Glenwood Overpass Project Handout

Glenwood Overpass Project Handout

Hwy 29 Overpass LEGEND N The Minnesota City/TownshipDepartment Boundary of Transportation and Pope County PROJECT OVERVIEW: NWI Wetlands are partnering onExis�ng a ROWproject to build an overpass at the junction of Railroad ROW LEGENDHwy 29 and Hwy 55. The overpass will eliminate an “at grade” crossing N Proposed New ROW withCity/Township the CP Boundary RailwayRemoved System. Roadway NWI Wetlands New Roadway Exis�ng ROW LEGENDRailroad ROW N Proposed New ROW RemovedCity/Township Roadway Boundary NewNWI WetlandsRoadway PROJECT COMPONENTS: # Exis�ng ROW 1 Railroad ROW Proposed New ROW Realignment of Highway 55 to 29 #1 55 Removed Roadway reduce the length of the bridge New Roadway over the highway. Access to Highway 29 will be removed #2 and moved to 160th Street. 29 55 on Hwy 29 over the #2 New bridge 29 55 existing railroad and realigned 29 55 Highway 55. 160th St , one on #3 Two new roundabouts #3 Highway 29 and one on Highway 29 55 55 at the intersections with 160th Street. 160th St 29 55 29 160th St Learn more and sign up for email updates: Glenwood 55 www.dot.state.mn.us/d4/projects/glenwoodoverpass PROJECT29 BENEFITS: Glenwood 55 29 Glenwood Safer 55 Improved mobility Eliminate Reduced emergency intersections and traffic flow railroad crossing response times PROJECT CONTACT: CONNECT WITH MNDOT Lori Vanderhider, PE, Project Manager facebook.com/mndot @mndotwcentral 218.846.7955 [email protected] Hwy 29 Overpass WHAT TO EXPECT DURING CONSTRUCTION: Phase 1 55 29 DETOUR MAP 2021 • Realignment of Highway 55 near Highway 29 • Construction of a roundabout on Highway 55 at 160th Street • Reconstruction of 160th Street, which connects 29 55 Highway 55 and Highway 29 Glenwood • Hwy 55 construction and detour begins: 28 July 19, 2021 28 Phase 2 DETOUR29 MAP 2022 82 55 • Construction of the 114 Highway 29 overpass 55 bridge 29 Trac travels on new • Construction of a Hwy 55 alignment roundabout on Highway 29 114 29 at 160th Street 24 Glenwood 55 28 • Hwy 29 overpass bridge construction and detour 28 Lake Minnewaska begins: Spring 2022 114 Starbuck 28 PROJECT CONTACT: CONNECT WITH MNDOT Lori Vanderhider, PE, Project Manager facebook.com/mndot @mndotwcentral 218.846.7955 [email protected].

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us