Somerset's Common Works Programme 2015/16

Somerset's Common Works Programme 2015/16

Somerset's Common Works Programme 2015/16 - Q3 Progress

The Common Works Programme shows the flood risk and water management works Somerset's Flood Risk Management Authorities are doing, funded from their own budgets. The last section, labelled joint, is for projects that are joint funded, including those that SRA funds are contributing to

Flood Risk Management Authority
For removed For removed
Project Stage
Timescale for Implementation schemes - Reason for removal schemes - Further Action

Ref

  • Project Name
  • District
  • Parish
  • Description
  • Flood Risk Source
  • Progress
  • Comments/Issues

(Funder)

1. Improvement Schemes - Environment Agency Joint Programme of Work attracting either Government Grant in Aid or Local Levy (WRFCC) funding

(see map for EA schemes) www.somersetriversauthority.org.uk/about-us/board-and-partners/board-meetings-and-papers/?entryid108=97703

Initial site visit has taken place. Works are ongoing

Carry out repairs to defence wall and reinstate flood bank to defence level
EA 1 EA 1 EA 2 EA 3
Brue Glastonbury to Cripps Brue Glastonbury to Cripps North Drain

  • Mendip
  • Wedmore

Wedmore Burtle

  • Design
  • EA

EA EA

  • Main River
  • 2015-16

2015-16 2015-16 2015-16

G = on course for delivery in 15/16
Picked up on IDB Enhanced maintenance programme

  • Mendip
  • Desilt and pull banks on River Brue
  • Main River

R = no longer proposed for delivery in 15/16 by
EA
None

None
This work is being carried out by MEICA

Lewis Drove Tilting Weir - Gate major mechanical maintenance, repair motor and gearbox

  • Mendip
  • Main River

G = on course for delivery in 15/16
Funding for specialist asset surveys cut

  • Burnham - Highbridge Clyce
  • Sedgemoor
  • Burnham on Sea andSpecialist asset survey
  • Construction EA
  • Main Rivers and Sea

R = no longer proposed for delivery in 15/16 by
EA
G = on course for delivery in 15/16

EA 3 EA 4
Burnham - Highbridge Clyce Burnham - Huntspill Sluice
Sedgemoor Sedgemoor

  • Burnham on Sea andReplace Mechanical components
  • Design

Design
EA EA
Main Rivers and Sea Main Rivers and Sea
2015-16 2015-16
Outfall - 2 x tidal flaps and 4x vertical gates major mechanical
West Huntspill

East Brent

G = on course for delivery in 15/16

maintenance

This was a legacy project based on old data held in an asset database. This work has Following a cleansing exercise, been reviewed evidence suggests that in the past a and is no number of projects were identified longer

  • EA 5
  • Axe Lower
  • Sedgemoor
  • Reprofile bank slips

EA

  • Main River
  • 2015-16

  • R = no longer proposed for delivery in 15/16
  • with little or no substance.
  • necessary.

None

None None None None
Completed within existing works

EA 6 EA 7 EA 7 EA 7
Tone Villages River Cam River Cam River Cam

  • Taunton Deane
  • Bishops Hull
  • Bank repairs to cover piles and repair rabbit holes

Froglane West Camel stone pitching West Camel FAS Throttle Structure West Camel flap valves
EA EA EA EA
Main River Main River Main River Main River
2015-16 2015-16 2015-16 2015-16

  • B = Complete
  • programme

Completed within existing works

South Somerset West Camel South Somerset West Camel South Somerset West Camel

  • B = Complete
  • programme

Completed within existing works

  • B = Complete
  • programme

Completed within existing works

  • B = Complete
  • programme

PCI production, carry out works in Feb2015

EA 8 EA 8
Tone - Taunton to Bradford Tone - Taunton to Bradford
Taunton Deane Taunton Deane

