Antelope Valley Line Study

Antelope Valley Line Study

Antelope Valley Line Study Final Report AVL ANTELOPE VALLEY LINE STUDY Contract No. PS-2415-3024-03 Final Report Prepared for: Los Angeles County Metropolitan Transportation Authority Prepared by: 444 South Flower Street Suite 800 Review Copy Los Angeles, California 90071 Originator FNichols 9/30/19 In association with: Checker RMarcus 10/9/19 Pacific Railway Enterprises, Inc. Back Checker TLichterman 10/10/19 Rail Surveyors and Engineers, Inc. Format Checker CDavis 10/17/19 Approved by FNichols 10/18/19 October 22, 2019 Contents CONTENTS EXECUTIVE SUMMARY .................................................................................................................. 1 1 INTRODUCTION .................................................................................................................... 1 1.1 Study Purpose .............................................................................................................. 1 1.2 Objectives, Assumptions and Study Scope ................................................................ 2 1.3 Study Participants and Stakeholder/Public Engagement ........................................... 3 2 EXISTING CONDITIONS ........................................................................................................ 4 2.1 Regional Growth and Economic Development .......................................................... 4 2.2 Rail Service ................................................................................................................... 4 2.3 Rail Infrastructure, Stations, Rolling Stock and Facilities .......................................... 6 2.4 Current Operations and Performance ...................................................................... 10 2.5 Travel Markets and Patterns ..................................................................................... 14 2.6 Capital Investment in the AVL ................................................................................... 23 3 FUTURE VISION FOR THE AVL CORRIDOR ...................................................................... 27 3.1 Demographics, Land Development and Economic Activity .................................... 27 3.2 Future Rail Ridership ................................................................................................. 28 3.3 Role and Nature of Rail Service in the AVL Corridor ................................................ 32 4 CURRENT PLANNING CONSIDERATIONS ........................................................................ 35 4.1 Rail Initiatives ............................................................................................................. 35 4.2 Transit Initiatives ....................................................................................................... 42 4.3 Local Development, Economic and Environmental Issues and Concerns .............. 43 4.4 Stakeholder Input and Feedback ............................................................................... 45 5 ANALYSIS FRAMEWORK AND METHODOLOGIES .......................................................... 51 5.1 Methods of Analysis .................................................................................................. 51 5.2 Evaluation Methodology ............................................................................................ 55 5.3 Decision-Making and Implementation Framework ................................................. 58 6 AVL SERVICE SCENARIOS ................................................................................................... 60 6.1 Summary .................................................................................................................... 60 6.2 Rail Service Characteristics........................................................................................ 63 6.3 Operations and Maintenance Costs ......................................................................... 68 6.4 Capacity-Related Infrastructure Projects and Capital Costs to Support Service Scenarios ....................................................................................................... 70 6.5 Service Scenario Evaluation ...................................................................................... 77 6.6 Capital Project Evaluation ......................................................................................... 79 7 IMPLEMENTATION PRIORITIES ......................................................................................... 81 7.1 Phased Implementation Plan .................................................................................... 81 7.2 Operations and Operating Costs .............................................................................. 87 7.3 Capital Investment ..................................................................................................... 88 7.4 Funding Strategies ..................................................................................................... 90 7.5 Future Passenger Service with Multiple Operators in the AVL Corridor ................. 92 7.6 Future Rail Freight Service in the AVL Corridor ...................................................... 102 7.7 Future Decisions and Tradeoffs .............................................................................. 103 Antelope Valley Line Study Final Report October 22, 2019 | Contents 8 NEXT STEPS ........................................................................................................................ 106 8.1 Integrate AVL Study Results into Metrolink Systemwide Plans ............................. 107 8.2 Confirm Near-Term Service Improvements ........................................................... 107 8.3 Advance High Priority Early Capital Projects .......................................................... 107 8.4 Planning and Analysis to Support Future Decision-Making .................................. 108 8.5 Funding Plan for AVL Capital Investment and Service Improvement ................... 110 8.6 Outreach and Collaboration .................................................................................... 110 9 REFERENCES ....................................................................................................................... 111 APPENDICES ............................................................................................................................... 113 Tables Table 2-1: AVL Segments and ROW Characteristics ...................................................................... 7 Table 2-2: Stations Serving AVL Within the Study Area ................................................................. 8 Table 2-3: Antelope Valley Line Train Load Factors at Peak Load Point by Time of Day – Average by Train over First Ten Months of FY 2018 ............................................................... 9 Table 2-4: AVL Segments, Station Groups and Catchment Areas ............................................... 18 Table 2-5: Daily Trips Between AVL Study Area Origin and Destination Zones ......................... 21 Table 2-6: Antelope Valley Line Capital Improvements ............................................................... 25 Table 3-1: Projected Daily Regional Travel Volumes and AVL Boardings, 2028 and 2042 ......... 29 Table 3-2: Existing and Projected Total Daily AVL Boardings, by Station Group........................ 31 Table 5-1: Unit Costs for Estimation of Incremental Operations and Maintenance Cost ......... 54 Table 5-2: AVL Study Evaluation Criteria Focused on Service Scenarios ................................... 56 Table 5-3: AVL Study Evaluation Criteria Focused on Capital Projects ...................................... 57 Table 6-1: Description of AVL Service Scenarios ......................................................................... 62 Table 6-2: Rail Service Characteristics, by Scenario ..................................................................... 63 Table 6-3: Round Trips per Day, by Scenario, for Purposes of Estimating Incremental O&M Costs ............................................................................................................................. 69 Table 6-4: Late Evening Round Trips, by Scenario, for Purposes of Estimating Incremental O&M Costs ........................................................................................................ 69 Table 6-5: Operating Days per Year .............................................................................................. 69 Table 6-6: Annual Round Trips and Revenue Hours, for Purposes of Estimating Incremental O&M Costs ........................................................................................................ 69 Table 6-7: Incremental Annual Operations and Maintenance Costs Compared to Existing AVL Service (Millions of 2018 dollars) ..................................................................... 70 Table 6-8: Rough Order of Magnitude Capital Cost, by Project and Scenario ............................ 76 Table 6-9: Evaluation and Ranking of AVL Service Scenarios ...................................................... 78 Table 6-10: Evaluation and Ranking of AVL Capital Projects ....................................................... 80 Table 7-1: Incremental Annual O&M Cost by Scenario, Compared to Existing Service ............. 88 Table 7-2: Funding Sources .......................................................................................................... 90 Table 7-3: Potential Trip Time Improvements

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    133 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us