CM-SAF Initial Operations Started P. Hechler, M. Werscheck by 31 December 2003 the 5 Years Development Phase of the Satellite Ap

CM-SAF Initial Operations Started P. Hechler, M. Werscheck by 31 December 2003 the 5 Years Development Phase of the Satellite Ap

172 DWD Klimastatusbericht 2003 CM-SAF Initial Operations started P. Hechler, M. Werscheck By 31 December 2003 the 5 years Development Phase of the Satellite Application Fa- cility on Climate Monitoring (cf. KSB 97, p. 76-81; KSB 99, p. 128-129; KSB 2000, p. 188-189) ended formally. Subsequently by 01 Januar 2004 the Initial Operations Pha- se (IOP) started, based on formally signed agreements between Deutscher Wetter- dienst (as Operations Leading Entity) and EUMETSAT as well as between Deutscher Wetterdienst and its CM-SAF IOP partners SMHI (National MetService of Sweden), KNMI (National MetService of the Netherlands), FMI (Finnish Meteorological Institute), RMIB (National MetService of Belgium) and MeteoSwiss (National MetSer- vice of Switzerland) as a new CM-SAF partner. On the occasion of this important milestone, an ‘IOP Kick-off meeting’ was held at DWD premises in Munich from 21 – 24 January 2004. DWD President Udo Gärtner, EUMETSAT Director-General Dr. Tilmann Mohr, MPI for Meteorology Director Prof. Dr. Hartmut Grassl and further high-ranking persons attended the meeting and ex- pressed the outstanding strategic importance of the CM-SAF activity for politicians, decision makers as well as the research and climate community. These arguments were also explained to the press during a joint DWD-EUMETSAT press conference on the first meeting day. The next days comprised joint meetings of the CM-SAF Stee- ring Group (the CM-SAF programmatic authority) and the CM-SAF Board (the CM- SAF technical authority). In the course of these meetings the basic IOP working ar- rangements were discussed and agreed upon including detailed activities for the first 6 IOP months. Fig. 1 DWD premises in Munich Fig. 2 VIP`s at the CM-SAF IOP Kick - off 1st row from left: M. Gärtner, T. Mohr, W. Kusch, 2nd row: Prof. Graßl. Klimastatusbericht 2003 DWD 173 Fig. 3 Model of Meteosat Second Generation Fig. 4 CM-SAF Board members on the roof of the Munich DWD premises In retrospective it can be assessed, that the CM-SAF Development Phase was a huge and successful effort of all contributing partners. With a tight and challenging schedule and a set of internal and external reviews the basis had been build to start initial operations up from 2004. The aim of the IOP is to consolidate the operational CM-SAF system, to extend parts of the products to the Inner Arctic and the full MSG disk, to continue R&D and –as a crucial point- to attract the users of the CM-SAF product suite. To meet the latter aim, a second CM-SAF user workshop is planned within the second half of 2005. In 2007 the transition to the Full Operations Phase is foreseen, starting with a major reprocessing event to provide a consistent product set of the IOP period. For further information see http://www.cmsaf.dwd.de contact: [email protected] Literature Klimastatusbericht 1997, p. 76-81; Klimastatusbericht 1999, p. 128-129; Klimastatusbericht 2000, p. 188-189.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us