Steel Authority of India Limited Rourkela Steel Plant’S Expansion Project (Environment Clearance Vide Ref.No

Steel Authority of India Limited Rourkela Steel Plant’S Expansion Project (Environment Clearance Vide Ref.No

BY SPEED Steel Authority of India Limited POST Rourkela Steel Plant Rourkela – 769011 Fax : 0661-2510183 Ref.No.: 691/EE/59/231 Date : 19/05/2020 Dear Sir, Sub : Implementation Status of Env. Clearance Conditions issued to RSP. Ref. : EC vide ref.no. F No. J-11011/40/88 – IA.I, dated 24/04/1992. # # # This has reference to the aforesaid Environment Clearance (EC) accorded to Rourkela Steel Plant (RSP) for its Phase-II Modernisation project. The implementation status of the various EC Conditions for the period of October, 2019 – March, 2020 is enclosed for kind perusal. With warm regards, Yours faithfully, For Rourkela Steel Plant, (S N Xess) General Manager I/c Environmental Engg. Department Note : Soft copy mailed to [email protected] To, The Dy. Director General of Forests, Eastern Zone Regional Office, Ministry of Environment Forests & Climate Change, A/3, Chandrasekharpur, Bhubaneswar. – 751023. Environmental Engg. Department, 1 st Floor of OHSC Building, Rourkela Steel Plant, Rourkela Phone : 0661-2510395 Fax : 0661-2510183 Regd. Office : Ispat Bhawan, Lodi Road, New Delhi – 110 003 Anexure -3 Steel Authority of India Limited Rourkela Steel Plant’s Expansion Project (Environment Clearance vide ref.no. F No. J J-11011/40/88 – IA.I, dated 24/04/1992. Half Yearly Report (October 2019 – March 2020) Contact Persons : Sri S N Xess, GM I/c (Env.Engg.) Phone : 0661-2447258 Sri V V R Murty, GM(Env.Engg.) Phone : 0661-2448254 SN. CONDITION STATUS/ ACTION PLAN The project authority must strictly adhere to the Adhered to at the time of establishment. RSP has 1. stipulations made by the State Pollution Control obtained Consent to Operate for the plant @ 4.5 Board and the State Government. MTPA capacity for the year 2019-20. EC obtained for expansion of RSP to 4.2 MTPA of Total Crude Steel Production on 29/01/2008 and the Any expansion of the plant, either with the existing projects were executed and are under operation. 2. product mix or new products can be taken up only with RSP again obtained EC for modernisation of RSP by the prior approval of this Ministry. adding 3 MTPA HSM and other projects on 15/12/2016 which is under installation. The gaseous emissions from various process units should conform to the standards prescribed by the concerned authorities, from time to time. At no time the emission level should go beyond the stipulated standards. In the 3. event of failure of any pollution control system adopted Being adhered to. by the unit, the respective unit should be put out of operation immediately and should not be restarted until the control measures are rectified to achieve the desired efficiency. 4 no. of online Ambient Air Quality Monitoring Provision of seven Air quality monitoring stations should Stations covering all directions and 6 no. of Ambient be provided in consultation with the State Pollution Stations along plant’s boundary for manual Control Board for measurement of SO2, NOx, suspended monitoring of ambient air quality were established particulate matters, etc. also stack emissions should be and are being operated. The monitoring data is being 4. monitored regularly by setting up automatic stack submitted to statutory agencies on monthly basis monitoring facilities. Data on stack emissions along with through mail. The monitored data along with the ambient air quality should be submitted to the State statistical analysis is also submitted on half yearly Pollution Control Board and to this Ministry once in three basis to statutory authorities and the softcopies are months along with the statistical analysis. uploaded to the web sites of MoEFCC & SAIL-RSP. All the air pollution control measures which are being undertaken and are planned to be undertaken in the near future should be to the satisfaction of the pollution All the Pollution Control Projects were executed and 5. Control authorities and within legal requirements and be put in operation. CTO obtained from SPCB and is completed by December, 1993 and a report on the valid up to 31/03/2020. progress of the implementation should be submitted every six months to this Ministry. The Project authorities must examine possibilities of The Sp. Water Consumption has come down reduction in consumption of water to 1/3rd of the 6. to 3.81 m3/TCS in the year 2019-20 from a level of present consumption and submit a comprehensive plant 32.5 m3/TCS in the year 1996-97. to this Ministry within a period of three months. 