Byron Wood Primary School Earldom Road Sheffield S4 7EJ

Byron Wood Primary School Earldom Road Sheffield S4 7EJ

Agenda Item 7b Case Number 18/03845/FUL (Formerly PP-07294381) Application Type Full Planning Application Proposal Demolition of existing school building, erection of two- storey primary school building and provision of hard and soft play facilities Location Byron Wood Primary School Earldom Road Sheffield S4 7EJ Date Received 12/10/2018 Team West and North Applicant/Agent GL Hearn Recommendation Grant Conditionally Time limit for Commencement of Development 1. The development shall be begun not later than the expiration of three years from the date of this decision. Reason: In order to comply with the requirements of the Town and Country Planning Act. Approved/Refused Plan(s) 2. The development must be carried out in complete accordance with the following approved documents: Site Location Plan YO65421A-JMA-01-ZZ-DR-A-00-0012-S4 P01 Site master plan YO65421A-DHL-Z0-Z0-DR-L-00001 P06 - Red Line YO65421A-JMA-01-ZZ-DR-A-00-0005-S4 P07 Proposed Block Plan YO65421A-JMA-01-ZZ-DR-A-00-0010-S4 P02 Elevation North and West YO65421A-JMA-01-ZZ-DR-A-00-2001-S4 P10 Elevation South and East YO65421A-JMA-01-ZZ-DR-A-00-2002-S4 P10 Proposed Ground Floor Plan YO65421A-JMA-01-ZZ-DR-A-00-0001-S4 P13 Proposed First Floor Plan YO65421A-JMA-01-ZZ-DR-A-00-0002-S4 P09 Typical Building Section YO65421A-JMA-01-ZZ-DR-A-00-1001-S4 Section P05 Site Cross Sections YO65421A-DHL-Z0-Z0-DR-L-00009 P03 External Levels Y065421A-DHL-Z0-Z0-DR-L-00013 P04 Page 21 Proposed Roof Plan YO65421A-JMA-01-02-DR-A-00-0003-S4 P03 Phase 1 Construction YO65421A-DHL-Z0-Z0-DR-L-00010_S2 P03 Phase 2 Construction YO65421A-DHL-Z0-Z0-DR-L-00011_S2 P04 Planting Plan YO65421A-DHL-Z0-Z0-DR-L-00003_S2 P03 Landscape Layout Plan YO65421A-DHL-Z0-Z0-DR-L-00002_S2 P10 Trees to be Removed Y065421A-DHL-Z0-Z0-DR-L-00006 P04 Fence and Boundary Treatment Strategy Y065421A-DHL-Z0-Z0-DR-L-00004 P09 Reason: In order to define the permission. Pre Commencement Condition(s) – (‘true conditions precedent’ – see notes for definition) 3. No development shall commence until a traffic regulation order (TRO) has been approved by the Council to secure temporary arrangements for the egress route of construction traffic from the site. The TRO shall have been implemented as approved and the temporary arrangements shall then be provided prior to the arrival of construction traffic. Upon completion of the project, Earldom Road (from its junction with Catherine Road) shall be returned to its original condition. Reason: In the interests of the safety of road users and the amenities of the locality 4. Prior to the commencement of development the embankment to the south of the new school building shall be resurveyed by a suitably qualified ecologist to check for the presence/absence of protected species. Should evidence of protected species be found, works shall immediately cease and the Local Planning Authority should be contacted for advice. The development shall only then proceed in accordance with appropriate mitigation measures the details of which shall have first been submitted to and approved in writing by the Local Planning Authority. Reason: To ensure that protected species, are not adversely affected by the development. 5. In accordance with 'AWA Tree Consultants Arboricultural Method Statement Dwg ref: AWA2381: Tree protection plan' the existing landscaped areas within the site shall be retained and protected from construction activity. Protection of trees shall be in accordance with BS 5837, 2012 (or its replacement) and the protected areas shall not be disturbed, compacted or used for any type of storage or fire, nor shall the retained trees, shrubs or hedge be damaged in any way. The protection measures shall be in place prior to the commencement of development and shall not be removed until the completion of the development. Any damage during construction/demolition works shall be made good by reinstating to the condition/appearance prior to the commencement of the works. Page 22 Reason: In the interests of protecting the identified trees on site. It is essential that this condition is complied with before any other works on site commence given that damage to trees is irreversible. 6. The construction compound shall not be used unless a porous no dig root protection system (geo web or equivalent) has been installed in the areas shown in the 'AWA Tree Consultants Arboricultural Method Statement Dwg ref: AWA2381: Tree protection plan'. The no dig root protection measures shall be in place prior to the commencement of development and shall not be removed until the completion of the development. Any damage during construction/demolition works shall be made good by reinstating to the condition/appearance prior to the commencement of the works. Reason: In the interests of protecting the identified trees on site. It is essential that this condition is complied with before any other works on site commence given that damage to trees is irreversible. 