Pratapgarh (Km 80/0) to Padi (Km 180/0)Section of NH-113 SOCIAL IMPACT ASSESSMENT & RESETTLEMENT ACTION PLAN REPORT

Pratapgarh (Km 80/0) to Padi (Km 180/0)Section of NH-113 SOCIAL IMPACT ASSESSMENT & RESETTLEMENT ACTION PLAN REPORT

MINISTRY OF ROAD AND TRANSPORT & HIGHWAY GOVERNMENT OF INDIA ` Consultancy Services for Detailed Project Report for Rehabilitation and Upgrading to 2 Lane/2 Lane with Paved Shoulders Public Disclosure Authorized of Pratapgarh (Km 80/0) to Padi (Km 180/0)Section of NH-113 SOCIAL IMPACT ASSESSMENT & RESETTLEMENT ACTION PLAN REPORT Including Tribal Development Plan Public Disclosure Authorized Starting Point (80+000) Public Disclosure Authorized End Point (180+000) Public Disclosure Authorized January 2014 Rehabilitation and Upgrading of Pratapgarh-Padi of NH 113 Final Detailed Project Report Volume V: SIA, RAP& TDP Social Impact Assessment & RAP Report (FINAL) TABLE OF CONTENTS S. Description Page No ABBREVIATIONS ES Executive Summary ES 1-8 1. PROJECT BACKGROUND AND INTRODUCTION 1-1 to 1-5 1.1 PROJECT BACKGROUND 1-1 1.2 PROJECT ROAD DESCRIPTION 1-2 1.3 PROPOSED PROJECT 1-4 1.4 APPROACH AND METHODOLOGY 1-4 1.4.1 Public Consultations 1-4 1.4.2 Census Surveys and Structure Marking 1-5 2. SOCIO-ECONOMIC PROFILE OF THE PROJECT INFLUENCE ZONE 2-1 to 2-5 2.1 INTRODUCTION 2-1 2.2 SOCIO- ECONOMIC STATUS OF PROJECT INFLUENCE DISTRICT 2-1 2.2.1 Pratapgarh District Profile 2-1 2.2.2 Banswara District Profile 2-2 2.3 PROJECT IMPACT ZONE 2-3 2.3.1 Population Projection 2-4 2.3.2 Literacy Status 2-4 2.3.3 Working and Non- Working Population 2-4 2.3.4 Existing Public Amenities 2-4 3. ANALYSIS OF ALTERNATIVES & PROPOSED IMPROVEMENT PLAN 3-1 to 3-21 3.1 NEED FOR MINIMIZATION OF IMPACT 3-1 3.2 DESIGN CONSIDERATIONS 3-1 3.2.1 Proposed Design Standards for Highway 3-1 3.3 BY-PASSES AND ALTERNATIVE ALIGNMENT 3-3 3.4 ANALYSIS OF ALIGNMENTS 3-5 3.4.1 Ghatol 3-5 3.4.2 Banswara Bypass 3-7 3.4.3 Realignments 3-10 3.5 PROPOSED IMPROVEMENT PLAN 3-10 3.5.1 Pedestrian and Animal Crossing 3-10 3.5.2 Wayside Amenities 3-11 3.5.3 Traffic Control guidance and safety and speed Control Measures 3-11 3.5.4 Design Speed 3-12 MoRT&H Rehabilitation and Upgrading of Pratapgarh-Padi of NH 113 Final Detailed Project Report Volume V: SIA, RAP& TDP S. Description Page No 3.5.5 Horizontal Curves 3-12 3.5.6 Vertical Curves 3-13 3.5.7 Intersections 3-13 3.5.8 Visibility 3-13 3.5.9 Other Issues at Intersections 3-14 3.5.10 Access Control 3-14 3.6 CROSS SECTION, RUMBLE STRIP 3-14 3.6.1 Cross Section 3-14 3.6.2 Rumble Strip 3-16 3.7 ROAD SIGNS, PAVEMENT MARKING, OTHER TRAFFIC 3-16 CONTROL DEVICES 3.7.1 Road Signs 3-16 3.7.2 Pavement Markings 3-17 3.7.3 Traffic Control Devices 3-18 3.8 Safety Issues for Non-Motorized Traffic 3-19 4. PUBLIC INFORMATION AND CONSULTATIONS 4-1 to 4-33 4.1 INTRODUCTION 4-1 4.2 LEVELS OF CONSULTATIONS 4-2 4.3 METHODOLOGY ADOPTED 4-2 4.4 TYPES OF CONSULTATIONS 4-3 4.4.1 General Consultations 4-3 4.4.2 Structured