The Interstate 295 Project : Construction Advisories, Week of September 13, 2010

The Interstate 295 Project : Construction Advisories, Week of September 13, 2010

Maine State Library Digital Maine Transportation Documents Transportation 9-13-2010 The Interstate 295 Project : Construction Advisories, Week of September 13, 2010 Maine Department of Transportation Follow this and additional works at: https://digitalmaine.com/mdot_docs Construction Advisories Week of September 13, 2010 (Alert!) New traffic patterns on several bridges: This week, MaineDOT contractors will begin shifting lane closures on several bridges on I-295 southbound in the Portland area from the center to the left lane. These lane closures are 24/7, with two lanes of traffic open during daylight hours. (Alert!) Several Exits and On-Ramps will be closed according to the following planned schedule for this week: o The on-ramp to I-295 southbound from Forest Ave. may be closed nightly from 7PM to 6AM o Southbound Exit 11 (Maine Turnpike Spur) will be closed Tuesday night 9/14 and Wednesday night 9/15 from 7PM to 6AM o The on-ramp to I-295 southbound from Bucknam Road will be closed Wednesday night, 9/15 and Thursday night, 9/16 from 7PM to 6AM o I-295 southbound Exit 10 (US1 & Rt 9, Bucknam Road) will be closed Thursday night, 9/16 and Friday night, 9/17 from 7PM to 6AM. o I-295 southbound Exit 6B (Forest Ave. North) will be closed Friday night, 9/17 from 7PM to 6AM o Detours will be established for all above exit closures. The 24/7 closure of the Veranda St. southbound on-ramp to I-295 has been extended to early October. This 24/7 closure is a safety precaution, due to bridgework and lane closures on I-295 where traffic normally enters from the Veranda St. on-ramp. Drivers from the Falmouth area are encouraged to use the I-295 southbound on-ramp at Exit 10 (Bucknam Road). Sunday through Friday nights: I-295 Exit 7 (Franklin St.) will be closed – either the southbound or northbound off-ramp – nightly from 7PM to 6AM, Sunday through Friday nights. Only one off-ramp will be closed at any one time. A detour will be established using alternative nearby exits. The I-295 southbound off-ramp at Exit 5B (Congress St. West) and southbound on-ramp from Park Avenue remain closed 24/7. This closure will continue until work is completed on the bridges that are just south of that exit. Detours have been established. Overnight Lane Closures Continue For Paving and Bridgework On I-295 Northbound Lanes: o Milling and paving operations continue on I-295 northbound from just north of the Falmouth Spur at mile marker 13. Drivers should use caution, as there will be uneven lanes and high shoulders. o Overnight lane closures will occur between 8PM and 7:30AM. Drivers are strongly encouraged to sign up for email alerts at mainedot.gov. .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us