Sd/- CHECKLIST of CURRENT AIP SUPPLEMENTS (As on 01 JAN 2021)

Sd/- CHECKLIST of CURRENT AIP SUPPLEMENTS (As on 01 JAN 2021)

AIP SUPPLEMENT INDIA TEL: +91-11-24632950 AERONAUTICAL INFORMATION SERVICE 01/2021 Extn: 2219/2233 AIRPORTS AUTHORITY OF INDIA AFS: VIDDYXAX RAJIV GANDHI BHAVAN FAX: 91-11-24615508 SAFDARJUNG AIRPORT Email: [email protected] 01 JAN 2021 NEW DELHI – 110003 File No. AAI/ATM/AIS/09-09/2021 Following supplement is issued for information, guidance and necessary action. sd/- हﴂ द सﴂ अरव ARVIND SINGH अ鵍यक्ष/CHAIRMAN भारतीय व मानपत्तन प्राधिकरण AIRPORTS AUTHORITY OF INDIA CHECKLIST OF CURRENT AIP SUPPLEMENTS (As on 01 JAN 2021) AIP Title of AIP Supplement Supplement No. 1989 IAL Procedure 33/1989 Kota Aerodrome 1990 NDB IAL Procedure 02/1990 Rourkela Aerodrome 2007 Implementation of air traffic flow management procedures over Bay of Bengal, 25/2007 South Asia and Pakistan through Kabul FIR 2008 RNAV SIDs and STARs 33/2008 Ahmedabad Airport VOR Procedure Runway 27 35/2008 Fursatganj Airport VOR Procedure Runway 09 36/2008 Fursatganj Airport ILS Procedure Runway 27 37/2008 Fursatganj Airport Airports Authority of India AIP Supplement 01/2021 Page 1 of 13 40/2008 Establishment, Operation of a Central Reporting Agency NDB Circling Procedure Runway 04/22 46/2008 Gondia Airport VOR Procedure Runway 04 47/2008 Gondia Airport VOR Procedure Runway 22 48/2008 Gondia Airport 2009 RNAV SIDs & STARs 29/2009 Chennai Airport 2010 Helicopter Routing 09/2010 CSI Airport, Mumbai RNAV-1 (GNSS or DME/DME/IRU) SIDS and STARs 14/2010 RGI Airport, Shamshabad 2011 NON-RNAV Standard Instrument Departure Procedure 09/2011 Cochin International Airport RNAV-1 (GNSS) SIDs and STARs 61/2011 Thiruvananthapuram Airport NON-RNAV SIDs – RWY 27 67/2011 Cochin International Airport RNP-1 STARs & RNAV (GNSS) Approach RWY 27 68/2011 Cochin International Airport 2012 Implementation of Data Link Services I Departure Clearance (DCL) 27/2012 ii Data Link – Automatic Terminal Information Service (D-ATIS) iii Data Link – Meteorological Information for Aircraft in Flight (D-VOLMET) 38/2012 Changes to the ICAO Model Flight Plan Form 2013 RNAV-1 (GNSS) SIDs & STARs 37/2013 Guwahati Airport. 2014 Automatic Dependent Surveillance-Broadcast (ADS-B) Out Based ATS 18/2014 Surveillance Services 2015 RNAV 1 (GNSS) SIDs & STARs 36/2015 Goa Airport (VOGO) Airports Authority of India AIP Supplement 01/2021 Page 2 of 13 2017 RNAV-1 (GNSS) SIDs and STARs 28/2017 Netaji Subhash Chandra Bose International Airport, Kolkata (VECC) RNAV-1 (GNSS/DME-DME-IRU) SIDS AND STARS – 53/2017 Indira Gandhi International Airport, New Delhi (VIDP) Aerodrome Data 65/2017 Chhatrapati Shivaji International Airport, Mumbai (VABB) 2018 Aerodrome Data 27/2018 Bagdogra Airport (VEBD) Aerodrome Data 108/2018 Daman Airport (VADN) Automatic Dependent Surveillance - Broadcast (ADS-B) Out 148/2018 Equipage Mandate in India VOR Procedure RWY 26 (CAT A/B) (DME Required) 150/2018 Jamshedpur Airport (VEJS) VOR Procedure RWY 05, (DME Required) 157/2018 Mundra Airport (VAMA) VOR Procedure RWY 23, (DME Required) 158/2018 Mundra Airport (VAMA) 2019 VOR Procedure Runway 08 06/2019 Jamshedpur Airport, (VEJS) 14/2019 Establishment of Upper Area Control Centre, Guwahati (UGT) Aeronautical Charts 37/2019 