7. No development shall commence until full details of the proposed surface water drainage design, including calculations and appropriate model results, have been submitted to and approved by the Local Planning Authority. This shall include the arrangements and details for surface water infrastructure management for the life time of the development. The scheme shall detail phasing of the development and phasing of drainage provision, where appropriate. The scheme should be achieved by sustainable drainage methods whereby the management of water quantity and quality are provided. Should the design not include sustainable methods evidence must be provided to show why these methods are not feasible for this site. The surface water drainage scheme and its management shall be implemented in accordance with the approved details. No part of a phase shall be brought into use until the drainage works approved for that part have been completed. Reason: In the interests of sustainable development and given that drainage works are one of the first elements of site infrastructure that must be installed it is essential that this condition is complied with before the development commences in order to ensure that the proposed drainage system will be fit for purpose. 8. No development shall commence until detailed proposals for surface water disposal, including calculations to demonstrate a 30% reduction compared to the existing peak flow based on a 1 in 1 year rainfall event have been submitted to and approved in writing by the Local Planning Authority. This will require the existing discharge arrangements, which are to be utilised, to be proven and alternative more favourable discharge routes, according to the hierarchy, to be discounted. Otherwise greenfield rates (QBar) will apply. An additional allowance shall be included for climate change effects for the lifetime of the development. Storage shall be provided for the minimum 30 year return period storm with the 100 year return period storm plus climate Page 23 change retained within the site boundary. The development shall thereafter be carried out in accordance with the approved details. Reason: In the interests of sustainable development and given that drainage works are one of the first elements of site infrastructure that must be installed it is essential that this condition is complied with before the development commences in order to ensure that the proposed drainage system will be fit for purpose. Other Pre-Commencement, Pre-Occupancy and other Stage of Development Condition(s) 9. The existing School Building (Building 1) shall not be demolished until the following additional bat survey work has been undertaken and submitted to and approved in writing by the Local Planning Authority: A, An internal roof void survey carried out using current best practice guidance by a suitably qualified bat ecologist to confirm the presence and location of any bat roosts/activity (this work can be carried out at any time of the year). B, A minimum of two dusk emergence or dawn re-entry bat surveys to be completed between May and August. C, Any necessary mitigation and or avoidance measures. The development shall be carried out and completed in strict accordance with the approved bat surveys, mitigation and avoidance measures. Reason: To ensure that bats, a protected species, are not adversely affected by the development. 10. Within 6 months of the commencement of development, or an alternative time scale to be agreed in writing with the Local Planning Authority details of the number, location and specification of bird and bat boxes to be integrated into the development shall have been submitted to and approved in writing by the Local Planning Authority. The bird and bat boxes shall be provided in accordance with the approved details prior to the first occupation of the development. Reason: In the interest of Biodiversity. 11. Should the clearance of site vegetation and/or trees take place within the bird nesting season (March to August inclusive) a pre site clearance check shall be carried out by a suitably qualified ecologist to establish the presence of nesting birds. If active bird nests are present clearance works can only proceed once all chicks have fledged. Page 24 Reason: In order to ensure that nesting birds are not adversely affected by the development. 12. Upon completion of any measures identified in the approved Remediation Strategy or any approved revised Remediation Strategy a Validation Report shall be submitted to the Local Planning Authority. The development shall not be brought into use until the Validation Report has been approved in writing by the Local Planning Authority. The Validation Report shall be prepared in accordance with Contaminated Land Report CLR11 (Environment Agency 2004) and Sheffield City Council policies relating to validation of capping measures and validation of gas protection measures.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    22 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us