(Mooring – Tide Gauge) Is ~22 Mm

(Mooring – Tide Gauge) Is ~22 Mm

Updated Results from the In Situ Calibration Site in Bass Strait, Australia Christopher Watson1 , Neil White2,, John Church2 Reed Burgette1, Paul Tregoning 3, Richard Coleman 4 1 University of Tasmania ([email protected]) 2 Centre for Australian Weather and Climate Research, A partnership between CSIRO and the Australian Bureau of Meteorology 3 The Australian National University 4 The Institute of Marine and Antarctic Studies, UTAS OSTM/Jason-2 OST Science Team Meeting Updated Data Stream Presentation 1 San Diego OSTST Meeting October 2011 Impossible d'afficher l'image. Votre ordinateur manque peut-être de mémoire pour ouvrir l'image ou l'image est endommagée. Redémarrez l'ordinateur, puis ouvrez à nouveau le fichier. Si le x rouge est toujours affiché, vous devrez peut-être supprimer l'image avant de la réinsérer. Methods Recap Bass Strait • Primary site is located on Pass 088 in Bass Strait. Contributing bias estimates to the SWT/OSTST since the launch of T/P . • Secondary site along track in Storm Bay Storm Bay 2 Methods Recap • We adopt a purely geometric technique for determination of absolute bias. • The method is centred around the use of GPS buoys to define the datum ofhihf high preci si on ocean moori ngs. • Outside of available mooring data, all available mooring SSH data are used to correct tide gauge SSH to the comparison point. 3 Instrumentation (Bass Strait): Tide Gauge and CGPS • Tide gauge part of the Australian baseline array, located in Burnie. • Vertical velocity not significantly different from zero. • CGPS time series shows a quasi-annual periodic signal (amplitude ~3-4 mm). Current BUR 2 CGPS at tide gauge investigations point towards this being dominated by a (spurious) GPS draconitic annual period (~351 days). Watson et al. (2011) RHPT 4 Bedrock CGPS site (~5km) Instrumentation: Ocean Moorings & GPS Buoys Buoy A Buoy B Buoy C Datum comparable with altimeter Mean offset X Mean offset Y AbitArbitrary da tum X Arbitrary datum Y Mooring 2011 Mooring 2008-09 • Mooring 2008-09 shifted onto absolute datum using 8 GPS buoy deployments, each ~8 hr duration. • Mooring 2011 shifted onto absolute datum using 2 ~50 hr buoy deployments. 5 Instrumentation: Ocean Moorings & GPS Buoys Buoy A Buoy B Buoy C Datum comparable with altimeter Mooring 2008-09 Mooring 2011 Mean offset + dAmp + dPhase + dAP Tide gauge Local chart datum Tide gauge 1992 - 6 Instrumentation: Ocean Moorings & GPS Buoys Datum comparable with altimeter • Tidal difference between mooring and tide gauge is dominated by M2 (amp = 0.126 m, and N2 (amp = 0.030m). • Non tidal differences are reduced by modelling the differential effect of the modelled air pressure between the mooring and tide gauge. • The RMS of the final non tidal residual (mooring – tide gauge) is ~22 mm. • The corrected tide gauge dataset enables us to compute cycle by cycle estimates of absolute bias. 7 GPS Buoy vs Mooring SSH: Bass Strait -53.05 -53.05 Buoy 3 Buoy 4 -53.1 -53.1 -53.15 -53.15 SH (m) SS -53.2 -53.2 - Mooring Mooring - yy -53.25 -53.25 Buo -53.3 -53.3 12:00 00:00 12:00 00:00 12:00 00:00 12:00 15-May-2011 to 17-May-2011 (UTC) 11-Aug-2011 to 12-Aug-2011 (UTC) • 1 Hz GPS Buoy SSH time series is filtered prior to comparison with the mooring SSH (5 minute estimates). • The residual time series (Buoy SSH – Mooring SSH) shows a typical RMS of ~18-20 mm. 8 • Conservative estimates of independence every 3 hours, yields a standard error about the mean of ~ 3 mm. Example 1 Hz GPS Buoy Data Storm Bay 1 Hz SSH 1.5 • Our current evolution in GPS buoy enables extended 1 deployment for up to 3 days. 0.5 0 • Deployed in pairs, tethered H (m) SS individually via horizontal S floating tethers attached to -0.5 surface floats, which are then anchored to the sea -1 floor. -1.5 • Deployment typically 00:44:30 00:45:00 00:45:30 00:46:00 UTC (HH:MM:SS) limited to relatively calm 2 conditions (good results in 10 up to ~3.5 m peak to trough ~12-13 secs waves at Storm Bay). 