Bagdogra Airport (VEBD) Implementation of Indian Satellite Based Augmentation System 58/2019 GPS Aided Geo Augmented Navigation (GAGAN) System Aerodrome Data 61/2019 Goa Airport Aerodrome Data 89/2019 Pune Airport (VAPO) Establishment of Temporary Reserved Areas 127/2019 TRA603(A) and TRA603(B) at Purnea Commissioning of Taxiways and Taxilanes and Decommissioning of Aircraft 184/2019 Stands, Taxiway Rajiv Gandhi International Airport, Shamshabad (VOHS) 2020 Airport Collaborative Decision Making (A-CDM) 19/2020 Lokpriya Gopinath Bordoloi International Airport Guwahati (VEGT) Kempegowda International Airport Bengaluru (VOBL) 34/2020 i. Closure of RWY 09L/27R For Rehabilitation Works ii. Closure of TWY - A, A1, A4, A5, A6, A7, A8, A9 and A11 Airports Authority of India AIP Supplement 01/2021 Page 3 of 13 iii. Closure of TWY-K, Twy-J, Twy-B3, Twy-B4 & Taxilane L4 iv. Closure of Alpha Stands From 69A To 86A Work Activities On Aircraft Movement Areas 57/2020 Chhatrapati Shivaji Maharaj International Airport Mumbai (VABB) [From 16 Jul 2020, 0400 UTC To 19 Dec 2020, 1200 UTC] Instrument Approach Chart – RNP Y RWY 01 58/2020 Khajuraho Airport, Khajuraho (VEKO) Instrument Approach Chart – RNP Y RWY 19 59/2020 Khajuraho Airport, Khajuraho (VEKO) Instrument Approach Chart – RNP Y RWY 09 60/2020 Shirdi Airport, Shirdi (VASD) Instrument Approach Chart – RNP Y RWY 27 61/2020 Shirdi Airport, Shirdi (VASD) Instrument Approach Chart – RNP Y RWY 09 62/2020 Begumpet Airport, Hyderabad (VOHY) Instrument Approach Chart – RNP Y RWY 27 63/2020 Begumpet Airport, Hyderabad (VOHY) Instrument Approach Chart – RNP Y RWY 09 64/2020 Chhatrapati Shivaji Maharaj International Airport, Mumbai (VABB) 70/2020 Establishment of ATS Route V94 71/2020 Establishment of ATS Route W87 Aerodrome Data 72/2020 Jorhat Airport (VEJT) Hot Spot Locations and Re-Designation Of Aircraft Stands In Apron II 74/2020 Indira Gandhi International Airport, Delhi (VIDP) Instrument Approach Chart – ILS RWY 32 75/2020 Thiruvananthapuram Airport, (VOTV) Instrument Approach Chart – VOR RWY14 76/2020 Thiruvananthapuram Airport, (VOTV) Instrument Approach Chart – VOR RWY 32 77/2020 Thiruvananthapuram Airport, (VOTV) Instrument Approach Chart – NDB RWY 04 (Cat A/B) 78/2020 Salem Airport, Salem (VOSM) Instrument Approach Chart – RNP Y RWY 27 79/2020 Aurangabad Airport, Aurangabad (VAAU) Aerodrome Data 80/2020 Rupsi Airport (VERU) Low Visibility Procedures 81/2020 Bhubaneswar Airport (VEBS) Radio Communication Failure Procedures 82/2020 Jaipur International Airport, Jaipur (VIJP) Standard Arrival Charts – Instrument (STAR) & Standard Departure Charts – 83/2020 Instrument (SID), [RNAV1 (GNSS) Surveillance Required] Jaipur International Airport, Jaipur (VIJP) Airports Authority of India AIP Supplement 01/2021 Page 4 of 13 Standard Arrival Charts – Instrument (STAR) & Standard Departure Charts – 84/2020 Instrument (SID), [RNAV1 (GNSS/ DME-DME-IRU) Surveillance Required] Chhatrapati Shivaji Maharaj International Airport, Mumbai (VABB) Instrument Approach Chart – RNP Y RWY 14 85/2020 Chhatrapati Shivaji Maharaj International Airport, Mumbai (VABB) Aerodrome Obstacle Chart – Type A (Operating Limitations) RWY 23 88/2020 Rupsi Airport (VERU) 89/2020 Amendments To ENR 3.1 of AIP India 90/2020 Amendments