  • Cheddon Fitzpaine Children's Wood stone revetment
  • Design

Design
EA EA
Main River Main River
2015-16 2015-16

G = on course for delivery in 15/16
Not needed - additional telemetry in place

  • Taunton
  • Replacement of gauge boards x 8

Abbey Mill Bridge 1 every 2 years

R = no longer proposed for delivery in 15/16
G = on course for delivery in 15/16 G = on course for delivery in 15/16
None

Washford River - General Bridge Inspections
EA 9 EA 9
West Somerset West Somerset
Old Cleeve Old Cleeve
Design Design
EA EA
Main River Main River
2015-16 2015-16

In bridges programme for inspection In bridges programme for inspection

Washford River - General Bridge Inspections
For Bye Farm and Watersmeet 1 every 2 years. Query over ownership of both bridges.

Captured in overall EA
This work will still be delivered but culvert

  • EA 9
  • Washford River
  • West Somerset

West Somerset
Deformed culvert with fracture Inspection of culvert
EA EA
Main River Main River
2015-16 2015-16

under a larger generic "Culvert Inspection" project inspection

  • project
  • R = no longer proposed for delivery in 15/16

R = no longer proposed for delivery in 15/17
None None
Captured in overall EA
This work will still be delivered but culvert

EA 10 Minehead to Blue Anchor Coast

under a larger generic "Culvert Inspection" project inspection project

Flood Risk Management Authority
For removed For removed
Project Stage
Timescale for Implementation schemes - Reason for removal schemes - Further Action

Ref

  • Project Name
  • District
  • Parish
  • Description
  • Flood Risk Source
  • Progress
  • Comments/Issues

(Funder)

Works on site with expectation that they will be complete before mid November Local resident would like a tree catcher upstream but we are not sure that this is practicle and we are proposing to review what minor works we can do to reduce flood risk for Dulverton

  • EA 11 Westford Reservoir
  • Taunton Deane

West Somerset
Wellington Dulverton
Section 10 Improvements Tree Catcher

  • Design
  • EA

EA
Main River Main River
2015-16 2015-16

G = on course for delivery in 15/16

EA 12 River Barle – Dulverton

Appraisal

G = on course for delivery in 15/16
This was a legacy project based on old data held in an asset database. Following a cleansing exercise,

  • EA 13 Mark Yeo - Whitehouse Pumping Station
  • Sedgemoor
  • Stone out compound
  • EA
  • Main River
  • 2015-16

evidence suggests that in the past a number of projects were identified Work no longer
R = no longer proposed for delivery in 15/16
G = on course for delivery in 15/16

  • with little or no substance.
  • required
  • None

None

EA 13 Mark Yeo - Stook House Sluice EA 14 Stanmoor Pumping Station S

  • Sedgemoor
  • East Brent
  • Gate - major mechanical maintenance
  • Design

Design
EA EA
Main River Main River
2015-16 2015-16

  • B = Completed within existing works
  • MEICA have completed

Work based on repetitive maintenance schedule - inspection has resulted in planned work not needed.

  • Taunton Deane
  • Burrowbridge
  • Flood Defence (Diesel Pump) Replace 2 pump starters

  • EA 15 Burnham - Brean Cross Sluice
  • Sedgemoor
  • Refurbish tidal flap 2 painting
  • EA
  • Main Rivers and Sea
  • 2015-16

Work no longer

  • required
  • R = no longer proposed for delivery in 15/16

Cheddar Yeo Lower - Cross Moor Pumping Station

  • EA 16
  • Sedgemoor

Sedgemoor Sedgemoor
Compton Bishop Compton Bishop East Huntspill
Replace 2 x pressure transducers Reprofile bank slips
Design Design Design
EA EA EA
Main River Main River Main River
2015-16 2015-16 2015-16

G = on course for delivery in 15/16 G = on course for delivery in 15/16

EA 16 Cheddar Yeo Lower
Brue Cripps to Tidal Limit - Hackness
EA 17
Sluice
Replace 2 hydrostatic and 2 ultrasonic level instruments

G = on course for delivery in 15/16
Works on site, with expectation that all will be complete before mid November