0 ) 10 • Swell signals are readily extracted from 1 Hz data at -2 both sites. (dB Power 10 -4 9 10 2 1 10 10 Period (secs) Results: Preview 1. TOPEX Side A and B, Jason-1 and OSTM/Jason-2 ¾ All available cycles (OSTM/Jason-2 up to cycle 112) ¾ TOPEX: GSFC orbits, corrected TMR, Chambers et al SSB. ¾ Jason-1: GSFC orbits, enhanced JMR. ¾ OSTM/Jason-2: GSFC orbits, enhanced AMR. 10 Bass Strait Absolute Bias Record 11 Absolute Bias Periodic Energy ~62days ~434 days &B AA TOPEX TOPEX ~62days~116 days ~365days Jason-1 ~33. 5 days ~116 days ason-2 JJ 12 Bass Strait Absolute Bias Record TOPEX Side A TOPEX Side B Jason-1 OSTM/Jason-2 Both the ~62 d and ~434 d period signals are in phase between TOPEX A/B Linear rate: +1.8 ± 1.0 mm/y +1.2 ± 2.6 mm/yr +2.6 ± 1.0 mm/yr -11 ± 4 mm/yr Variance exp: 10 % 27 % 29 % 20 % Residual RMS: 25 mm 26 mm 31 mm 32 mm 13Periodic terms: 62d + 434d 62d + 434d 62d + 116d + 365d 34d + 116d Results: OSTM/JasonOSTM/Jason--22 Absolute Bias 2. OSTM/Jason-2 ¾ Closer look at bias record cycles 001-112. ¾ Influence of T/GDR AMR vs enhanced AMR ¾ Influence of GSFC orbit vs GDR orbit 14 Results: OSTM/JasonOSTM/Jason--22 Absolute Bias: Bass Strait • Usinggp the enhanced AMR product increases the bias by 3.1 mm (standard deviation of the difference time series is 4.1 mm). 15 Results: OSTM/JasonOSTM/Jason--22 Absolute Bias: Bass Strait • Using the T/GDR orbit over the GSFC orbit increases the bias by 2.1 mm (standard deviation of the difference 15.2 mm). 16 Results: OSTM/JasonOSTM/Jason--22 Absolute Bias: Storm Bay • Preliminary bias estimates from Storm Bay, using the only available mooring data, show a comparable bias to Bass Strait (c.f 169.7 mm) • Detailed comppqarison requires additional mooring ggg data, ongoing analysis and refinement of datum. 17 Conclusions Data Cycles N Mean Bias ± Std Error TOPEX Side A 001-235 195 - 818.1 ± 19mm1.9 mm (GSFC Orbits, corrected TMR, Chambers SSB) TOPEX Side B 236-365 114 + 1.8 ± 2.9 mm (GSFC Orbits, corrected TMR, Chambers SSB) Jason-1 GDR-C 001-259 234 +105.1 ± 2.4 mm (GSFC Orbits, enhanced JMR) Decrease by ~10 mm if using GDR JMR OSTM/Jason-2 T/GDR 001-112 98 +169.7 ± 36mm3.6 mm (GSFC Orbits, enhanced AMR) Decrease by 3.1 mm if using GDR AMR Increase by 2.1 mm if using GDR orbits ¾ Recall that non-time averaging systematic error contributions likely dictate that the “absolute” error is ~15 mm for these estimates. 18 www.imos.org.au Questions? Christopher Watson1 , Neil White2,, John Church2 Reed Burgette1, Paul Tregoning 3, Richard Coleman 4 1 University of Tasmania ([email protected]) 2 Centre for Australian Weather and Climate Research, A partnership between CSIRO and the Australian Bureau of Meteorology 3 The Australian National University 4 The Institute of Marine and Antarctic Studies, UTAS OSTM/Jason-2 OST Science Team Meeting Updated Data Stream Presentation 19 San Diego OSTST Meeting October 2011 Spares… 20 Instrumentation: Ocean Moorings & GPS Buoys • We derive a precise SSH time series , directly at the altimeter comparison point using two deployments of moored oceanographic instruments (high accuracy pressure gauges, Seabird TS meters and current meters). • Mooring deployments 2008-09 (1 year), 2011 (6 mths). • Unfortunately, 6 months of mooring data following the previous OSTST was lost due to technical issues with SBE26 pressure gauges. • The d at um of eachih mooring-diderived SSH seriiies is determined using episodic GPS buoy deployments. (Datum shift = GPS SSH – Mooring SSH) • Ou ts ide th e moori ng d epl oyment wi nd ow, th e tid e gauge data can be tidally corrected to best fit the ensemble mooring series. 21 GPS Buoy vs Mooring SSH: Storm Bay Buoy 3 -100.65 -100.65 Buoy 4 -100.7 -100.7 SH (m) SS -100.75 -100.75 - Mooring Mooring - -100.8 -100.8 yy Buo -100.85 -100.85 -100.9 -100.9 12:00 00:00 12:00 00:00 00:00 12:00 00:00 12:00 00:00 30-May-2011 to 01-Jun-2011 (UTC) 19-Aug-2011 to 22-Aug-2011 (UTC) • Slight improvement in the precision at Storm Bay due to improved GPS network geometry. • Note increased water depth at this site (~101 m vs ~53 m at Bass Strait). 22.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    22 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us