NASA's Space Launch System: a Revolutionary Capability for Science

NASA's Space Launch System: a Revolutionary Capability for Science

National Aeronautics and Space Administration NASA’s Space Launch System: A Revolutionary Capability for Science Bill Hill Deputy Associate Administrator Exploration Systems Development Division NASA Headquarters Stephen Creech Deputy Manager SLS Spacecraft/Payload Integration and Evolution July 2014 Space Launch System Space Launch www.nasa.gov/sls www.nasa.gov/sls SLS: An Evolving Capability Cargo Fairing Launch Abort System 33 ft (10m) Orion, Multi-Purpose Crew Vehicle (MPCV- LMCO) Commonality of Payload Interfaces • Mechanical Interim Cryogenic • Avionics Propulsion Stage (ICPS) • Software (EELV 5m DCSS – Upper Stage & Core Stage Commonality Upper Boeing/ULA) Stage • Same diameter (27.5 ft.) and basic design • Manufacturing facilities, tooling, materials, & processes/practices Core Stage/Avionics • Workforce (Boeing) • Supply chain/industry base • Transportation logistics • Ground systems/launch infrastructure Advanced 5-Segment Solid • Propellants Solid or Rocket Booster Liquid (SRB) (ATK) Commonality of Core Stage (i.e., RP Engines) Boosters Core Stage Engines (RS-25) Commonality of Engines (Aerojet Rocketdyne) Block 1 Evolutionary Path to Future Capabilities Block 2 Capability Initial Capability, 2017-21 • Minimizes unique configurations 130 metric ton 70 metric ton Payload • Allows incremental development Payload www.nasa.gov/sls 8562 Space Propulsion 2014_G. Lyles.2 SLS’ Primary Mandate www.nasa.gov/sls 8335_SLS_JPL.3 Human Spaceflight and Space Science www.nasa.gov/sls SLS Availability for Space Science u SLS is on schedule and within budget for to be available for launches beginning in 2017. u 5-meter payload fairings allow for payload envelopes compatible with current EELVs. u Cargo-launch variants offer the reliability of a human-mission launch and power in excess of any launch vehicle in history. www.nasa.gov/sls SLS Development Milestones www.nasa.gov/sls MSFC_RSA_Update 2014.6 SLS Benefits to Space Science u Greatest mass lift capability of any launch vehicle in the world. Mars Sample Return Deep Space Telescope u Largest payload fairings of any launch vehicle produce greatest available volume. u High departure energy availability for missions through the solar system Europa Clipper Solar Probe and beyond. Uranus Spacecraft Interstellar www.nasa.gov/sls Benefit: SLS Mass Lift Capability Medium/Intermediate Heavy Super Heavy Retired 300’ u SLS initial configuration offers 200’ Retired 70 t to LEO. u Future configurations 100’ offer 105 and 130 t to LEO. ULA SpaceX ULA NASA NASA NASA NASA u Mass capability Atlas V 551 Falcon 9 Delta IV H Space Shuttle Saturn V 70 t 130 t benefits mean larger 160 1800 140 1600 payloads to any (m Payload Volume 120 1400 destination. 1200 100 1000 80 800 60 600 40 3 Payload MassPayload (mT) 400 ) 20 200 0 0 Mass (mT) Volume (m3) www.nasa.gov/sls Case Study: Mars Sample Return u Mars Sample Return was identified as a high priority in the “Visions and Voyages” planetary science decadal survey. u SLS offers single-launch option for Mars Sample Return, versus three launches with EELVs. u Additional benefits of SLS for Mars Sample Return include reduced mission time, increased sample mass, and reduced mission cost, complexity and risk. www.nasa.gov/sls Benefit: Unrivaled Payload Volume u SLS is investigating utilizing existing fairings for early cargo flights, offering payload envelope compatibility with design for current EELVs u Phase A studies in work for 8.4m and 10 m fairing options 4m x 12m 5m x 14m 5m x 19m 8.4m x 31m 10m x 31m (100 m3) (200 m3) (300 m3) (1200 m3) (1800 m3) 10 www.nasa.gov/sls Case Study: ATLAST u Large-aperture spectroscopic telescope was identified as a vital step in the “Enduring Quests, Daring Visions” astrophysics roadmap. u SLS is uniquely enabling for largest- diameter telescopes due to fairing- width requirements. u Additional benefits of SLS for ATLAST include opportunities for human assembly and/or servicing at deep space destinations. www.nasa.gov/sls Benefit: High Departure Energy u Even the Initial configuration of SLS offers orders of magnitude greater payload-to- destination energy compared to existing launch vehicles; future configurations improve C3 performance even further. u Departure energy offers faster transit time to destination, including 4-7 year reduction to Saturn or 6 years to Uranus. u Higher departure energy offers more launch opportunities. u Trade space exists between departure energy and mass capability; a Jovian mission could see 3-year transit reduction or 13 t mass increase. 