Ranunkel ("Ranunculas")

Ranunkel ("Ranunculas")

From Meyers Handarbeitsheft Nr. 14 "Kunststricken" - Picture 29 "Ranunkel" ("Ranunculas") Small Six-Sided Doily In Knitted Lace By Herbert Niebling Diameter: 7.6” (19 cm) using fine sewing silk, and knitting needles U.S. Size 5-0 (1.00 mm); 9.6” (24 cm) using medium weight crochet thread, and knitting needles U.S. Size 1.5 (2.5 mm). To Begin: Cast on 8 stitches and knit 2 rounds, then work 8 repeats per round On all even numbered rounds (not shown) knit, except in double yarn overs work knit 1, purl 1. After Round 40, crochet off: In 1 single crochet, gather every 3 stitches, inserting 10 chains between. WRITTEN INSTRUCTIONS Knitting Term Abbreviations k# = (”k” followed by a number) k1-tbl = Knit 1 through back loop. Knit <number> stitches. sk2p = Slip 1, knit 2 together, yo = Yarn over. pass slipped stitch over. inc1to2 = In same stitch, knit 1, purl 1. k7tog = Knit 7 together, i.e. , skp = Slip 1, knit 1, pass slipped slip 4 together knitwise, stitch over. knit 3 together, pass 4 k2tog = Knit 2 together. slipped stitches over. inc1to7 = In same stitch, (knit 1, purl 1) 3 times, knit 1. 3: K1-tbl, yo. 23: K1-tbl, inc1to2, k7, sk2p, k1-tbl, sk2p, k7, inc1to2. 5: K1-tbl, inc1to2. 25: K1-tbl, yo, k1, yo twice, k1-tbl, k7, sk2p, k7, k1-tbl, yo twice, k1, yo. 7: K1-tbl, k1, yo twice, k1. 27: K1-tbl, inc1to7, skp, yo twice, k2tog, k7tog, k1-tbl, k7tog, skp, 9: K1-tbl, yo, skp, yo twice, k2tog. yo twice, k2tog, inc1to7. 11: K1-tbl, yo, inc1to7, skp, yo twice, k2tog. 29: Inc1to7, k7, skp, yo twice, k2tog, sk2p, skp, yo twice, k2tog, k7. 13: K1-tbl, inc1to2, k7, skp, yo twice, k2tog. 31: Inc1to2 7 times, k7, skp, yo, k2tog, k1-tbl, skp, yo, k2tog, k7. 15: K1-tbl, k1, yo twice, k1-tbl, k7, skp, yo twice, k2tog. 33: K1-tbl, (yo twice, k2) 6 times, yo twice, k1-tbl, k7, sk2p, k1-tbl, 17: K1-tbl, yo, skp, yo twice, k2tog, k7, skp, yo twice, sk2p, k7. k2tog, yo. 35: (Skp, yo twice, k2tog) 7 times, k7, sk2p, k7. 19: K1-tbl, inc1to7, skp, yo twice, k2tog, k7tog, skp, 37: (Skp, yo twice, k2tog) 7 times, k7tog, k1-tbl, k7tog. yo twice, k2tog, inc1to7. 39: (Skp, yo, k2tog) 7 times, yo, sk2p, yo. 21: K1-tbl, yo, k7, skp, yo, k2tog, k1-tbl, skp, yo, k2tog, k7, yo. CHARTED INSTRUCTIONS 7x 39 7x 37 7 7 7x 35 7 7 2 6x 33 7 7 7x 31 7 7 29 Key To Symbols 27 # = (Number within chart) Knit <number> stitches. 7 7 25 #x = (Number within chart followed by ”x") Work 7 7 23 stitch(es) within bold lines and gray back- 7 7 21 ground <number> times. 19 = Yarn over. 7 17 = In same stitch, knit 1, purl 1. 7 15 = Knit 1. 7 13 = Slip 1, knit 1, pass slipped stitch over. 11 = Knit 2 together. 9 = In same stitch, (knit 1, purl 1) 3 times, knit 1. 7 = Knit 1 through back loop. 5 = Slip 1, knit 2 together, pass slipped stitch over. 3 = Knit 7 together, i.e. , slip 4 together knitwise, Knit all stitches. 1-2 knit 3 together, pass 4 slipped stitches over. © Verlag G. Meyers Erben, Zurich, Switzerland Revised Reprint Published by Glenda Hunt (email: [email protected]).

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us