Consultations 4-3 4.4.3 Specific Consultations 4-4 4.5 STAKEHOLDER ANALYSIS MATRIX 4-7 4.6 MAJOR FINDINGS FROM CONSULTATION 4-8 4.7 CONCLUSION/RECOMMENDATIONS 4-31 5. PROJECT IMPACTS 5-1 to 5-16 5.1 INTRODUCTION 5-1 5.2 EXISTING STATUS OF LAND AVAILABILITY 5-2 5.3 LAND ACQUISITION ESTIMATES FOR THE PROJECT STRETCH 5-3 5.4 TYPE OF THE LAND ACQUIRED FOR THE PROJECT 5-3 5.5 IMPACT ON STRUCTURES 5-4 5.5.1 Impact on structures by usage of structure 5-4 5.5.2 Impact on structures by typology of structure 5-5 5.5.3 Impact on Common Property Resources (CPRs) 5-5 5.6 VULNERABLE GROUPS 5-6 5.7 IMPACT ON WOMEN 5-7 5.8 IMPACT ON TRIBALS 5-7 5.9 SOCIO-ECONOMIC PROFILE OF PROJECT INFLUENCED 5-7 MoRT&H Rehabilitation and Upgrading of Pratapgarh-Padi of NH 113 Final Detailed Project Report Volume V: SIA, RAP& TDP S. Description Page No HABITATIONS 5.9.1 Socio-Economic survey 5-7 5.9.2 Affected Households & Persons 5-8 5.9.3 Family Types 5-13 5.9.4 Literacy & Educational Status 5-14 5.9.5 Occupational Pattern 5-14 5.9.6 Income Level 5-15 6 R&R PRINCIPLES, POLICY FRAMEWORK & ENTITLEMENT 6-1 to 6-27 MATRIX 6.1 INTRODUCTION 6-1 6.2 COMPARATIVE ANALYSIS OF APPLICABLE POLICY 6-4 6.3 PURPOSE OF RESETTLEMENT POLICY FRAMEWORK 6-6 6.4 OBJECTIVES AND SCOPE OF RESETTLEMENT POLICY 6-7 FRAMEWORK, NHIIP 6.4.1 Revision/Modification of the RPF 6-8 6.5 Resettlement and Rehabilitation Policy, NHIIP 6-9 6.5.1 Definitions 6-9 6.6 Resettlement Principles and Eligibility Criteria 6-13 6.7 Entitlement Matrix for NHIIP 6-15 6.8 Methods for Assessment of Replacement Cost 6-25 6.9 Direct Purchase of Land 6-27 7 GENDER ISSUE & WOMEN’S PARTICIPATION 7-1 to 7-6 7.1 GENERAL 7-1 7.2 IMPACT ON WOMEN 7-1 7.3 WOMEN HEADED HOUSEHOLD 7-2 7.4 WOMEN INVOLVEMENT IN DEVELOPMENT PROCESS 7-2 THROUGH EMPOWERMENT 7.5 INVOLVEMENT OF WOMEN IN CONSTRUCTION ACTIVITIES 7-4 7.6 SPECIFIC PROVISIONS IN THE CONSTRUCTION CAMP FOR 7-5 WOMEN 7.6.1 Temporary Housing 7-5 7.6.2 Health Centre 7-5 7.6.3 Day Crèche Facilities 7-5 7.6.4 Proper Scheduling of Construction Works 7-6 7.6.5 Educational Facilities 7-6 7.6.6 Control on Child Labour 7-6 7.6.7 Special Measures for Controlling STD/AIDS 7-6 8 TRIBAL IMPACT MITIGATION AND DEVELOPMENT PLAN 8-1 to 8-20 8.1 INTRODUCTION 8-1 8.2 Status of Schedule Tribes in the Project Area 8-1 MoRT&H Rehabilitation and Upgrading of Pratapgarh-Padi of NH 113 Final Detailed Project Report Volume V: SIA, RAP& TDP S. Description Page No 8.2.1 Pratapgarh District 8-2 8.2.2 Banswara District 8-3 8.3 METHODOLOGY FOR TRIBAL ISSUES 8-3 8.3.1 Consultation Methodology 8-3 8.4 Gram Sabha Under PESA 1996 8-4 8.4.1 Consultation Process PESA Act 1996 8-5 8.5 SOCIAL ASSESSMENT OF PROJECT AFFECTED TRIBALS 8-8 8.5.1 Direct Impact Zone 8-8 8.6 PROJECT AFFECTED TRIBAL POPULATIONS AND THEIR SOCIO- 8-8 ECONOMIC STATUS 8.6.1 Affected Tribal Households 8-8 8.6.2 Affected Tribal Population 8-9 8.7 DISTRICT WISE POPULATION 8-9 8.7.1 Marital Status 8-10 8.7.2 Age Structure 8-10 8.7.3 Educational