China: Proposed Sichuan and Chongqing Cooperation: Guang’an Demonstration Area Infrastructure Development Project Updated Procurement Plan I. General Public Disclosure Authorized 1. Project information: Country: The People’s Republic of China Borrower: The People’s Republic of China Project Name: China: Proposed Sichuan and Chongqing Cooperation: Guang’an Demonstration Area Infrastructure Development Project Loan/Credit No: Project ID: P133456 Public Disclosure Authorized Project Management Offices: Guang’an Prefecture PMO (at Prefecture Development and Reform Commission); Linshui County PMO (at County Development and Reform Commission) and Qianfeng District PMO (at District Development and Reform Commission) Project Implementing Agencies: Linshui County Yuanfeng Industry Development Company; Linshui Vocational School; and Qianfeng Xinhong Company. Subproject PMOs PIAs Public Disclosure Authorized Linshui County Yuanfeng Industry Development Linshui PMO Linshui Company; and Linshui Guang’an PMO Vocational School Qianfeng Xinhong Qianfeng PMO Qianfeng Company 2. Bank’s approval Date of the procurement Plan: Original approved on November 10, 2014; updated on August. 15, 2017 Public Disclosure Authorized 3. Date of General Procurement Notice: November 10, 2014 (WB5651-11/14) 4. Period covered by this procurement plan: December 2015 to April, 2020. China: Proposed Sichuan and Chongqing Cooperation: Guang’an Demonstration Area Infrastructure Development Project Ⅱ. Goods and Works and Non-Consulting Services 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Procurement Guidelines (January 2011). Expenditure Contract Procurement Method Bank Prior Review Category Value (US$) Goods, IT ≥ 10 million ICB Systems & ≥ 500k to NCB All contracts ≥ USD 4 Non- < 10 million Remarks: Where goods are not million. Consulting normally available within Services China, the method of procurement will be ICB even if the contract value is less than USD 10 million. < 500 K Shopping None N/A DC All contracts ≥ USD 4 million. Works, Supply ≥ 40 million ICB & Installation ≥ 500k to NCB All contracts ≥ USD 15 < 40 million million. < 500 K Shopping None N/A DC All contracts ≥ USD 15million. Notes: ICB: International Competitive DC: Direct Contracting Bidding NA: Not Applicable NCB: National Competitive Bidding 2. Prequalification: Bidders of all ICB works contracts shall pass prequalification in accordance with the provisions of paragraphs 2.9 and 2.10 of the Procurement Guidelines. China: Proposed Sichuan and Chongqing Cooperation: Guang’an Demonstration Area Infrastructure Development Project 3. Proposed Procedures for CDD Components (as per paragraph. 3.19 of the Guidelines: Not Applicable. 4. Reference to (if any) Project Operational/Procurement Manual: Guang’an PMO has prepared a procurement manual, which has been reviewed by the Bank. 5. Any Other Special Procurement Arrangements: Retroactive financing is applicable. Payments shall be limited to contracts procured in accordance with World Bank Guidelines and within the limits specified in the Loan Agreement. 6. Procurement Packages with Methods and Time Schedule China: Proposed Sichuan and Chongqing Cooperation: Guang’an Demonstration Area Infrastructure Development Project 1 2 3 4 5 6 7 8 9 10 11 12 Estimate Estimate Review Expected Procurem Procure Prequali Domestic Contract Contract d Cost d Cost by Bank Bid- Ref. No. ent ment fication Preference Period Remarks (Description) (CNY: (USD: (Prior / Opening Category Method (yes/no) (yes/no) (Month) million) million) Post) Date 1.Linshui subproject Contract signed on July. 17, Installation of sewage interceptors along 2017, contract amount: both sides of Shiba river, the pipe CNY51.5078million diameter D400 ~D1200; Wastewater The contractor is Municipal treatment plant’s influent and treated and Environmental Protection effluent sewers with diameter of d600 LS-1 87.11 14.55 Works NCB No No Post 2017.6 16 Engineering Co. Ltd. Of China and DN800. New construction of the Railway First Group Co. Ltd Linshui No. 3 wastewater treatment plant with capacity of 4000 m3/day currently and 10000 m3/day in the future. New construction of No.2, No.3, No.4, Contract signed on Jan. 26, No.5 road (including drainage, sewer, 2017, contract amount: LS-2 lighting, greening, culverts, traffic 135.75 22.63 Works NCB No No Prior 2016.3 18 CNY68.6667million facilities, etc.) The bid opening at the New construction of 4.76 km No.1 road beginning of October (including bridge, drainage, sewer, 2017.1 LS-3 144.83 24.14 Works NCB No No Prior 18 lighting, greening, culverts, traffic 0 facilities, etc.) The invitation for bids