan citywith support from the Department of Urban Development and Building Construction in the Ministry of Urban Development. 6. Screening and Categorization. An environmental assessment of the subproject is required per ADB’s Safeguard Policy Statement (SPS, 2009). Based on preliminary designs of the proposed SWM subproject in Dhangadhi, environmental assessment using ADB’s Rapid Environmental Assessment (REA) checklist for solid waste management (Appendix 1) was conducted and results of the assessment show that the subproject is unlikely to cause significant adverse impacts. 7. Potential environmental impacts are identified, their significance assessed, and strategies devised to avoid these impacts or reduce them to an acceptable level. These strategies (called mitigation measures) are then incorporated into the environmental management plan (EMP). Thus the Dhangadhi SWM subproject is classified as environmental category B as per ADB SPS and an initial environmental examination (IEE) has been prepared in accordance with ADB SPS’s requirements for environment category B projects. 8. Purpose of the initial environmental examination. This IEE is to examine the proposed SWM subproject in Dhangadhi sub-metropolitan, ensure that the environmental issues associated with the development are effectively managed and they will not damage the environment, and provide guidance for the planning, construction and operation of the proposed subproject. This

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    160 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us