EA 18 Curry Moor Reservoir EA 18 Curry Moor
Taunton Deane Taunton Deane Taunton Deane
Burrowbridge Burrowbridge Taunton
Section 10 Improvements Pumping Station Improvements French Weir Remedials
Construction EA Construction EA
Main River Main River Main River
2015-16

G = on course for delivery in 15/16

  • G = on course for delivery in 15/16
  • In progress

2015-2016 2015-16

G = appraisal element of project on course for delivery in 15/16
Tender will be awarded in two weeks. Works due to start Feb 2017 Tender will be awarded in two weeks

  • EA 19 River Tone
  • Appraisal

Design
EA EA EA
EA 20 Cannington Flood Defence Scheme EA 21 Bruton Reservoir

  • Sedgemoor
  • Cannington
  • Construction of Flood Alleviation Scheme

Section 10 Improvements
Main River Main River
2015-16 2015-16

A = Delayed but recoverable
Works substantially complete with minor works left to complete On course for delivery. Project to go to EA Project Appraisal Board for funding for appraisal stage. Replenishment works to Stolford shingle ridge have been carried out in August.

  • South Somerset Bruton
  • Design

G = on course for delivery in 15/16

  • EA 23 Stolford Flood Defence Scheme
  • West Somerset

Sedgemoor

  • Otterhampton
  • Maintenace of existing scheme
  • Design
  • EA
  • Sea
  • 2015-18

G = on course for delivery in 15/16 G = on course for delivery in 15/16
Public opening on 30/09/2015. Ncpms project completed, managed in future by SWT. Handover of HandS File to Area pending.

  • EA 24 Steart Coastal Management Project
  • Otterhampton

Cannington

  • Ongoing worked linked to Steart project
  • maintenance EA
  • Main River and Sea
  • 2015-19

EA 27 River Frome Scheme EA 28 Parrett Estuary EA 29 Henley Sluice

  • Mendip
  • Improvements (Wallbridge)

Cannington Bends
Appraisal Design
EA EA EA

  • Main River
  • 2016-17

2016-18 2018-19

  • Sedgemoor
  • Main Rivers and Sea

  • Main River
  • South Somerset High Ham
  • Appraisal

Works very nearly completed. Now in 12 month defect period with only a few minor snagging items to sort.

  • EA 30 Saltmoor Pumping Station
  • Taunton Deane
  • Improvements
  • Appraisal
  • EA
  • Main River
  • 2018-2019

G = on course for delivery in 15/16

EA 31 Dunball Sluice EA 32 Roadwater EA 33 Taunton

  • Sedgemoor
  • Puriton
  • Gates Refurbishment

Improvements
Appraisal Appraisal Appraisal
EA EA EA
Main Rivers and Sea Main River
2018-19 2018-19 2020-21
West Somerset Taunton Deane
Old Cleeve

  • Cheddon Fitzpaine Flood Alleviation Improvements
  • Main River

Accelerated scheme - funding over 5 years from 2015 onwards. Design underway Accelerated scheme - funding over 5 years from 2015 onwards. Design underway Accelerated scheme - funding over 5 years from 2015 onwards. Design underway

EA 34 West Sedgemoor Pumping Station EA 35 Gold Corner Pumping Station EA 36 Williton
South Somerset Sedgemoor

  • Improvements
  • Appraisal

Appraisal Appraisal
EA EA EA
Main River Main River Main River
2020-21 2020-21 2020-21

G = on course for delivery in 15/16 G = on course for delivery in 15/17

Improvements

  • West Somerset
  • Flood Defences Scheme

Provisional Scheme

EA 37 Parrett at Langport Right Bank EA 38 Westmoor and Southmoor
South Somerset Mendip
Asset Improvements Asset Improvements
Appraisal Appraisal
EA EA
Main River Main River
2018-19 2019-

Provisional Scheme

Flood Risk Management Authority
For removed For removed
Project Stage
Timescale for Implementation schemes - Reason for removal schemes - Further Action