2 SN. CONDITION STATUS/ ACTION PLAN The usage of blast furnace slag should reach the level of 100% by the time envisaged modernization process is The present BFc slag utilization is 100%. The slag is 7. completed. The utilization plan for the same should be given for Cement manufacturing. submitted to this Ministry within 6 months. With regard to metallic sludge, a detailed plan for it’s The metallic sludge/scrap is recovered and recycled 8. disposal should be prepared and submitted to this back and utilized in steel making. Ministry for approval within six months. The existing effluent treatment facilities should be upgraded/augmented so that treated effluent conforms to the standards, as stipulated by the State Pollution Control Board, or prescribed by the Central Government under the Environment (Protection) Act, All pollution control treatment units were installed, 1986 by December, 1993. Any new facilities likely to be commissioned and presently being operated after 9. created under the modernization process would also getting consent renewal from SPCB every year based on have to comply with the effluent/emission norms. conformance to norms. The present CTO is valid up to Similarly, the emissions from the stacks should conform 31/03/2021. to the stipulated standards latest by December, 1993 failing which legal action will be taken under the provisions of the Environment (Protection) Act, 1986 and the defaulting units would have to be closed down. A dedicated Biological Oxydation and De Penolisation Plant (BOD Plant) was established, commissioned and presently being operated for treatment of Phenol, Ammonia and Cyanide, present in the effluent coming Effluent treatment plant for Coke Oven By-product (CO- from Coke Oven By-product plant. Oil skimming BP) must be provided and oil scrapping facilities for mill facilities and Clafifloculators for removal of mill scales 10 wastes, tar, ammonia removal from CO-BP must be and sediments were established, commissioned and adequately upgraded to achieve the stipulated presently being operated. In addition to the above standards. Sodium Hypochlorite treatment has been introduced in the month of Sept., 2019 for further enhancing the efficiency of BOD Plant. The effluent quality is regularly being monitored and is within the statutory norms. RSP established a dedicated Env. Engg. Department In-plant control measures for checking fugitive with Env. Laboratory with qualified personnel for emissions, spillage of chemicals/raw materials etc. regular inspection, monitoring, sampling and analysis 11. should be provided and properly maintained specially of various pollutions from fugitive emissions, stack in the critical areas like blast furnace, fertilizer, by- emissions and effluents from different units of RSP. product plant, coke oven plant, sintering plant etc. The monitoring report is submitted to statutory authorities on monthly basis. A green belt of adequate width and density should be During 2019-20, 1,46,397 no. of saplings were planted raised all around the plant. A plan for raising a green for expanding Green belt which has been developed 12. belt should be prepared and submitted to this Ministry around the plant by planting more than 49 lakh trees within a period of three months for approval. since inception. The Project authority must set up a laboratory facility An Environmental Laboratory was set up under Env. for collection and analysis of samples under the Engg. Deaprtment for collection and analysis of 13. supervision of competent technical personnel, who will samples under supervision of experienced directly report to the Chief Executive. Environmental Engineers. 3 SN. CONDITION STATUS/ ACTION PLAN The present Environmental Management Cell should be further strengthened, with suitably qualified people, to At present Env Engg. Department is provided with a 14. carry out various functions and should be set up under total of 14 no. of qualified and experienced the control of Senior Executive who will report directly Environmental Personnel. to the Head of the Organization. RSP has established a dedicated Occupational Health Medical surveillance of workers should be done Centre & Clinic inside plant premises with qualified regularly to avoid possibility of contracting 15. doctors and nursing staff for medical surveillance of occupational diseases against the workers engaged in employees. Health check up of all employees is being the various pants and record maintained. carried out regularly. The funds earmarked for the environmental protection measures should not be diverted for and purposes and 16. Being strictly followed. year-wise expenditure should be reported to this Ministry. Conditions that need Special Attention SN. CONDITION STATUS/ ACTION PLAN One more monitoring station should be located in the Civil Township to find out the AAQ level due to the steel plant. All the on-line stack monitoring An AAQMS was installed at Sector#22 of Steel Township. 1. systems should be included in Annual Maintenance AMC has been given for all online monitoring systems. Contract to keep all the electronic systems in functional conditions (Condition No. 4). Dedicated Waste Water Treatment Plants were installed To minimize use of raw water the following efforts & commissioned in different departments for treating be taken: waste water and recycling back the treated water back to i) This discharged water should be recycled to process. reduce specific water consumption further. 2. ii) This effluent can be used for development of The treated water finally discharged from Lagoon is party greeneries in the colony instead of using raw water.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    4 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us