AMENDMENTS to 2020-2024 STIP Updated May 18, 2021, for Amendment 9 Estimated Funding Public Amend- Dist

AMENDMENTS to 2020-2024 STIP Updated May 18, 2021, for Amendment 9 Estimated Funding Public Amend- Dist

AMENDMENTS TO 2020-2024 STIP Updated May 18, 2021, for Amendment 9 Estimated Funding Public Amend- Dist. UPN County Project Name Scope Costs Phases Source Involvement ment 1 8078-000 Flathead WHITEFISH STAGE ROAD - KAL Reconstruction $650,319 PE STPS 6/25/20 Commission Mtg. 1 1 9760-000 Missoula RRXING-I-90 FRONTAGE-CLINTON RR Crossing $259,984 PE,CN,CE RRP N/A 2 1 9818-000 Sanders RRXING - MT 200 -PARADISE RR Crossing $244,007 CN,CE RRP N/A 2 1 9825-000 Missoula RRXING -DESCHAMPS LANE -MSLA RR Crossing $282,650 CN,CE RRP N/A 2 1 9883-000 Lincoln PLEASANT VALLEY -REVEGETATION Miscellaneous $125,896 CN STPX N/A 2 1 9526-001 Missoula SF179 STEPHENS ORANGE SFTY IMP Int Improvements $126,602 PE HSIP 8/27/2020 Commission Mtg 3 1 9706-000 Flathead, Lake LAKESIDE - N & S Chip Seal $11,132 RW NH 6/27/2019 Commission Mtg 3 1 9820-000 Ravalli D1 BRIDGE PRESERVATION - JOC Bridge Decks $7,768,257 CN, CE STPB 2/20/2020 Commission Mtg 3 1 9834-000 Flathead KALISPELL ADA UPGRADES ADA Sidewalk Ramps $1,939,974 CN, CE CMDO 10/24/2019 Commission Mtg 3 1 9839-000 Granite, Missoula SF199 MSLA HT MEDIAN CABLERAIL Guardrail, Skid Treat, Bridge Rail $762,100 PE HSIP 8/27/2020 Commission Mtg 3 1 9892-000 Lake, Missoula SF189 93N RUMBLE STRIPS Rumble Strips $23,195 PE HSIP 8/27/2020 Commission Mtg 3 1 9893-000 Lake SF189 CURVE S OF RAVALLI Safety $18,390 PE HSIP 8/27/2020 Commission Mtg 3 1 9894-000 Lake SF189 GLOVER RD SAFETY Safety $35,627 PE HSIP 8/27/2020 Commission Mtg 3 1 9895-000 Lake SF189 MINESINGER SAFETY Safety $26,490 PE HSIP 8/27/2020 Commission Mtg 3 1 9897-000 Flathead SF189 TURN LANE ASHLEY LAKE RD Int Improvements $226,655 PE HSIP 8/27/2020 Commission Mtg 3 1 9898-000 Flathead SF189 US93 ALT SAFETY IMPRV Guardrail, Skid Treat, Bridge Rail $104,239 PE HSIP 8/27/2020 Commission Mtg 3 1 9269-000 Lake PABLO AREA SIGNALS Int Upgrade / Signals $127,359 OT CMDP 10/22/2020 Commission Mtg 4 1 9272-000 Lake POLSON AREA SIGNALS Int Upgrade / Signals $133,091 OT CMDP 10/22/2020 Commission Mtg 4 1 9633-000 Flathead, Lake, Ravalli, Sanders SF 179 D1 SIGNS RUMBLE STRIPS Safety $231,331 CN,CE HSIP 8/23/2018 Commission Mtg 4 1 9638-000 Mineral SF 179 HENDERSON CURVE SFTY Safety $215,002 CN,CE HSIP 8/23/2018 Commission Mtg 4 1 9852-000 Granite, Powell I-90 CULVERT - JENS Culvert $2,290,477 CN,CE IM 10/22/2020 Commission Mtg 4 1 9917-000 Granite I-90 EROSION - W OF DRUMMOND Bank Stabilization $375,412 CN,CE IM 10/22/2020 Commission Mtg 4 1 9668-000 Multiple HSIP PROGRAM JOC - MISSOULA Safety $5,550 RW HSIP 8/23/2018 Commission Mtg 6 1 9920-000 Missoula SF199 MARYJANE BROADWAY INTX Int Improvements $991,441 PE,RW,IC,CN,CE HSIP 2/18/2021 Commission Mtg 7 1 N/A Missoula MULLAN BUILD PROJECT Reconstruction $13,000,000 CN Build Grant 2/18/2021 Commission Mtg 7 1 9638-000 Mineral SF 179 HENDERSON CURVE SFTY Safety $11,304 RW HSIP 8/23/2018 Commission Mtg 8 1 9863-000 Missoula W BROADWAY - OLD HWY 10 (MSLA) Mill & Fill $12,400 RW NH 6/25/2020 Commission Mtg 8 1 