12 www.nasa.gov/sls SLS Evolved Performance Saturn Saturn/ Lunar Mars Jupiter/Europa via JGA Uranus Direct 70.00# SLS#Block#1#+#Orion#+#iCPS# SLS#Block#1#+#5.0m#Fairing#+#iCPS# 60.00# SLS#Block#1B#+#5.0m#Fairing#+#EUS#(TBD)# SLS#Block#1B#+#8.4m#Fairing#+#EUS# SLS#Block#2B#+#8.4m#Fairing#+#EUS#+#Advanced#Boosters#(min+max)# 50.00# SLS#Block#2B#+#10m#Fairing#+#EUS#+#Advanced#Boosters#(TBD)# Delta#IV#Heavy#+#2007#PPG# Atlas#V#551#NASA#LSP# 40.00# Europa#Class#Mission# 5m#x#19m# 8.4m#x#19m# 10m#x#31m# (300#m3)# (620#m3)# (1800#m3)# # # 30.00# # EM-1 20.00# Net$Payload$System$Mass$(mt)$ 10.00# Europa 0.00# +10# 0# 10# 20# 30# 40# 50# 60# 70# 80# 90# 100# 110# 120# 130# 140# 150# Characteris6c$Energy,$C3$(km2/s2)$ www.nasa.gov/sls Case Study: Europa Clipper u Europa exploration was identified as a high priority in the “Visions and Voyages” planetary science decadal survey. u SLS can provide direct injection to Jupiter, eliminating several years of planetary gravity assists to reduce flight time to Europa from 6.3 years to 2.7. u Additional benefits of SLS for Europa Clipper include reduced operational costs, reduced mission risk, and greater mass margin. www.nasa.gov/sls Outer Planet EELV Trajectories Galileo Trajectory To Jupiter Cassini TrajectoryFigure 5.2 CASSINI - PRIMARY to Saturn MISSION CRUISE TRAJECTORY SATURN ARRIVAL FLYBY (1) FLYBY (2) DEC 8, 1990 DEC 8, 1992 VENUS 1 FLYBY 1 JUL 2004 APR-MAY 1998 LAUNCH OCT 18, 1989 VENUS VENUS 2 FLYBY JUN 1999 FLYBY FEB 10, MANEUVER* 1990 MAR-APR 1998 IDA MANEUVER AUG 28, 1993 JAN 1999 JUPITER JAN 1, 1994 COMPLETE PRIMARY GASPRA MISSION DATA RETURN OCT 29, 1991 DEC 7, 1997 COMET S-L IMPACT OBSERVATIONS 7/94 JUPITER FLYBY E11 JUPITER 30 DEC 2000 MAGNETOTAIL C10 LAUNCH PROBE RELEASE EXPLORATION OCT-NOV 1997 7/13/95 C9 G8 ORBITER DEFLECTION G7 EARTH FLYBY 7/20/95 E6 AUG 1999 5 E4 C3 PERIHELIA PJR G2 MAR 1998 0.68 AU G1 GANYMEDE, CALLISTO, JUN 1999 0.72 AU EUROPA, ENCOUNTERS Cruise: 6.1 yr. JUPITER ARRIVAL IN ORBIT * this maneuver is only needed for launch dates after Oct. 25th AND Io ENCOUNTER Cruise: 6.7 yr. DEC 7, 1995 5-3 19 JUNO Trajectory To Jupiter Atlas V Clipper Trajectory Cruise: 4.9 yr. Cruise: 6.4 yr. www.nasa.gov/sls Europa Trajectory Comparison Atlas V 551: VEEGA SLS: Direct JOI (5/23/24) VGA (5/14/22) JOI (4/4/28) EGA-1 (10/24/23) EGA-2 Launch (10/24/25) (11/21/21) Jupiter’s Orbit Launch (6/5/22) DSM (7/10/22) REDUCES TRANSIT TIME TO EUROPA FROM 6.5 TO 2.7 YEARS 16 www.nasa.gov/sls SLS Secondary Payload Capability u SLS is providing accommodations for secondary payloads on EM-1 and subsequent launches u Secondary payloads will be accommodated in the Orion- MPCV Spacecraft Adapter (MSA) on EM-1 u 6U equivalent volume/mass is the current standard; 12U volume can be accommodated • 12U mass still being evaluated • Additional mounting locations are being evaluated u SLS provides secondary payload science opportunities beyond EELVs capabilities (Lunar and beyond) www.nasa.gov/sls Possible Next Step: ARRM u The Asteroid Redirect Robotic Mission is an early step on NASA’s Path to Mars. u SLS offers reduced transit time, providing earlier redirection of target and/ or greater launch opportunities. u Additional benefits of SLS for ARRM offer the potential for redirecting a larger object and for enabling a wider variety of targets. u SLS could launch an ARRM spacecraft as early as 2019. www.nasa.gov/sls Summary u SLS provides capability for human exploration missions. • 70 t configuration enables EM-1 and EM-2 flight tests. • Evolved configurations enable missions including humans to Mars. u SLS offers unrivaled benefits for a variety of missions. • 70 t provides greater mass lift than any contemporary launch vehicle; 130 t offers greater lift than any launch vehicle, ever. • With 8.4m and 10m fairings, SLS will over greater volume lift capability than any other vehicle. • Initial ICPS configuration and future evolution will offer highest- ever C3. u SLS is currently on schedule for first launch in December 2017. • Preliminary design completed in July 2013; SLS is now in implementation. • Manufacture and testing are currently underway. • Hardware now exists representing all SLS elements. 19 www.nasa.gov/sls Somewhere, something incredible is waiting to be known. — Carl Sagan For More Information www.nasa.gov/sls www.twitter.com/nasa_sls www.facebook.com/nasasls www.nasa.gov/sls 8442_IAC.20 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    20 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us