Status 8-11 8.7.4 Employment and Occupation Status 8-12 8.7.5 Language and Culture 8-12 8.7.6 Income 8-13 8.7.7 Live Stock Assets 8-13 8.7.8 Material Assets 8-14 8.8 POTENTIAL IMPACT ON TRIBAL POPULATION 8-14 8.8.1 Impact on Land 8-14 8.8.2 Impact on Structure 8-15 8.9 COMPENSATION AND R&R ASSISTANCES 8-16 8.10 OTHER POSSIBLE IMPACTS TO TRIBAL POPULATIONS AND 8-17 MANAGEMENT/ MITIGATION MEASURES 8.11 CONSULTATION AND PARTICIPATION 8-20 8.12 IMPLEMENTATION ARRANGEMENTS 8-20 8.13 MONITORING ARRANGEMENTS 8-20 9 INSTITUTIONAL FRAMEWORK FOR RAP & TDP 9-1 to 9-15 IMPLEMENTATION 9.1 GENERAL 9-1 9.2 CENTRAL LEVEL 9-1 9.3 STATE LEVEL 9-2 9.4 SUB-PROJECT LEVEL 9-3 9.5 RAP & TDP IMPLEMENTING SUPPORT AGENCY AT SUB- 9-5 PROJECT LEVEL 9.6 REPLACEMENT COST COMMITTEE AT DISTRICT LEVEL 9-8 9.7 ROLE OF VARIOUS STAKEHOLDERS IN PROJECT CYCLE 9-9 MoRT&H Rehabilitation and Upgrading of Pratapgarh-Padi of NH 113 Final Detailed Project Report Volume V: SIA, RAP& TDP S. Description Page No 9.8 CAPACITY BUILDING AND TRAINING 9-11 10 DISCLOSURE AND CONSULTATION PLAN 10-1 to 10-7 10.1 INFORMATION DISCLOSURE 10-1 10.2 CONSULTATION & PARTICIPATION PLAN 10-1 10.3 FRAMEWORK FOR CONTINUED CONSULTATION 10-3 10.4 SUGGESTION AND COMPLAINT HANDLING MECHANISM 10-5 (SCHM) 11 MONITORING AND EVALUATION (M&E) 11-1 to 11-6 11.1 INTRODUCTION 11-1 11.2 INSTITUTIONAL ARRANGEMENT FOR M & E 11-2 11.3 PROCESS & PERFORMANCE MONITORING 11-2 11.4 EVALUATION 11-4 11.5 REPORTING 11-5 12 IMPLEMENTATION ARRANGEMENT AND SCHEDULE 12-1 to 12-14 12.1 IMPLEMENTATION ARRANGEMENT 12-1 12.2 RAP & TDP IMPLEMENTATION 12-2 12.3 STAGES OF RAP & TDP IMPLEMENTATION: A 12-4 METHODOLOGICAL FRAMEWORK 12.3.1 Training and Capacity Building of Project Staff 12-4 12.3.2 Focus Group Discussion, Awareness Campaign and 12-5 Dissemination of Information 12.3.3 Identification, verification and updating of PAP Census 12-5 12.3.4 Micro Plans for Non-title and Title Holders 12-5 12.3.5 Entitlement cum Identity Card 12-5 12.3.6 Opening of Bank Account and Disbursement of Assistance 12-6 12.3.7 Measurement, valuation of private structure and common 12-6 property resources 12.3.8 Rehabilitation of Affected Families and Restoration of 12-6 Income and Livelihood 12.3.9 IEC for HIV/AIDS 12-7 12.4 STEPS IN IMPLEMENTATION- LIST OF ACTIVITIES 12-8 12.4.1 Site Visits / Verification 12-8 12.4.2 IEC Activities and Awareness Campaign 12-8 12.4.3 Land and Building Valuation and Distribution of I-Cards 12-9 12.4.4 Micro-Plans and Assistance Disbursement 12-9 12.4.5 Rehabilitation Process 12-10 12.4.6 Submission of Completion Report 12-10 13 GRIEVANCE REDRESSAL MECHANISM 13-1 to 13-5 13.1 GRIEVANCE REDRESSAL MECHANISM 13-1 13.2 SUGGESTION AND COMPLAINT HANDLING MECHANISM 13-3 (SCHM) MoRT&H Rehabilitation and Upgrading of Pratapgarh-Padi of NH 113 Final Detailed Project Report Volume V: SIA, RAP& TDP S.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    480 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us