To ENR 5.2.1 of AIP India Helicopter VFR Routes 91/2020 Dr. Babasaheb Ambedkar International Airport Nagpur (VANP) Aerodrome Data 92/2020 Kalaburagi Airport, Gulbarga (VOGB) Instrument Approach Chart – VOR RWY 05 93/2020 Dibrugarh Airport, Dibrugarh (VEMN) Aerodrome Data 94/2020 Belgaum Airport, Belgaum (VOBM) Establishment of Temporary Reserved Areas 95/2020 TRA502(A) [Nagpur] and TRA502(B) [Nagpur] Establishment of Temporary Reserved Area 96/2020 TRA606 [Prayagraj] Restructuring of Restricted Area 97/2020 VIR 146-A Prayagraj Amendment To Restricted Area 98/2020 VIR 146-B Prayagraj Establishment of Temporary Reserved Area 99/2020 TRA703(A) [Pathankot] Restructuring of Restricted Area 100/2020 VIR 161-A Pathankot-I Establishment of Temporary Reserved Area 101/2020 TRA703(B) [Pathankot] Restructuring of Restricted Area 102/2020 VIR 161-B Pathankot-II Establishment of Temporary Reserved Area 103/2020 TRA704(A) [Chandigarh] Restructuring of Restricted Area 104/2020 VIR 150 Chandigarh 1(A) Establishment of Temporary Reserved Area 105/2020 TRA704(B) [Chandigarh] Restructuring of Restricted Area 106/2020 VIR 151 Chandigarh 1(B) Establishment of Temporary Reserved Area 107/2020 TRA705 [Ambala] Airports Authority of India AIP Supplement 01/2021 Page 5 of 13 Restructuring of Restricted Area 108/2020 VIR 145 Ambala (B) Establishment of Temporary Reserved Area 109/2020 TRA807(D) [Sulur] Restructuring of Restricted Area 110/2020 VOR 182 Sulur-I Establishment of Temporary Reserved Area 111/2020 TRA810 [Car Nicobar] Restructuring of Restricted Area 112/2020 VOR 192 Car Nikobar Establishment of Temporary Reserved Area 113/2020 TRA811(A) [Tambaram] Restructuring of Restricted Area 114/2020 VOR 183-A Tambaram-I Establishment of Temporary Reserved Area 115/2020 TRA811(B) [Tambaram] Restructuring of Restricted Area 116/2020 VOR 183-B Tambaram-II 117/2020 Establishment of Conditional Route J6 118/2020 Establishment of Conditional Route J20 119/2020 Establishment of Conditional Route J21 120/2020 Establishment of Conditional Route J22 121/2020 Establishment of Conditional Route J24 (CDR3) 122/2020 Establishment of Conditional Route J26 123/2020 Establishment of Conditional Route J27 124/2020 Establishment of Conditional Route Z1 [RNP2] 125/2020 Establishment of Conditional Route Z2 [RNP2] 126/2020 ENR 1.9 Air Traffic Flow Management And Airspace Management Instrument Approach Chart – RNP Y RWY 09 127/2020 Jaipur Airport, Jaipur (VIJP) Instrument Approach Chart – RNP Y RWY 09 128/2020 Chaudhary Charan Singh Airport, Lucknow (VILK) Instrument Approach Chart – RNP Y RWY 27L 129/2020 Kempegowda International Airport, Bengaluru (VOBL) Aerodrome Data 130/2020 Vadodara Airport, Vadodara (VABO) Airports Authority of India AIP Supplement 01/2021 Page 6 of 13 Instrument Approach Chart – ILS RWY 22 131/2020 Vadodara Airport, Vadodara (VABO) Instrument Approach Chart – VOR RWY 04 132/2020 Vadodara Airport, Vadodara (VABO) Instrument Approach Chart – VOR RWY 22 133/2020 Vadodara Airport, Vadodara (VABO) Aeronautical Charts 134/2020 Coimbatore Airport, Coimbatore (VOCB) Aerodrome Data 135/2020 Imphal Airport, Imphal (VEIM) Commissioning of

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    13 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us