River Sheaf Porter Brook Key to Options Areas at Risk These Are The

River Sheaf Porter Brook Key to Options Areas at Risk These Are The

A0 2 1 : 5 5 : 9 0 7 1 0 2 / 1 0 ! / ° 4 0 Sheaf Catchment Options Lower Porter defences These are the options that we will be considering and "pinch point" in further detail to alleviate flood risk in Sheffield. removal Sheaf debris Endcliffe Park screen flood storage area improvements Porter Brook Queens Road to Lower Sheaf defences Mayfield flood Sharrow Vale to storage area Ecclesall defences Broadfield Road / Antiques Quarter defences and "pinch point" removal at Saxon Road bridge Abbeydale Road Rural land management to Little London (catchment wide measures) defences Millhouses Park flood storage areas River Sheaf Areas at Risk Areas at potential risk of flooding Improve resilience to flooding (catchment wide measures) Extent of detailed flood risk Abbey Brook mapping for this scheme flood storage area Key to options Slowing the Flow Containing the Flow Resilience Rural land management (catchment wide measures) Indicative location of potential temporary flood storage areas Indicative extent of flood defence options under consideration DP18343 Disclaimer: These maps have been prepared for this consultation process for the purposes of general illustration and as general information only. The information Background map contains Environment Agency information © contained in the maps does not constitute advice and should not be treated as such. The information in the maps is provided without any representations or warranties, Environment Agency and database right © Crown copyright express or implied, as to the accuracy, completeness, reliability or suitability of the information. Any reliance placed on such information is therefore strictly at your own and database rights 2015 Ordnance Survey risk and Sheffield City Council will not be liable for any damages, losses or causes of action of any nature arising from any use of any of the maps. Legend Metres Main Rivers Don Do Nothing M2 2070 200yr maximum flood depths (m) 0 140 280 560 Sheaf Options Shortliste <VALUE> P1 2017-01-04 AB Client DoN N 0 - 4.826399803 Issue Date By Chkd Appd Y SP Do nothing M2 2070 200yr maximum flood depths (m) <VALUE> 0 - 4.037700176 Scale at A0 Job Title 1:12,000 Job No Drawing Status Rose Wharf 78 East Street Preliminary Leeds LS9 8EE Drawing No Issue Tel +44 113 242 8498 www.arup.com 017 P1 MXD Location © Arup.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us