9317-001 Deer Lodge, Powell DEER LODGE AREA BRIDGES Bridge Rehab $5,701 IC NHPB 6/21/18 Commission Mtg. 9 1 9973-000 Missoula RRXING-LOISELLE LN-W MSLA RR Crossing $307,274 PE,CN,CE RRP-RRS N/A 9 1 9974-000 Missoula RRXING-BECKWITH ST-FRENCHTOWN RR Crossing $213,812 PE,CN,CE RRP-RRS N/A 9 1 9975-000 Powell RR XING - GOLD CREEK RD RR Crossing $294,471 PE,CN,CE RRP-RRS N/A 9 1 9977-000 Missoula, Ravalli US-93 LOLO-FLORENCE STUDY Study - Corridor/Traffic $1,281,234 OT STPX N/A 9 1 9979-000 Flathead KALISPELL-WHITEFISH ACCESS Study - Corridor/Traffic $256,247 OT STPX N/A 9 Total District 1 $32,357,623 Estimated Funding Public Amend- Dist. UPN County Project Name Scope Costs Phases Source Involvement ment 2 9470-000 Broadwater TOWNSEND - NORTH Rehab $22,264 IC NH 8/24/2017 Commission Mtg 2 2 9627-000 Gallatin GODFREY CR - 12M S MANHATTAN Bridge Replacement $27,961 IC STPB 6/27/2019 Commission Mtg. 2 2 9732-000 Broadwater TOWNSEND - EAST Rehab $22,264 IC STPP 6/27/2019 Commission Mtg. 2 2 9819-000 Gallatin RRXING - THORPE RD- BELGRADE RR Crossing $246,312 CN,CE RRP N/A 2 2 9822-000 Park CARTER'S BRIDGE STUDY Study - Corridor/Traffic $500,001 OT STPB N/A 2 2 9823-000 Gallatin RRXING-KELLY CANYON-BOZEMAN RR Crossing $216,404 CN,CE RRP N/A 2 2 9907-000 Gallatin SF189 RUMBLE STRIPS EXIT 298 Rumble Strips $1,193 PE HSIP 8/27/2020 Commission Mtg 3 2 9908-000 Gallatin SF189 SAFETY IMPROVEMENTS P-86 Safety $31,123 PE HSIP 8/27/2020 Commission Mtg 3 2 9909-000 Gallatin, Park SF189 BOZEMAN PASS HFST Safety $48,428 PE HSIP 8/27/2020 Commission Mtg 3 2 9910-000 Gallatin SF189 SAFETY FLASHERS BOZEMAN Safety $74,196 PE HSIP 8/27/2020 Commission Mtg 3 2 9317-001 Deer Lodge, Powell DEER LODGE AREA BRIDGES Bridge Rehab $3,545,382 CN,CE NHPB 6/21/2018 Commission Mtg 4 2 9349-001 Gallatin, Park LIVINGSTON AREA NHS BRIDGES Bridge Rehab $1,025,318 CN,CE NHPB 6/21/2018 Commission Mtg 4 2 9830-000 Gallatin I-90 STRUCTURES - THREE FORKS Bridge Rehab $763,549 CN,CE NHPB 10/22/2020 Commission Mtg 4 2 9888-000 Gallatin HEBGEN LAKE EROSION REPAIR Bank Stabilization $935,231 CN,CE STPP 10/22/2020 Commission Mtg 4 2 9669-000 Multiple HSIP PROGRAM JOC - BUTTE Safety $5,550 RW HSIP 8/23/2018 Commission Mtg 6 2 9746-000 Broadwater, Gallatin, Jefferson BUTTE DISTRICT ADA UPGRADES ADA Sidewalk Ramps $6,379 RW CMDO 10/24/2018 Commission Mtg 6 2 9930-000 Gallatin BELGRADE - INT IMPROVEMENTS Int Upgrade / Signals $318,953 PE NH 10/28/2015 Commission Mtg 6 2 9926-000 Gallatin MAIN STREET - BELGRADE Reconstruction $280,191 PE STPU 2/18/2021 Commission Mtg 7 2 9927-000 Broadwater, Gallatin JEFFERSON R - 2M W THREE FORKS Bridge Rehab $197,407 PE STPB 2/18/2021 Commission Mtg 7 2 9349-001 Gallatin, Park LIVINGSTON AREA NHS BRIDGES Bridge Rehab $5,701 IC NHPB 6/21/18 Commission Mtg. 9 2 9976-000 Powell RRXING-BECK HILL RD RR Crossing $294,471 PE,CN,CE RRP-RRS N/A 9 Total District 2 $8,568,278 Estimated Funding Public Amend- Dist. UPN County Project Name Scope Costs Phases Source Involvement ment 3 9838-000 Glacier US-89 EROSION RPR- TWO MEDICINE Bank Stabilization $18,896 RW,IC STPP 6/27/2019 Commission Mtg. 2 3 9899-000 Teton SF189 CURVE SW OF CONRAD Safety $97,501 PE HSIP 8/27/2020 