Scharnitz Tunnel

Scharnitz Tunnel

SCHARNITZ TUNNEL SCHARNITZ (AT) CLIENT JOINT VENTURE COMPANY Landesbaudirektion, AT-6020 Innsbruck ARGE Umfahrung Scharnitz BL1 DESIGNER JOINT VENTURE PARTNERS ILF – Beratende Ingenieure ZT GmbH Marti GmbH Österreich, AT-8045 Graz Teerag Asdag, NL Tirol, AT-6175 Kematen CONSTRUCTION PERIOD Gebrüder Haider Bauunter. GmbH, AT-4463 Grossraming 01.2016 – 11.2017 LEAD COMPANY AND TECHNICAL LEAD CONTRACT SUM Marti GmbH Österreich, AT-8045 Graz CHF 25 Mio. (€ 23.1 Mio.) COMMERCIAL LEAD Teerag Asdag, NL Tirol, AT-6175 Kermaten Marti Tunnel AG Seedorffeldstrasse 21 CH-3302 Moosseedorf Tel. +41 31 388 75 10 www.marti-tunnel.ch [email protected] SCHARNITZ TUNNEL SCHARNITZ (AT) PROJECT DESCRIPTION The new bypass Scharnitz is planned with one lane per direction. The project starts at the southern entrance from Scharnitz at km 19.0, of the existing B 177. From there the new route turns left and is crossing the area of the Talboden, then crosses the Giessenbach (bridge Giessenbach) and leads to the north end of the sports field into the 959 m long tunnel Porta Claudia. The tunnel crosses in north-east direction the Arntalkö- pfle and ends just north of Porta Claudia Street. After approximate 100 m the bypass crosses the Isar (Isar- bridge) and merges directly before the state border into the existing B 177. The new road is 2’080 m long and the maximal longitudinal slope is 2.3%. At the beginning of the bypass the existing B 177 in the form of a T-node with a left leading bend is being con- nected. The existing B177 will provide for a connection to the town Scharnitz and the town Seefeld. At the northern end of the bypass the B17 will be connected with a T-node to the new road and tunnel section. WORK DESCRIPTION - OBW portal south and north L=287 m - Bypass Tunnel Scharnitz L=672 m - Drivable escape gallery L=159 m - Noise protection wall - Access portals km 20,633 to 20,720 km 19,000 to 19,674 - Ecological equalisation measures - 2 underground passages 19+505 and 19+610 m - Pedestrian escape gallery GA 19+900 m - Construction of a new football field GEOLOGY - Wetterstein limestone - Kakirit 14.12.2017 - Fault Gouge - Slope debris - Moraine material - Ground moraine Marti Tunnel AG Seedorffeldstrasse 21 3302 Moosseedorf Tel. +41 31 388 75 10 www.marti-tunnel.ch [email protected] .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us