Highway Design Manual Chapter 9

Highway Design Manual Chapter 9

HIGHWAY DESIGN MANUAL CHAPTER 9 - SOILS, WALLS, AND FOUNDATIONS Revision 75 September 15, 2013 This page is intentionally left blank. CHAPTER 9 SOILS, WALLS, AND FOUNDATIONS Contents Page 9.1 INTRODUCTION................................................................................................................9-1 9.2 GEOTECHNICAL INVESTIGATIONS ................................................................................9-2 9.2.1 Geotechnical Reports ...............................................................................................9-2 9.2.2 Subsurface Explorations ..........................................................................................9-7 9.3 SOIL AND FOUNDATION CONSIDERATIONS .............................................................. 9-18 9.3.1 Alignment ............................................................................................................... 9-19 9.3.2 Resurfacing, Restoration, and Rehabilitation (3R) .................................................. 9-20 9.3.3 Widening ................................................................................................................ 9-21 9.3.4 Settlement .............................................................................................................. 9-22 9.3.5 Stability .................................................................................................................. 9-26 9.3.6 Embankment Foundation ....................................................................................... 9-29 9.3.7 Geotechnical Design Guidance for Stormwater Management and Erosion and Sediment Control ................................................................................ 9-32 9.3.8 Underdrains and Edge Drains ................................................................................ 9-45 9.3.9 Cut Slopes ............................................................................................................. 9-51 9.3.10 Frost Heaves and Boulder Heaves ....................................................................... 9-59 9.3.11 Rock Excavation .................................................................................................. 9-60 9.3.12 Excavation, Excavation Protection and Support ................................................... 9-62 9.3.13 Design of Spoil Sites ............................................................................................ 9-63 9.3.14 Optional Borrow Areas ......................................................................................... 9-65 9.3.15 Geotextiles ........................................................................................................... 9-68 9.3.16 Controlled Low Strength Material (CLSM) ............................................................ 9-73 9.3.17 Lightweight Concrete Fill .................................................................................... 9-74a 9.4 RETAINING WALLS AND REINFORCED SOIL SLOPES AND WALLS ........................ 9-75 9.4.1 Definitions .............................................................................................................. 9-75 9.4.2 Wall Types ............................................................................................................. 9-77 9.4.2.1 Externally Stabilized Cut Structures..................................................................... 9-77 9.4.2.2 Externally Stabilized Fill Structures ..................................................................... 9-81 9.4.2.3 Internally Stabilized Fill Structures ....................................................................... 9-85 9.4.2.4 Internally Stabilized Cut Structures ...................................................................... 9-93 9.4.2.5 Miscellaneous ..................................................................................................... 9-94 9.4.3 Proprietary Retaining Wall Systems ....................................................................... 9-95 9.4.4 Wall Selection Process ........................................................................................... 9-95 9.4.5 Wall Design & Detailing .......................................................................................... 9-95 9.4.6 Aesthetic Treatments ........................................................................................... 9-112 9.4.7 Sole Source ......................................................................................................... 9-114 9/15/13 CHAPTER 9 SOILS, WALLS, AND FOUNDATIONS Contents Page 9.5 DEEP FOUNDATIONS .................................................................................................. 9-115 9.5.1 Drilled Shafts ........................................................................................................ 9-115 9.5.2 Driven Piles .......................................................................................................... 9-118 9.5.3 Micropiles ............................................................................................................. 9-120 9. 6 BUILDING CONDITION SURVEY AND VIBRATION MONITORING (NONBLASTING)........... 9-123 9.6.1 General ............................................................................................................ 9-123 9.6.2 Design Considerations ..................................................................................... 9-124 9.6.2.1 Adjacent Sensitive Structures .......................................................................... 9-125 9.6.2.2 Consultation ..................................................................................................... 9-127 9.6.2.3 Action .............................................................................................................. 9-128 9. 7 TRENCHLESS INSTALLATION OF CASING .............................................................. 9-129 9.7.1 General ............................................................................................................ 9-129 9.7.2 Definitions ........................................................................................................ 9-129 9.7.3 Casing, Length, Type, and Size ....................................................................... 9-132 9.7.4 Design Development........................................................................................ 9-133 9.7.5 Submittal Process ............................................................................................ 9-137 9.7.6 Designer Guidance .......................................................................................... 9-138 9. 8 CONTRACT INFORMATION ........................................................................................ 9-140 9.8.1 Earthwork Summary Sheet .............................................................................. 9-140 9.8.2 Specifications .................................................................................................. 9-141 9.8.3 Proposal .......................................................................................................... 9-142 9.8.4 Plans .............................................................................................................. 9-143 9.9 REFERENCES .............................................................................................................. 9-146 APPENDIX 9A - PROPRIETARY WALL SYSTEM EVALUATION PROCESS ..................... 9A-1 9A.1 Procedure Overview .............................................................................................. 9A-1 9A.2 Definitions and Roles ............................................................................................. 9A-1 9A.3 Procedural Guidelines ............................................................................................ 9A-3 9A.4 Steps in the PreApproval Process ......................................................................... 9A-4 9A.5 Related Official Issuances...................................................................................... 9A-6 Attachment 1 Instructions for Preparation of the Application Package ................................... 9A-7 APPENDIX 9B - PROJECT CHECKLIST FOR DETERMINING IF SUBSURFACE EXPLORATIONS ARE REQUIRED ........................................................ 9B-1 APPENDIX 9C - SUBJECT INDEX ....................................................................................... 9C-1 9/15/13 CHAPTER 9 SOILS, WALLS, AND FOUNDATIONS LIST OF FIGURES Figure Title Page 9.2-1 a Drilling in Roadway .....................................................................................9-7 b Drilling in a Parking Lot ...............................................................................9-7 c Drilling on Steep Terrain ..............................................................................9-8 d Drilling on Ice ..............................................................................................9-8 e Drilling with All-Terrain Vehicle (ATV) Drill Rig ............................................9-8 f Drilling on Soft Soils ....................................................................................9-8 g Drilling off a Barge .......................................................................................9-8 9.2-2 a Split Spoon Sampler ................................................................................. 9-10 b Split Spoon Sampler Opened (Split) .........................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    171 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us