Adhesives (chemical) Manufacturing Unit at Village Bhadreshwar, District Kutch, Gujrat by M/s Hindustan Adhesives Ltd. ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF July 2017 ADHESIVES (CHEMICAL) MANUFACTURING UNIT AT VILLAGE BHADRESHWAR, DISTRICT KUTCH, GUJRAT SCHEDULE AS PER EIA NOTIFICATION: 5(f) Cat. A PLOT AREA: 0.6 Ha (6000m2) PROPOSED CAPACITY: 20 TPD/ 3000TPM/ 36000 TPA Cost of Project: Rs 10 Crore PROJ ECT P ROPO NEN T M/s HINDUSTAN ADHESIVES LTD (Registered Address: B2/8 Africa Avenue Road, Safdurjung Enclave, New Delhi- 29) E-mail: [email protected] ENVIRONMENTAL CONSULTANT M/s PERFACT ENVIRO SOLUTIONS PVT. LTD. ( (NABET Registered List ‘A’ of Accredited Consultant Organizations / 8TH August 2017/Rev 56/Sr. No 114) 5th Floor, NN Mall, Mangalam Palace Sector 3, Rohini, New Delhi Email: [email protected] Phone No.: 011-49281360 1 Adhesives (chemical) Manufacturing Unit at Village Bhadreshwar, District Kutch, Gujrat by M/s Hindustan Adhesives Ltd. ENCLOSURE 1: EXECUTIVE SUMMARY ............................................................ 4 1. Introduction ................................................................................................. 5 Project Proponent .................................................................................................. 5 2. Project Details .............................................................................................. 5 2.1 Location of the Project .................................................................................... 5 2.2 Terms of Reference ......................................................................................... 6 2.3 Land Use ......................................................................................................6 2.4 Features of the Project .................................................................................... 6 2.5 Details of Products .......................................................................................... 8 2.6 Details of Raw Material .................................................................................... 8 2.7 Manufacturing Processes ...................................................................................8 2.8 Manpower .................................................................................................... 9 2.9 Utility Requirement ........................................................................................9 2.10 Water Management....................................................................................... 10 2.10.1 Water Balance .......................................................................... 11 2.11 Air Emission Management ............................................................................. 11 2.12 Solid and Hazardous Waste ........................................................................... 11 2.13 Project Cost ............................................................................................. 12 3. Environmental Setting .................................................................................. 12 3.1 Study Period ............................................................................................... 12 3.2 Study Area .................................................................................................. 21 3.3 Climatology ................................................................................................ 12 3.4 Ambient Air ................................................................................................ 12 3.5 Water Quality .............................................................................................. 13 3.6 Noise ........................................................................................................ 13 3.7 Soil Quality ................................................................................................. 13 3.8 Biological Environment................................................................................... 13 4. Environmental Impact and Mitigation ............................................................... 14 4.1 Ambient Air ................................................................................................ 14 4.2 Water Environment ....................................................................................... 14 4.3 Noise Environment ........................................................................................ 14 4.4 Land and Soil .............................................................................................. 14 4.5 Solid waste ................................................................................................. 15 4.6 Ecology ...................................................................................................... 15 4.7 Socio-Economic Environment ........................................................................... 15 5. Environment Management Plan ....................................................................... 16 5.1 Management Policy ........................................................................... 16 5.2 Occupational Health and Safety ........................................................... 16 6 Project Benefits .......................................................................................... 17 7 Conclusion ................................................................................................. 18 2 Prepared by M/s Perfact Enviro Solutions Pvt. Ltd. Adhesives (chemical) Manufacturing Unit at Village Bhadreshwar, District Kutch, Gujrat by M/s Hindustan Adhesives Ltd. ENCLOSURE 2. TOR LETTER FROM MOEFCC & TOR COMPLIANCE ........................ 20 ENCLOSURE 3: ENVIRONMENT IMPACT ASSESSMENT REPORT .............................. 35 CHAPTER 1: INTRODUCTION ...................................................................... 36 Chapter 2: PROJECT DESCRIPTION .............................................................. 41 Chapter 3: ENVIRONMENTAL BASE LINE DATA ................................................ 57 CHAPTER 4: ENVIRONMENT IMPACT ASSESSMENT & MITIGATIVE MEASURES ........... 115 4.1 IMPACT & MITIGATION MEASURES .......................................................... 115 CHAPTER 5: ANALYSIS OF ALTERNATIVE RESOURCE & TECHNOLOGIES ................. 127 Chapter 6: ENVIRONMENTAL MONITORING PROGRAMME ................................. 128 CHAPTER 7: ADDITIONAL STUDIES ............................................................. 132 Chapter 8: ENVIRONMENT MANAGEMENT PLAN ............................................. 152 Chapter 9: PROJECT BENEFITS ................................................................ 165 Chapter 10: SUMMARY AND CONCLUSION .................................................... 167 Chapter 11: DISCLOSURE OF ENVIRONMENT CONSULTANT ............................... 169 ENCLOSURE 4. PROPOSED LAYOUT PLAN .................................................... 173 Enclosure 6. List of Plant Machinery ......................................................... 177 Enclosure 7. Air Dispersion Modelling Report .............................................. 179 1. INTRODUCTION ............................................................................ 181 Enclosure 8: Test Reports ...................................................................... 198 Enclosure 9: Socio-Economic Report ......................................................... 238 Introduction: ....................................................................................................... 239 Enclosure 10: Occupational Health and Safety ............................................ 248 Enclosure 11: Security Plan and Action Team .............................................. 252 Enclosure 12: Guidance and Arrangements for Environmental Reporting ............ 256 Enclosure 14: Land Papers ..................................................................... 258 Enclosure 15: MSDS .............................................................................. 263 3 Prepared by M/s Perfact Enviro Solutions Pvt. Ltd. Adhesives (chemical) Manufacturing Unit at Village Bhadreshwar, District Kutch, Gujrat by M/s Hindustan Adhesives Ltd. ENCLOSURE 1: EXECUTIVE SUMMARY Prepared by M/s Perfact Enviro Solutions Pvt. Ltd. 4 Adhesives (chemical) Manufacturing Unit at Village Bhadreshwar, District Kutch, Gujrat by M/s Hindustan Adhesives Ltd. 1. Introduction Proposed project by Hindustan Adhesives Limited. is an Adhesive manufacturing unit at Village Bhadreshwar, Tehsil Mundra, Kutch, Gujarat, wherein adhesive is an Emulsion Polymer (water based) of Butyl Acrylate and Methyl Acrylic Acid. Proposed unit shall be developed in a phase manner with phase I production at 1000 TPM; Phase II at 2000 TPM and Phase III implementation shall be at 3000TPM/ 36000 TPA. The final phase is targeted to be achieved within 5 years from grant of EC. The project has been granted TOR by MoEF & CC on 10.07.2017 by letter No. F. No. J-11011/205/2017-IA. II(I) to M/s Hindustan Adhesives Limited. As per G.O.I EIA Notification the project falls under Category A of Schedule 5(f) of EIA notification 2006 as it is synthetic organic chemical manufacturing industry which falls outside notified industrial area. The unit will be a captive chemical plant which will produce adhesive required to produce specialized BOPP Adhesive Tapes with both Acrylic and Hot-Melt technology, also proposed adjacent to the project site by the proponent. The Project Proponent had applied to GPCB for Consent To
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages196 Page
-
File Size-