Ref

  • Project Name
  • District
  • Parish
  • Description
  • Flood Risk Source
  • Progress
  • Comments/Issues

(Funder)

Provisional Scheme

  • EA 39 Parrett Left Bank Langport Thorney
  • South Somerset
  • Asset Improvements

Asset Improvements
Appraisal Appraisal
EA EA
Main River Main River
2019- 2019-
Sedgemoor & South Somerset

EA 40 King’s Sedgemoor Drain

Provisional Scheme Do not appear on accompanying map - Somerset wide work (impossible to show on map)

Bridge inspections onm EA owned bridges to comply with legislation

  • EA 41 Bridge Maintenance Programme (Wessex)
  • Various
  • maintenance EA
  • Main Rivers
  • 2015-21

G = on course for delivery in 15/21

Heavily Modified Water Bodies are at risk of failing to meet Good Ecological Status due to modifications to their hydromorphology. Mitigation measures are required to improve the ecology to Good Ecological Potential without altering the original purpose of the modification i.e. flood defence, land drainage or abstraction. In Wessex Area there is funding to implement mitigation measures where waterbodies are in protected areas, the majority are in the Somerset Levels and Moors.
Water Level Management Plan Heavily
EA 42 Modified Water Body (Water Framework
Directive) Mitigation Measures (Wessex)

  • Appraisal
  • EA
  • Main River
  • 2015-21

Do not appear on accompanying map- Somerset wide work

  • (impossible to show on map)
  • G = on course for delivery in 15/21

Westmoor Favourable Condition (Raised

  • EA 43
  • Mendip
  • Appraisal

Appraisal
EA EA
Main River Main River
2016-17 2016-18

G = on course for delivery in 15/16 G = on course for delivery in 16/18
Work starts w/c 28/09/2015 Out to tender

Water Level Areas remedial)

  • EA 44 River Brue
  • Fish Passage Improvements

Parts ordered, constructed and delivered. Constuction phase imminent.

Allows better control of water levels which can either gravitate or be pumped

  • EA 45 Repairs to sluice - River Penzoy
  • Sedgemoor
  • Westonzoyland
  • Design
  • EA
  • Main River
  • 2015-16

B = Complete

  • G = on course for delivery in 15/16
  • Work to start w/c 5/11/2015

EA 46 Elsons Clyse Outfall Repair EA 47 Pumping Station weedscreen
Sedgemoor Sedgemoor
North Petherton Lympsham
Excludes tidal ingress from the River Parrett Improves pump station effectiveness

  • Design
  • EA

EA
Main River Main River
2015-16

  • 2015-16
  • Appraisal

  • G = on course for delivery in 15/16
  • Civil work required (pile sheeting)

2. Improvement Schemes - Internal Drainage Boards attracting either Grant in Aid or other external grants

(see map for IDB schemes) www.somersetriversauthority.org.uk/about-us/board-and-partners/board-meetings-and-papers/?entryid108=97703

A = delayed but recoverable
G = on course for delivery in 15/16
Investigations ongoing work ongoing

  • IDB 1
  • Minehead investigations & improvements
  • West Somerset
  • Investigation into improvement works
  • Parrett IDB
  • Lowland channel

Lowland channel
2015-16

  • 2015-16
  • IDB 2
  • East and West Waste
  • Mendip
  • Improvements to water level control structures
  • Axe / Brue IDB

3. Improvement Schemes - Internal Drainage Boards funded internally

  • A = delayed but recoverable
  • work ongoing

Old R Axe outfall & Biddisham Lane screen complete

  • IDB 3
  • East Brent Church Road
  • Sedgemoor
  • Urban drainage improvements

Drainage improvements
Axe / Brue IDB Axe / Brue IDB
Lowland channel Lowland channel
2015-16

  • 2015-16
  • IDB 4
  • Biddisham drainage improvements
  • Sedgemoor

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    7 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us