will be Machinery and electronics equipment for advertised on September 1, LS-4 6.80 1.13 Goods NCB No No Post 2017.8 6 Linshui public training center 2017. Contract ids expected be signed by October 31, 2017 Financial business for Linshui public Shopp LS-5 0.30 0.05 Goods No No Post 2017.8 6 Same as LS-4 training center ing Auto maintenance equipment for Linshui Same as LS-4 LS-6 5.39 0.90 Goods NCB No No Post 2017.8 6 public training center to buy China: Proposed Sichuan and Chongqing Cooperation: Guang’an Demonstration Area Infrastructure Development Project 1 2 3 4 5 6 7 8 9 10 11 12 Estimate Estimate Review Expected Procurem Procure Prequali Domestic Contract Contract d Cost d Cost by Bank Bid- Ref. No. ent ment fication Preference Period Remarks (Description) (CNY: (USD: (Prior / Opening Category Method (yes/no) (yes/no) (Month) million) million) Post) Date 2.Qianfeng subproject Contract signed on July 15th, Installation of sewage interceptors along 2015 with contract value of May both sides of Luxi river (length of 13.44 CNY 39,956.615 Yuan, the QF-1 68.57 11.43 Works NCB No No Prior 15, 15 km and pipe diameter DN400 ~ contractor is Panzhihua Road 2015 DN1200) and Bridge Engineering Co., Ltd. The invitation for bids was Construction of 3.28 km industrial issued on July 28, 2017, and avenue (including 3.32 km drainage, the contract is planned to be QF-2 79.80 13.30 Works NCB No No Post 2017.8 18 bridge, lighting, greening, culverts, signed by September 30,, electric facilities, etc.) 2017. Upgrading Luxi riverside urban public Contract signed on March 2015.1 st QF-3 space, length of 1230m, width of 20~ 24.75 4.13 Works NCB No No Post 16 31 ,2016 with the contract 2 60m. amount of CNY 17,502,080.10 The invitation for bids was Construction of Binghe South roads issued on August 6, 2017, and QF-4a (including drainage, lighting, greening, 48.40 8.07 Works NCB No No Post 2017.9 16 the contract is planned to be culverts, electric facilities, etc.) signed by September 30,, 2017. Construction of Binghe North roads 2017.1 QF-4b (including drainage, lighting, greening, 38.90 6.48 Works NCB No No Post 16 2 culverts, electric facilities, etc.) China: Proposed Sichuan and Chongqing Cooperation: Guang’an Demonstration Area Infrastructure Development Project III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Consultant Guidelines (January.2011): Expenditure Contract Value Selection Bank Prior Review Category (US$) Method Consultants ≥ 300,000 QCBS, QBS Firms: All contracts >=USD 2 < 300,000 QCBS, QBS, million; CQS Firms: All SSS contracts >= USD N/A SSS 1 million; N/A IC Individual Consultant: All contracts >=400 K; SSS for individual consultant: All contracts>=USD 400 K All terms of references (TOR) will be reviewed by the Bank Task Team regardless of the contract value Notes: QCBS: Quality- and Cost-Based Selection SSS: Single-Source Selection QBS: Quality-Based Selection IC: Individual Consultant selection procedure CQS: Selection Based on the Consultants’ Qualifications NA: Not Applicable 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than USD500,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: Retroactive financing is applicable. All advance contracting is subject to the Bank’s prior review. Payments will be made only for contracts procured in accordance with the Bank’s Consultant Guidelines and with the limits stipulated in the Loan Agreement. 4. Consultancy Assignments with Selection Methods and Time Schedule China: Proposed Sichuan and Chongqing Cooperation: Guang’an Demonstration Area Infrastructure Development Project 1 2 3 4 5 6 7 8 9 10 11 12 Expected Estimated Estimated Contract Selection Review by Bank Proposals Date of signing Contract Ref. No. Description of Assignment Cost Cost Period Consultant Remarks Method (Prior / Post) Submission the contract Value (CNY:10K) (USD:10K) (Month) Date Urban Capital 2016.9.21 1,300,000. JV of Beijing Helison ZX—1 Investments and Asset 120 20 CQS Post 2015.10 48 00 Consulting Co. Ltd and Management Planning Suzhou Shengjing Contract is Cumulative expected to be ZX—2 Environmental 120 20 CQS Post 2017.7 48 signed by Assessment September 30, 2017 Industrial Value Chain Price water house Jul. 18, ZX—3 Analysis, Marketing 120 20 CQS Prior 2015.4 57 CNY Coopers (Shenzhen) 2016 1,198,000 and Promotion Limited JV of HJI Group Corporation and Project management Sep. 10, USD Sichuan Urban ZX—4 and construction site 720 120 QCBS Prior 2015.4 57 2015 1,415,292.70 Construction supervision Engineering Supervision Co., Ltd. Sichuan Fanglue External RAP
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages8 Page
-
File Size-