Commission Mtg 3 3 9900-000 Lewis & Clark SF189 PROSPECT AVE LIGHTING Safety $105,891 PE HSIP 8/27/2020 Commission Mtg 3 3 9901-000 Cascade SF 189 TURN LANE 34TH VAUGHN RD Safety $75,552 PE HSIP 8/27/2020 Commission Mtg 3 3 9902-000 Cascade, Lewis & Clark SF 189 PVMT MARKINGS D3 Striping, Delineation $105,930 PE HSIP 8/27/2020 Commission Mtg 3 3 9903-000 Cascade, Lewis & Clark, Pondera, Teton SF 189 SIGNING SAFETY D3 Safety $8,309 PE HSIP 8/27/2020 Commission Mtg 3 3 9271-000 Cascade NW BYPASS SIGNALS - GREAT FALLS Int Upgrade / Signals $31,840 OT CMDP 10/22/2020 Commission Mtg 4 3 9275-000 Hill HAVRE SIGNAL UPGRADES Int Upgrade / Signals $76,416 OT CMDP 10/22/2020 Commission Mtg 4 3 9280-000 Cascade 14TH ST SW SIGNALS - GF Int Upgrade / Signals $50,944 OT CMDP 10/22/2020 Commission Mtg 4 3 9961-000 Blaine MCCLELLAND FERRY UPGRADES Miscellaneous $6,921 CN FBD N/A 8 Total District 3 $578,200 Estimated Funding Public Amend- Dist. UPN County Project Name Scope Costs Phases Source Involvement ment 4 9885-000 Daniels, Roosevelt, Valley TIMBER BRIDGES - GLASGOW AREA Bridge Replacements $4,028,658 PE STPB-NHPB 6/25/20 Commission Mtg. 1 4 9886-000 Rosebud TIMBER BRIDGES - FORSYTH AREA Bridge Replacements $2,140,225 PE STPB 6/25/20 Commission Mtg. 1 4 9405-000 Roosevelt BROCKTON - WEST Mill & Fill $31,474 IC NH 6/22/2017 Commission Mtg. 2 4 9804-000 Rosebud ROSEBUD CRK RD REPAIR (S-447) Bank Stabilization $8,819 RW,IC STPS 6/27/2019 Commission Mtg. 2 4 8897-000 Sheridan RESERVE - EAST Rehab- Major $1,906,409 PE STPS 8/27/2020 Commission Mtg 3 4 9404-000 Prairie FALLON - SOUTHWEST Mill & Fill $12,776 IC IM 6/22/2017 Commission Mtg 3 4 9904-000 Dawson SF 189 AIRPORT RD GLENDIVE SFTY Safety $51,619 PE HSIP 8/27/2020 Commission Mtg 3 4 9905-000 Custer SF 189 S OF MILES CITY SHLD WID Safety $323,076 PE HSIP 8/27/2020 Commission Mtg 3 4 9906-000 Roosevelt SF 189 WOLF POINT RODEO RD SFTY Safety $32,698 PE HSIP 8/27/2020 Commission Mtg 3 4 9915-000 Roosevelt RRXING-CNTY RD 1013-BAINVILLE RR Crossing $10,221 PE RRP N/A 3 4 9916-000 Roosevelt RR XING - MT13 - MACON SIGNING RR Crossing $38,847 PE RRP N/A 3 4 9583-000 Carter SE OF HAMMOND - SE Overlay $4,898,429 CN, CE NH 6/21/2018 Commission Mtg 4 4 9756-000 Daniels WHITETAIL - NORTH Pulverization $499,677 CN, CE STPS 6/27/2019 Commission Mtg 4 4 9835-000 Carter, Fallon NORTH OF EKALAKA - NORTH Overlay $1,600,916 CN, CE STPP 4/23/2020 Commission Mtg 4 4 9836-000 Carter EKALAKA - SOUTH Chip Seal $582,709 CN, CE STPP 4/23/2020 Commission Mtg 4 4 9837-000 Carter ALZADA - NORTH Chip Seal $4,775,968 CN, CE STPP 4/23/2020 Commission Mtg 4 4 9853-000 Carter ALZADA - SOUTH Overlay $563,319 CN, CE STPS 6/25/2020 Commission Mtg 4 4 9915-000 Roosevelt RRXING - CNTY RD 1013 - BAINVILLE RR Crossing $305,662 CN, CE RRP 10/22/2020 Commission Mtg 5 Page 1 of 5 4 9916-000 Roosevelt RR XING - MT13 - MACON SIGNING RR Crossing $83,243 CN, CE RRP 10/22/2020 Commission Mtg 5 4 9972-000 Valley VANDALIA RA SITE EVALUATION Study $128,031 OT STPX N/A 8 Total District 4 $22,022,776 Estimated Funding Public Amend- Dist.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    5 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us